[Amended 11-11-1998 by Ord. No. 98-13; 4-9-2003 by Ord. No.
2003-2; 5-24-2006 by Ord. No. 2006-04; 9-6-2006 by Ord. No.
2006-13; 4-11-2012 by Ord. No. 2012-02; 3-13-2019 by Ord. No. 2019-02; 8-12-2020 by Ord. No. 2020-15; 12-27-2023 by Ord. No. 2023-20]
A. Fee schedule.
(1) Every application for development shall be accompanied by a certified
check or checks payable to the Township of Blairstown in accordance
with the following schedule of administrative charges and escrow account
deposits.
(2) Where one application for development includes several approval requests,
the sum of the individually required administrative charges and escrow
account deposits shall be paid, with separate checks for the total
administrative charges and for the total escrow account deposits.
(3) It should be noted that the Land Use Board may decide in certain
instances, at the request of a prospective applicant and at a meeting
prior to the submission of the application for development, that the
required amount of the escrow account deposits for a particular application
may be more than anticipated to be needed for the review of the subject
application; in such an instance, the Board may authorize a lesser
escrow amount to be payable to the Township, provided that the applicant
nevertheless agrees to pay all reasonable costs for the review of
the application. Reduction of fees will only be considered for nonprofit
organizations.
(4) In addition to the fees and escrow deposits required for the review
of submitted applications for development, the fee schedule also includes
the fees for copies of requested items, special meetings, rezoning
requests and other items.
|
Application Charges
|
Escrow Account Deposits
|
---|
1.
|
Informal reviews.
|
|
|
|
(a)
|
One 15-minute appearance without professional review (See § 19-802D of this chapter.)
|
$100
|
None required
|
|
(b)
|
Any additional appearance and/or any appearance with professional review (See § 19-802D of this chapter.)
|
$150 (to be credited to any subsequent application fee)
|
Minor: $1,000
Major: $2,000
|
2.
|
Subdivisions
|
|
|
|
(a)
|
Minor subdivision plat
|
$150
|
$1,000 per lot
|
|
(b)
|
Preliminary major subdivision plat
|
$250
|
$750 per lot, provided that a maximum $20,000 initially shall
be deposited
|
|
(c)
|
Final major subdivision plat
|
$200
|
$250 per lot, provided that a maximum $10,000 initially shall
be deposited
|
|
(d)
|
Amended minor, preliminary major and/or final major subdivision
plat
|
$150
|
$300 per lot, provided that a maximum $10,000 initially shall
be deposited
|
|
(e)
|
Request for reapproval or extension of time
|
$150
|
$750
|
3.
|
Site plans
|
|
|
|
(a)
|
Minor site plan
|
$150
|
$1,000/acre or part thereof
|
|
(b)
|
Preliminary major site plan
|
$300
|
$2,000/acre or part thereof, provided that a maximum $20,000
initially shall be deposited
|
|
(c)
|
Final major site plan
|
$200
|
$1,000/acre or part thereof, provided that a maximum $10,000
initially shall be deposited
|
|
(d)
|
Amended minor, preliminary major and/or final major site plan
|
$150
|
1/2 of the amount otherwise calculated for a minor site plan,
preliminary and/or final major site plan, as the case may be, with
a $3,000 minimum deposit
|
|
(e)
|
Request for reapproval or extension of time
|
$150
|
$750
|
4.
|
Rezoning requests.
|
|
|
|
(a)
|
One 15-minute appearance without professional review
|
$100
|
None required
|
|
(b)
|
One 15-minute appearance with professional review
|
$300
|
$5,000
|
5.
|
Conditional uses (in addition to any fees required for site
plan or subdivision review)
|
$300
|
$500/acre or part thereof
|
6.
|
Variances
|
|
|
|
(a)
|
Appeals (N.J.S.A. 40:55D-70a)
|
$100
|
$1,000 each
|
|
(b)
|
Interpretation (N.J.S.A. 40:55D-70b)
|
$100
|
$1,000 each
|
|
(c)
|
Bulk (N.J.S.A. 40:55D-70c)
|
$100 per application
|
$1,500 each
|
|
(d)
|
Use and others (N.J.S.A. 40:55D-70d)
|
$250
|
$2,500
|
|
(e)
|
Permit (N.J.S.A. 40:55D-34 and 35)
|
$200
|
$1,000
|
|
(f)
|
Certification (N.J.S.A. 40:55D-68)
|
$100
|
$1,500
|
|
(g)
|
Request for extension of time
|
$150
|
$750
|
7.
