Except as provided in §
150-39, no industrial user shall discharge or cause to be discharged any wastes either directly or indirectly into the Village treatment works without first obtaining a sewer use permit issued by the Village.
New industrial users which desire to locate into the Village sewer service area or existing industrial users which desire to commence operations at a new facility within the Village shall apply for and receive a sewer use permit prior to the commencement of operations at the new facility. For the purposes of this section, any industrial user who has ceased discharging industrial wastes for a period of 30 days or more shall be considered to be a new industrial user except for permitted seasonal dischargers. A change in ownership or lease arrangement of the facility shall cause an industry to be a new industrial user for purposes of this section. All new categorical industrial users are required to submit baseline monitoring reports and comply with §
150-30B.
All industrial users discharging industrial wastes directly or indirectly to the Village treatment works prior to the effective date of this Part
1 are hereby granted temporary authority to discharge these wastes. This temporary authority shall expire 90 days after the effective date of this Part
1. Any person discharging pursuant to the temporary authority provided for hereby is subject to all provisions of this Part
1 and such authority may be suspended or revoked in accordance with the various terms and provisions set forth in this Part
1. Prior to the expiration of 90 days each existing industrial user shall apply for a sewer use permit in accordance with §
150-37 et seq. Any industrial user which complied with this section as set forth in the predecessor to this Part
1 shall be deemed to have complied with this section.
If a permittee wishes to continue discharging
to the Village treatments works, he shall request a renewal of his
sewer permit no less than three months prior to the expiration date
of the permit then in force. Failure to make a timely application
will result in the expiration of the permit. The request shall be
contained in a form prepared by the Village. Renewal of the permit
shall be contingent upon the permittee having complied with the terms
and conditions of the existing permit. Sewer use permit application
forms shall be available at the office of the Village Clerk.
Permits will expire as indicated in the permit, but no longer than five years. Renewal of the permit will be dependent upon compliance with the terms and conditions included in §
150-40.
Any industrial user that proposes to make any
changes in its facility or processing which significantly affects
either the quality or quantity of its discharge to the Village treatment
works shall apply for an amended permit on forms provided by the Village.
The amended permit must be obtained prior to such change.
Sewer use permits are issued to a specific industrial user for a specific operation and are not transferable. A permit shall not be reassigned or transferred or sold to a new owner, new industrial user or a new or changed operation. The permittee shall notify the Superintendent within 14 days of any change in ownership or corporate structure, and shall proceed in accordance with §
150-38.