Actual Cost
|
Base Fee
|
Plus Incremental Fee
|
---|---|---|
$0 to $2,000
|
$50
|
None
|
$2,001 to $4,000
|
$70
|
None
|
$4,001 to $6,000
|
$90
|
None
|
$6,001 to $8,000
|
$110
|
None
|
$8,001 to $10,000
|
$130
|
None
|
$10,001 to $12,000
|
$150
|
None
|
$12,001 to $14,000
|
$170
|
None
|
$14,001 to $16,000
|
$190
|
None
|
$16,001 to $18,000
|
$210
|
None
|
$18,001 to $20,000
|
$230
|
None
|
$20,001 to $22,000
|
$250
|
None
|
$22,001 to $24,000
|
$270
|
None
|
$24,001 to $26,000
|
$290
|
None
|
$26,001 to $28,000
|
$310
|
None
|
$28,001 to $30,000
|
$330
|
None
|
$30,001 to $32,000
|
$350
|
None
|
$32,001 to $34,000
|
$370
|
None
|
$34,001 to $36,000
|
$390
|
None
|
$36,001 to $38,000
|
$410
|
None
|
$38,001 to $40,000
|
$430
|
None
|
$40,001 to $42,000
|
$450
|
None
|
$42,001 to $44,000
|
$470
|
None
|
$44,001 to $46,000
|
$490
|
None
|
$46,001 to $48,000
|
$510
|
None
|
$48,001 to $50,000
|
$530
|
None
|
$50,001 to $52,000
|
$550
|
None
|
$52,001 to $54,000
|
$570
|
None
|
$54,001 to $56,000
|
$590
|
None
|
$56,001 to $58,000
|
$610
|
None
|
$58,001 to $60,000
|
$630
|
None
|
$60,001 to $100,000
|
$150
|
.009 x Actual Cost
|
$100,001 to $500,000
|
$375
|
.007 x Actual Cost
|
$500,001 to $1,000,000
|
$1,475
|
.005 x Actual Cost
|
$1,000,001 and Over
|
$3,675
|
.003 x Actual Cost
|
Purpose
|
Fee
| |||
---|---|---|---|---|
Demolition1 of:
| ||||
$50
| ||||
Frame building up to 3 stories in height
|
$150
| |||
Any other structure
|
$300, plus $135 for each full 5,000 square feet
of building floor area
| |||
Installation of exterior paved area or parking
lot
|
$100
| |||
Installation, alteration, repair or removal
of a flammable liquid storage facility
| ||||
Per tank
|
$100
| |||
Per pump
|
$80
| |||
Installation of other structures such as tents,
amusement devices, temporary classrooms or construction trailers where
it is impractical to base a fee on cost
| ||||
Deck
| ||||
< = 144 square feet
|
$75
| |||
> = 144 square feet
|
$100
| |||
> = 400 square feet
|
$150
| |||
Wood-burning stove, solid fuel device, fireplace
insert, gas fireplace
|
$100
| |||
Swimming pool
|
$50
| |||
Electrical inspections
| ||||
Residential
| ||||
New dwelling unit with service
|
$175 + $75 per each additional unit
| |||
Renovation/addition
| ||||
Less than or equal to 200 square feet
|
$100
| |||
Greater than 200 and up to 1,000 square feet
|
$125
| |||
Greater than 1,000 square feet
|
$150
| |||
Commercial new construction or alteration/renovation
| ||||
Less than or equal to 1,500 square feet
|
$150
| |||
1,501 to 5,000 square feet
|
$275
| |||
Greater than 5,000 square feet
|
$275 + $0.05 per square foot
| |||
(All above-listed fees do not include service
installation.)