|
Waivers (of site plan or subdivision)
|
$100
|
$125/first waiver plus $25/each additional waiver
|
8.
|
Special meeting of Land Use Board (as requested by applicant)
|
$500
|
$1,000
|
9.
|
Certified list of property owners or certified list of public
utilities [See § 19-706D(3) of this chapter.]
|
$0.25/name or $10, whichever is greater
|
None required
|
10.
|
Copy of minutes, resolutions or decisions (See §§ 19-706E
and 19-708C of this chapter.)
|
$0.75/page for first 1 to 10 pages; $0.50/page for pages 11
to 20 and $0.25/page for any additional pages
|
None required
|
11.
|
Transcription of meeting proceedings (See § 19-706E
of this chapter.)
|
At cost, in accordance with N.J.S.A. 2A:11-15
|
None required
|
12.
|
Audio copy of public hearing
|
$25
|
None required
|
13.
|
Subdivision approval certificate (See § 19-1003 of this chapter.)
|
$50/certificate
|
None required
|
14.
|
Certificate of nonconformity (within one year by Administrative
Officer) (N.J.S.A. 40:55D-68)
|
$50/certificate
|
None required
|
15.
|
Zoning permit. Each application for a zoning permit shall be
accompanied by a fee in accordance with the following schedule:
|
Application Type
|
Fee
|
---|
(a)
|
Residential renovations/additions and accessory buildings/structures
(less than $10,000)
|
$40
|
(b)
|
New single-family residential dwelling units
|
$125
|
(c)
|
Commercial new business or change of use
|
$75
|
(d)
|
Commercial renovations/additions and accessory structures/buildings
(less than $100,000)
|
$100
|
(e)
|
Commercial renovations/additions and accessory structures/buildings
(greater than $100,000)
|
$150
|
(f)
|
Residential resubmitted/amended zoning application
|
$25
|
(g)
|
Residential work commenced/completed without prior zoning approval
(additional)
|
$100
|
(h)
|
Commercial resubmitted/amended zoning application
|
$50
|
(i)
|
Commercial work commenced/completed without prior zoning approval
(additional)
|
$200
|
|
Application Charges
|
Escrow Account Deposits
|
---|
16.
|
Soil fill placement
|
|
|
|
(a)
|
Minor soil fill permit (50 cubic yards to 500 cubic yards)
|
$100
|
$500
|
|
(b)
|
Major soil fill permit (greater than 500 cubic yards)
|
$500
|
$2,000
|
B. The application charges are flat fees to cover administrative expenses
and are nonrefundable.
C. The escrow account deposits noted in this §
19-901 of the chapter are required to pay for the costs of professional services, including engineering, planning, legal and other expenses connected with the review of submitted materials, including any traffic engineering review or other special analysis related to the Township's review of the submitted materials, or any necessary studies regarding off-tract improvements.
(1) The review escrow shall be deposited by the Chief Financial Officer
of the Township, or their designee, in an account for such purposes
under the sole control of the Township.
(2) Said review escrows may be commingled with similar escrows from other
applicants, but accurate accounts and records shall be kept so as
to identify the particular escrows and charges made against the same.
