[HISTORY: Adopted by the Water Department of the Town of
Wayland 7-23-1996. Amendments noted where applicable.]
A. The fee per connection to the public water supply system shall be
as follows:
|
Connection
(inches)
|
Fee
|
|
1
|
$ 750
|
|
1 1/4 to 2
|
1,000
|
|
3 to 5
|
1,000
|
|
6
|
1,200
|
|
8
|
1,500
|
B. The Water Department will make a one-inch tap and supply a corporation
valve, one-inch PE IPS tubing, curb stop and service box at the property
line at no additional cost.
For all connections one inch and larger:
A. The contractor must obtain a street opening permit from the Highway
Department. A copy is to be furnished to the Water Department.
B. The contractor will be responsible for the excavation to the water
main and provide proper safety measures (i.e., for excavations of
five inches and greater shoring is required).
C. The contractor will provide all materials, equipment and personnel
to perform taps greater than one inch. This will include the corporation
valve, water service line, curb stop and service box. All materials
must meet Water Department specifications.
D. The contractor must backfill and restore the road and/or sidewalk
area according to the requirements of the Highway Department's
street opening permit.
E. The contractor must notify the Water Department at lease 48 hours
before commencement of any work. The Water Department will mark the
location of the water main before excavation can begin.
F. The water service line from the main to its termination at the water
meter inlet valve must be inspected by the Water Department before
the contractor may backfill.
G. The Water Department will install the water meter, including inlet
and outlet valves. The owner of the property is responsible for the
cost of the meter, inlet and outlet valves and any other parts and/or
labor costs necessary for installation of the water meter.
H. The contractor must notify the Police Department and arrange for
any required police details.