[Amended 4-11-2012 by Ord. No. 2012-02]
The Land Use Board has certain powers to expedite
the review process. Its responsibilities are outlined as follows:
A. Powers of the Land Use Board.
(1) The Land Use Board shall have the power to grant subdivision
or conditional use approval simultaneously with site plan approval.
(2) The Land Use Board shall have the power to act on
the following matters when the Land Use Board is reviewing applications
for approval of subdivision plans, site plans or conditional uses.
Whenever relief is requested pursuant to this subsection, public notice
shall be given and shall include reference to the request for a variance
or direction for issuance of a permit, as the case may be.
(a)
Grant variances pursuant to N.J.S.A. 40:55D-70c.
(b)
Direct, pursuant to N.J.S.A. 40:55D-34, for
issuance of a permit for a building or structure in the bed of a mapped
street or public drainageway, flood control basin or public area reserved
pursuant to N.J.S.A. 40:55D-32.
(c)
Direct, pursuant to N.J.S.A. 40:55D-36, for
issuance of a permit for a building or structure not related to a
street.
B. The Land Use Board shall have the power to grant site
plan, subdivision or conditional use approval whenever the proposed
development requires approval of a variance pursuant to N.J.S.A. 40:55D-70d.
C. Review. The Land Use Board shall have the power to
act upon subdivision, conditional use, site plan or variance applications
simultaneously without the applicant making further application for
hearings. The longest time period for action by the Board, whether
it is for subdivision, conditional use, site plan or variance approval,
shall apply. Whenever approval of a conditional use or variance is
requested by the applicant in conjunction with a site plan or subdivision
application, notice of the hearing on the plan shall include reference
to the request for such conditional use or variance.