D. An applicant is responsible to reimburse the Township of Blairstown
for all expenses of professional personnel incurred and paid by the
Township for the review process of an application for development
before a municipal agency, such as, but not limited to:
(1) Charges for reviews by professional personnel of applications, plans
and accompanying documents currently pending before the municipal
agency, or the review of an applicant's compliance with the conditions
of any approval to an application for development by a municipal agency,
or the review of any requests made by the applicant for modifications
or amendments to the submitted material, provided that the professional
shall not review items which are subject to approval by any state
governmental agency and not under municipal jurisdiction, except to
the extent consultation with the state agency is necessary due to
the effect of state approvals on the proposed subdivision or site
plan;
(2) Issuance of reports by professional personnel to the municipal agency
setting forth recommendations resulting from the review of any documents
submitted by the applicant;
(3) Charges for any telephone conference or meeting requested or initiated
by the applicant, his attorney or any of his experts or representatives;
(4) Review of additional documents submitted by the applicant and issuance
of reports relating thereto;
(5) Review or preparation of easements, developer's agreements, deeds,
approval resolutions, or the like;
(6) Preparation for and attendance at all meetings by professionals serving
the Board, such as the Attorney, Engineer and Planner, or other experts
as required;
(7) The cost of expert advice or testimony obtained by the municipal
agency for the purpose of corroborating testimony of applicant's experts;
and
(8) Actual out-of-pocket expenses incurred in the process of reviewing
the applications, plans and accompanying documents.
E. Each applicant shall agree to pay all reasonable costs for professional
review of the application. All such costs for review must be paid
before any approved plat, plan or deed is signed and before any zoning
permit, construction permit, certificate of occupancy, and/or other
permit is issued.
F. Payment by the Township of Blairstown of any bill rendered by a professional
to the municipality with respect to any service for which the municipality
is entitled to reimbursement under this chapter shall in no way be
contingent upon receipt by the municipality of reimbursement from
the applicant, nor shall any payment to a professional be delayed
pending the reimbursement from an applicant.
G. If an applicant desires a court reporter, the cost for taking testimony
and transcribing it and providing a copy of the transcript to the
Township shall be at the expense of the applicant who also shall arrange
for the reporter's attendance.
For purposes of this section, the term "public
improvements" shall include streets, grading, pavement, gutters, curbs,
sidewalks, streetlighting, street signs, shade trees, surveyor's monuments,
fire prevention features, water mains, culverts, storm sewers, sanitary
sewers or other means of sewage disposal (excluding individual subsurface
sewage disposal systems intended to serve individual lots), drainage
structures, soil erosion control features and sedimentation control
devices, landscaping, public improvements of open space, and, in the
case of site plans only, other on-site improvements.
A. Requirements specific to major subdivisions.
(1) No final major subdivision plat (whether for an entire
tract or a section thereof) shall be recorded unless:
(a)
The Township Engineer has certified to the Board
that all public improvements required by the preliminary subdivision
approval have been satisfactorily completed; or
(b)
The developer has entered into a developer's agreement with the Township of Blairstown, in a form satisfactory to the Township Attorney and authorized by the Township Committee, requiring the installation and maintenance by the developer and its successors in interest of the public improvements, imposing such limitations, and/or staging of, the development of the subdivision as are necessary to ensure orderly construction of the public improvements, and assuring the installation of the public improvements on or before an agreed date by the filing of a performance guarantee in accordance with Subsection
19-902D hereinbelow.
(2) No construction permit shall be issued for any building within the subdivision until the developer has completed the following public improvements in accordance with the approved subdivision plans and construction plans required by Subsection
19-902E(4) hereinbelow:
(a)
All required utility installations and their
appurtenances, including water mains, drainage and detention facilities,
culverts, storm sewers, sanitary sewers or dry sewers and public improvements
of open space;
(b)
All required grading and the macadam base course
surfacing of all streets;
(c)
Construction of all required curbs; and/or
(d)
Filed with the Township of Blairstown a performance guarantee in accordance with Subsection
19-902D of this section, sufficient in amount to cover the cost of all remaining required improvements, as estimated by the Township Engineer, and assuring the installation of said improvements on or before an agreed date and as hereinafter provided.
(3) No certificate of occupancy shall be issued for any dwelling within the subdivision except in compliance with the provisions for certificate of occupancy specified in §
19-1002E of this chapter.
(4) Unless provided otherwise elsewhere in this chapter,
the remaining required improvements shall be at least 50% completed
as to each category set forth in the performance guarantee within
one year from the date of final approval or by such time as 50% of
the lots in the section in question have been conveyed in any manner
by the developer, whichever shall first occur. At least 75% of the
improvements shall be completed as to each category as set forth in
the performance guarantee within 18 months from the date of final
approval, or at such time as 75% of the lots in the section in question
have been conveyed in any manner by the developer; whichever shall
first occur. Such improvements shall be 100% completed and accepted
by the Township within two years from the date of final approval or
at such time as all of the lots in the section in question shall first
occur.