| ||||
Alarm system
|
$70
| |||
A/C or heat pump
|
$70
| |||
Elevator/escalator
|
$70
| |||
Fuel dispensing unit
|
$70
| |||
New service installation or upgrade less than
or equal to 200 amps each
|
$100 + $35 per each additional meter
| |||
New service installation or upgrade greater
than 200 amps each
|
$140 + $35 per each additional meter
| |||
Other
|
$70
| |||
Pool/hot tub wiring
|
$70
| |||
Reinspection fee
|
$50
| |||
Safety inspection (2 meters or fewer)
|
$70
| |||
Safety inspection (more than 2 meters)
|
$70 + $10 per meter over 2
| |||
Signs
|
$70
| |||
Temporary service installation
|
$70
| |||
Exterior lighting
|
$70
| |||
Pole lights
|
$70 + $10 per pole
| |||
Plumbing inspections:2,3
| ||||
Base fee for all plumbing permits
|
$80
| |||
In addition to the base fee, plumbing permit fees shall be as
follows:
| ||||
Fixtures: installation, removal or capping of each fixture
|
$10
| |||
Building sewers
|
$45
| |||
Sump pumps:
| ||||
Residential
|
$15
| |||
Single (commercial)
|
$35
| |||
Duplex (commercial)
|
$75
| |||
Catch basins or yard drains, each
|
$50
| |||
Parking area trench drains, each
|
$20
| |||
Outside conductors (residential), each
|
$5
| |||
Conductors or roof drains (commercial), each
|
$10
| |||
Sewer ejectors:
| ||||
Single
|
$20
| |||
Double
|
$35
| |||
Hot-water heaters (over 70 gallons' capacity), each
|
$30
| |||
Hot-water heaters (70 gallons' capacity or less), each
|
$10
| |||
Commercial and industrial establishments, including restaurants:
| ||||
Garbage disposals, each
|
$35
| |||
Dishwashing machines, each
|
$40
| |||
Grease interceptors, each
|
$40
| |||
Ice-cube-making machines, each
|
$25
| |||
Laundry-washing machines, each
|
$35
| |||
Backflow prevention devices (installation):
| ||||
Size from 1/4 inch to 3/4 inch, each
|
$10
| |||
1 inch to 1 1/2 inches, each
|
$15
| |||
More than 1 1/2 inches, each
|
$30
| |||
Water service renewal:
| ||||
Renewal of water service, less than 2 inches, without any street
work, each
|
$85
| |||
Water main services in property line of 3/4 inch to 2 inches,
each
|
$35
| |||
Water main and sewer repairs or renewal, public or private,
over 2 inches
|
$35 for the first 60 feet; each additional 100 feet: $10
| |||
Cleanouts at property line, each
|
$35
| |||
Manholes in property line, each
|
$35
| |||
Sand interceptors, each
|
$35
| |||
Oil interceptors (all types), each
|
$35
| |||
Future use openings, each
|
$10
| |||
All notice and order plumbing violations, each
|
$10
| |||
Repair or replacement of gas supply, domestic water, storm,
sanitary or vent piping
|
$10 for the first 100 feet, and $2 per foot thereafter
| |||
Reinspection or callback when work is not ready for inspection,
each
|
$50
|
NOTES:
| |
1For demolition work
done after 5:00 p.m. on weekdays or at any time on weekends, an additional
fee equal to the demolition fee shall be charged.
| |
2 For items not listed in the Fee
Schedule, the permit fee shall be established by the Commissioner
of Neighborhood and Business Development.
| |
3 For any inspections requested on
Saturdays, Sundays, holidays or other than regular working hours,
the rate shall be $50 per hour. A minimum of four hours may be charged
if the inspector was called in and/or has no other inspections during
the four hours.
|
Type Fees
|
Base Fee
|
Plus Incremental
| |
---|---|---|---|
Single-family
|
$60
|
None
| |
Two-family
|
$80
|
None
| |
3 or more dwelling units
|
$100
|
$10 for each additional unit over 5
| |
Mixed commercial/residential occupancy
|
$100
|
$10 for each additional commercial/residential
unit over 5
| |
Rooming house
|
$100
|
$10 for each additional rooming unit over over
5
|
Type
|
Fee
|
Per Square Foot of Gross Floor Area
| |
---|---|---|---|
All uses
|
$100
|
0 to 25,000
| |
$150
|
25,001 or more
|