(5) It is the intention of the Township Committee that
the foregoing requirements accomplish the following:
(a)
Provide to those living in each new section
of a subdivision a lot that is as complete as possible with respect
to tract and individual lot improvements; and
(b)
Protect the interests of the general public
and residents of the development in the total completion of the development.
(6) In the case of subdivision having final approval by
stages or sections, the requirements of this subsection shall be applied
by stage or section.
B. Requirements specific to major site plans. No final
major site plan application (whether for an entire tract or a section
thereof) shall be approved by the Board unless:
(1) The Township Engineer has certified to the Board that
all public improvements required by the preliminary site plan approval
have been satisfactorily completed; or
(2) The developer, with the approval of the Land Use Board,
has entered into a developer's agreement with the Township of Blairstown
in a form satisfactory to the Township Attorney and authorized by
the governing body:
[Amended 4-11-2012 by Ord. No. 2012-02]
(a)
Requiring the installation and maintenance by
the developer (and the developer's successors in interest) of the
public improvements; and
(b)
Imposing such limitations upon, and/or staging of, the development of the site as are necessary to ensure orderly construction of the public improvements on or before an agreed upon date by the filing of a performance guarantee in accordance with Subsection
19-902D of this chapter.
C. Requirements specific to minor subdivisions and minor site plans. In the case of a minor site plan and/or minor subdivision, in the event that the developer elects to complete all improvements without posting the performance guarantee specified in Subsection
19-902D hereinbelow, no construction shall be commenced until a finalized plan is submitted and signed, incorporating all conditions of approval.
(1) The developer shall still post the inspection escrow
and notify the Township Engineer prior to commencement of work.
(2) All site improvements under this subsection must be
completed prior to the issuance of a certificate of occupancy, or
within 120 days of a temporary certificate of occupancy in the instance
where a performance guarantee covering the balance of the uncompleted
improvements has been posted.
D. Performance guarantee.
(1) A performance guarantee estimate shall be prepared
by the Township Engineer for review and approval, setting forth all
required public improvements as determined by the Board and their
estimated cost, provided that no performance guarantee shall be required
for the installation of utilities, when said utility improvements
will be installed by the applicable utility company. Any adjustment
in the amount of the performance guarantee shall be approved by resolution
of the Township Committee.
(2) The cost of the installation of the required improvements
shall be estimated by the Township Engineer based on documented construction
costs for public improvements prevailing in the general area of the
Township. The developer may appeal the Township Engineer's estimate
to the Township Committee. The Township Committee shall decide the
appeal within 45 days of receipt of the appeal in writing by the Township
Clerk. After the developer posts a guarantee with the Township based
on the cost of the installation of improvements as determined by the
Township Committee, he/she may institute legal action within one year
of the posting in order to preserve the right to a judicial determination
as to the fairness and reasonableness of the amount of the guarantee.
(3) The developer shall present two copies of the performance
guarantee in an amount equal to 120% of the approved construction
cost performance guarantee estimate for approval as to form and execution
by the Township Attorney; additional copies of the performance guarantee
shall be forwarded by the owner to the Land Use Board Attorney. The
performance guarantee estimates, as prepared by the Township Engineer
and approved by the Township Committee, shall be appended to each
performance guarantee posted by the obligor.
[Amended 4-11-2012 by Ord. No. 2012-02]
(4) The performance guarantee shall be made payable and
deposited to the Township of Blairstown and shall be in the form of
cash, irrevocable letter of credit in accordance with N.J.S.A. 40:55D-53.5,
a certified check, a performance bond provided by an acceptable surety
company licensed to do business in the State of New Jersey and with
the developer as principal, or in another form of guarantee acceptable
the Township.
(a)
The Township shall issue its receipt for such
deposits and shall cause the same to be deposited in the name of the
Township to be retained as security for completion of all requirements
and to be returned to the owner on completion of all required work
or, in the event of default on part of the developer, to be used by
the Township to pay the cost and expense of obtaining completion of
all requirements.
(b)
The developer shall provide a written agreement from his/her lending institution stating that the lending institution agrees to the time period(s) required for the completion of the improvements and to the release of the guarantee by the Township Committee in accordance with Subsection
19-902G of this section.
(c)
In the case of an irrevocable letter of credit,
each such letter of credit shall comply with the "Uniform Customs
and Practices for Documentary Credits" (1984 Revision), International
Chamber of Commerce, Publication No. 400, and shall be issued or confirmed
by a New Jersey banking institution. Additionally, the form of any
irrevocable letter of credit shall be substantially similar to the
form letter of credit furnished the developer by the Township Clerk
and as approved by resolution of the Township Committee.
(d)
In the case of surety bonds, the developer shall
be the principal, and the bond shall be provided by a surety company
operating pursuant to N.J.S.A. 17:17-1 et seq. Moreover, proof of
such valid certificate shall be furnished to the Township of Blairstown
at the time the surety bond is submitted to the Township. Additionally,
the form of the surety bond shall be identical to the form letter
of bond furnished to the developer by the Township Clerk and as approved
by resolution of the Township Committee.
(5) Ten percent of the amount of the approved performance
guarantee shall be deposited by the developer in cash with the Township.
(a)
The remaining 90% may be in cash, an irrevocable
letter of credit in accordance with N.J.S.A. 40:55D-53.5, a surety
bond, or in another form of guarantee acceptable to the Township.
(b)
In the event of default, the 10% cash shall
be first applied to the completion of the requirements and any bidding
and legal costs associated therewith, and the remaining 90% cash,
letter of credit, surety bond, or other form of guarantee shall thereafter
be resorted to, if necessary, for the completion of the requirements
and any additional bidding and legal costs associated therewith.
E. Start of construction. Construction pursuant to a
site plan or subdivision approval shall not commence until:
(1) The developer has paid all fees required by this chapter;
(2) The developer has received all other governmental
approvals required by the Board's resolution of memorialization granting
subdivision and/or site plan approval;
(3) The developer has satisfied all conditions of approval
required by the Board's resolution of memorialization granting subdivision
and/or site plan approval and all revisions to the submitted plat
or plan required by the Board at the time of subdivision or site plan
approval have been filed with and approved by the Township Engineer
and any other individual or group as may have been specified by the
Board in the applicable resolution of memorialization granting subdivision
and/or site plan approval;
(4) The developer's construction plans have been filed
with and approved by the Township Engineer;
(5) The developer has had a preconstruction meeting with
the Township Engineer for the purpose of forecasting and resolving
problems that may arise during the time of construction;
(6) The developer has provided the Township of Blairstown the required performance guarantee in accordance with the provisions specified in §
19-902 of this chapter; and
(7) Regarding major subdivisions only, the developer has posted the sales map as required by §
19-805 of this chapter in a prominent location in all offices from which sales of property in the subdivision development will be conducted.
F. Inspection and tests.
(1) All public improvements and utility installations for site plans, subdivisions, plot plans and other realty improvements shall be inspected during the time of their installation under the supervision of the Township Engineer and/or other applicable officials or professionals serving the Township of Blairstown in order to insure satisfactory completion. The cost of said inspection shall be the responsibility of the developer who shall deposit with the Chief Financial Officer of the Township inspection fees in an amount not to exceed, except for extraordinary circumstances, the greater of $500 or 5% of the cost of the improvements as determined by the Township Engineer in accordance with Subsection
19-902D(2) of this section, provided that:
(a)
For those developments for which the reasonably
anticipated inspection fees are less than $10,000, the fees may, at
the option of the developer, be paid in two installments. The initial
amount deposited by the developer shall be 50% of the reasonably anticipated
fees. When the balance of deposit drops to 10% of the reasonably anticipated
fees because the amount deposited by the developer has been reduced
by the amount paid to the Township Engineer for the inspection(s),
the developer shall deposit the remaining 50% of the anticipated inspection
fees.
(b)
For those developments for which the reasonably
anticipated inspection fees are $10,000 or greater, the fees may,
at the option of the developer, be paid in four installments. The
initial amount deposited by the developer shall be 25% of the reasonably
anticipated fees. When the balance of deposit drops to 10% of the
reasonably anticipated fees because the amount deposited by the developer
has been reduced by the amount paid to the Township Engineer for the
inspection(s), the developer shall make additional deposits of 25%
of the anticipated inspection fees.
(2) The inspection escrow shall be deposited by the Chief
Financial Officer of the Township, or his/her designee, in an account
for such purposes under the sole control of the Township. Said inspection
escrows may be commingled with similar escrows from other developers,
but accurate accounts and records shall be kept so as to identify
the particular escrows and charges made against the same. The inspection
escrow funds shall be used solely for payment of inspection fees,
expenses and costs of the Township Engineer on behalf of the Township
during the course of construction.
(3) The Township Engineer shall not perform any inspection if sufficient funds to pay for those inspections are not on deposit. Failure of the developer to deposit the required inspection fees in accordance with Subsection
19-902F(1) of this section hereinabove will subject the developer to a stop-work order and/or suspension of construction permits.
(4) In no case shall any paving work be done without permission
from the Township Engineer. At least two working days notice shall
be given to the Township Engineer prior to any construction so that
he/she or a qualified representative may be present at the time the
work is to be done.
(5) Streets shall not be paved with a top course until
all heavy construction is completed and, if determined by the Township
Engineer to be necessary, the macadam base course has first been restored.
Shade trees shall not be planted until all grading and earth moving
is completed. The placing of surveyor's monuments shall be among the
last operations.
(6) The Township Engineer's office shall be notified at
least two working days prior to the commencement of the following
phases of work so that he/she or a qualified representative may inspect
the work; the Township Engineer shall, in turn, notify the landscape
architect designated by the Board, if applicable, regarding any seeding
and planting:
(d)
Road paving (after each coat, if applicable).
(g)
Drainage pipes and other drainage construction.
(j)
Sanitary sewers and pump stations.
(k)
Topsoil, seeding and planting.
(m)
Potable water facilities.
(n)
Detention and/or retention basins.
(7) When designated by the Board, the landscape architect
shall witness and approve landscaping in a designated area or on a
typical lot within a development as deemed appropriate and necessary
and/or as directed by the Township Engineer. A follow-up inspection
when the entire site or phase of development is completed shall be
conducted in order to confirm compliance for either a phase of development
or the entire project:
(a)
Plantings shall be checked for compliance with
approved plans; i.e., correct quantity, size, species and location.
Any change or modifications to the approved plans must be reviewed
and approved by the landscape architect designated by the Board.
(b)
Lawns shall be inspected for adequate coverage
of healthy, vigorously growing grass which is relatively free of weeds
and void of bare spots larger than one square foot in area. Bare spots
greater than one square foot in area shall be reseeded or resodded
and reinspected until acceptable coverage is achieved.
(c)
Upon completion of the landscaping, the landscape
architect shall check for compliance with the landscape plans approved
by the Board. A punch list of outstanding or unsatisfactory items
shall be compiled with copies given to the developer and the Township
Engineer, and a final sign-off shall be given after necessary remedial
work.
(d)
Upon successful completion of all landscape
work, a written recommendation shall be forwarded by the landscape
architect to the Township Engineer to be included in the inspection
report to the Township Committee before the release of performance
guarantees.
(8) Any improvement installed contrary to the plan or plat approval by the Township shall constitute just cause by the approving authority or designated official to void or deem voidable the municipal approval. Moreover, if a certificate of occupancy or construction permit is issued by a Township official pursuant to §
19-1002E of this chapter, such certificate or permit does not indicate acceptance by the Township of any deviation(s) from the plan or plat as approved by the Board.
(9) Any improvement installed without notice for inspection pursuant to Subsections
19-902E,
F(4) and
F(6) hereinabove shall constitute just cause for:
(a)
Removal of the uninspected improvement;
(b)
The payment by the developer of any costs for
material testing;
(c)
The restoration by the developer of any improvements
disturbed during any material testing; and/or
(d)
The issuance of a stop-work order by the Township
Engineer pending the resolution of any dispute.
(10)
Inspection by the Township of the installation
of improvements and utilities shall not operate to subject the Township
of Blairstown to liability for claims, suits or liability of any kind
that may at any time arise because of defects or negligence during
construction or at any time thereafter; it being recognized that the
responsibility to maintain safe conditions at all times during construction
and to provide proper utilities and improvements is upon the owner
and his contractor, if any.
(11)
Upon substantial completion of all required street improvements (except for the top course) and appurtenant utility improvements, and the connection of same to the public system, the obligor may request of the Township Committee in writing, by certified mail in care of the Township Clerk, that the Township Engineer prepare in accordance with the itemized cost estimate prepared by the Township Engineer and appended to the performance guarantee pursuant to Subsection
19-902D(3) of this chapter, a list of all uncompleted or unsatisfactory completed improvements.
(a)
If such a request is made, the obligor shall
send a copy of the request to the Township Engineer. The request shall
indicate which improvements have been completed and which improvements
remain uncompleted in the judgment of the obligor.
(b)
The Township Engineer shall inspect all the
improvements covered by the obligor's request and shall file a detailed
list and report, in writing, with the Township Committee, and shall
simultaneously send a copy thereof to the obligor not later than 45
days after receipt of the obligor's request.
(c)
If the Township Engineer fails to send or provide
the list and report, as requested by the obligor, within 45 days from
the receipt of the request, the obligor may apply to the Court in
a summary manner for an order compelling the Township Engineer to
provide the list and report within a stated time and the cost of applying
to the Court, including reasonable attorney's fees, may be awarded
to the prevailing party.
(12)
The list prepared by the Township Engineer pursuant to Subsection
19-902F(11) hereinabove, shall state, in detail, with respect to each improvement determined to be incomplete or unsatisfactory, the nature and extent of the incompleteness of each incomplete improvement or the nature and extent of, and remedy for, the unsatisfactory state of each completed improvement determined to be unsatisfactory. The report prepared by the Township Engineer shall identify each improvement determined to be complete and satisfactory together with a recommendation as to the amount of reduction to be made in the performance guarantee relating to the completed and satisfactory improvement, in accordance with the itemized cost estimate prepared by the Township Engineer and appended to the performance guarantee pursuant to Subsection
19-902D(3) of this section.
G. Release. The Township Committee, by resolution, shall either approve the improvements determined to be complete and satisfactory by the Township Engineer, or reject any or all of these improvements upon the establishment in the resolution of cause for rejection, and shall approve and authorize the amount of reduction to be made in the performance guarantee relating to the improvements accepted, in accordance with the itemized cost estimate prepared by the Township Engineer and appended to the performance guarantee pursuant to Subsection
19-902D(3) of this section. This resolution shall be adopted not later than 45 days after receipt of the list and report prepared by the Township Engineer.
(1) Upon adoption of the resolution by the Township Committee,
the obligor shall be released from all liability pursuant to its performance
guarantee, with respect to those approved improvements, except for
that portion adequately sufficient to secure completion or correction
of the improvements not yet approved, provided that 30% of the amount
of the performance guarantee posted may be retained to ensure completion
and acceptability of all improvements and, furthermore, that the 30%
retained may be applied against all improvements, regardless of when
completed.
(2) In the event that the obligor has made a cash deposit
with the Township or approving authority as part of the performance
guarantee, then any partial reduction granted in the performance guarantee
shall be applied to the cash deposit in the same proportion as the
original cash deposit bears to the full amount of the performance
guarantee.
(3) If any portion of the required improvements is rejected, the obligor shall complete or correct such improvements and, upon completion or correction, shall notify the Township Committee as specified in Subsection
19-902F(11) of this section and the same procedures shall be followed as in the first instance.
(4) Prior to the approval by the Township Committee of
the final reduction and release of the performance guarantee, all
easements and open space shall be conveyed to the Township or such
other guarantee as specified on the final plat by deed containing
a metes-and-bounds legal description.
(5) If the Township Committee fails to approve or reject the improvements determined by the Township Engineer to be complete and satisfactory or reduce the performance guarantee for the complete and satisfactory improvements within 45 days from the receipt of the Township Engineer's list and report, the obligor may apply to the Court in a summary manner for an order compelling, within a stated time, approval of the complete and satisfactory improvements and approval of a reduction in the performance guarantee for the approvable complete and satisfactory improvements in accordance with the itemized cost estimate prepared by the Township Engineer and appended to the performance guarantee pursuant to Subsection
19-902D(3) of this section, and the cost of applying to the Court, including reasonable attorney's fees, may be awarded to the prevailing party.
H. Conditions and acceptance of improvements. The approval
of any application for development by the Township of Blairstown shall
in no way be construed as acceptance of any street or drainage system
or other improvement, nor shall said approval obligate the Township
in any way to exercise jurisdiction over such street or drainage system
or other improvement. Moreover, no improvements shall be accepted
by the Township Committee unless and until all of the following conditions
have been met:
(1) The final application for development shall have been
approved by the Land Use Board and the developer shall have submitted
an affidavit, signed by a licensed New Jersey professional land surveyor,
certifying that all required monuments have been set in accordance
with the Map Filing Law and any approved subdivision plat;
[Amended 4-11-2012 by Ord. No. 2012-02]
(2) The Township Engineer shall have certified in writing
that the improvements are completed and that they comply with the
requirements of this chapter and the terms of the final application
for development approved by the Board;
(3) The owner shall have filed with the Township Committee a maintenance guarantee in an amount equal to and not more than 15% of the cost of installing the improvements, the cost to be determined by the Township Engineer in accordance with Subsection
19-902D(2) of this section hereinabove.
(a)
The maintenance guarantee shall run for a period
of two years, provided that the maintenance guarantee shall not terminate
until the Township Committee has authorized its release pursuant to
a recommendation by the Township Engineer.
(b)
The procedures and requirements governing such
maintenance guarantee shall be identical with the procedures and requirements
for a performance guarantee set forth in this chapter.
(c)
The requirements for a maintenance guarantee
may be waived by the Township Committee only if the Township Engineer
has certified that the improvements have been in continuous use for
not less than two years from the date the Township Engineer certified
completion of such improvements and that during this period the owner
has maintained the improvements in a satisfactory manner; and
(4) An as-built plan and profiles of all utilities and
roads [two black-and-white prints to be sent to the Township Engineer
plus a Mylar copy and two black-and-white prints to be sent to the
Administrative Officer], with certification signed and sealed by a
New Jersey licensed professional engineer as to the actual construction
as approved by the Township Engineer, shall be provided.
I. Extension of time. The time allowed for the installation
of the improvements for which the performance guarantee has been provided
may be extended by the Township Committee by resolution, provided
that the current municipal cost of installation of such improvements
shall first be redetermined by the Township Engineer, and if such
current municipal cost is found to be greater than the cost as originally
determined, the developer shall be required, as a condition of any
such extension, to increase the amount of the performance guarantee
to an amount equal to one hundred 120% of the installation cost as
redetermined. In the event that the redetermined cost shall be less
than the cost as originally determined, and in further event that
the developer's performance guarantee exceeds one hundred 120% of
such redetermined costs, the developer shall be entitled to a reduction
of the performance guarantee to an amount equal to one hundred 120%
of such redetermined costs.
J. Default by developer. If the required improvements
are not completed or corrected in accordance with the performance
guarantee, the obligor and surety, if any, under the performance guarantee
shall be liable thereon to the Township for the cost of the improvements
not completed or constructed, and the Township, either prior to or
after receipt of the proceeds thereof, may complete the improvements.
Such completion or correction of improvements shall be subject to
the public bidding requirements of the Local Public Contracts Law,
P.L. 1971, c. 198.
(1) For purposes of this subsection, "default" shall mean
failure to install the improvements in accordance with Township standards
of construction, including but not limited to failure to install the
improvements prior to the expiration of the performance guarantee.
(2) The Township Engineer's certification that the developer
has defaulted in compliance with the required standards of construction
and installation of improvements shall be the basis for Township Committee
action which rejects the improvements, withholds approval, withholds
construction permits or formally declares default and authorizes collection
on the performance guarantee.
K. Penalties. In addition to the penalties for violation
of this chapter in accordance with § 19-1006, the Township
Engineer, or another Township official designated by the Township
Committee, is specifically authorized to require the replacement or
restoration of any lands, buildings, structures and site improvements
(including clearing, whether on site or off site) or of any other
work commenced or continued on any site for which an approval is required
pursuant to this chapter in violation of any stop-construction order
or the standards for construction as established by the Township.