[Adopted 4-1-1969 by Ord. No. 72]
The plan of construction prepared by the consulting engineers with respect to the construction by the Authority of the portion of its sewer system in the Borough of East Petersburg is hereby approved.
The estimated cost ($2,238,877) of construction of said portion of the sewer system within the Borough and the proposal of the Authority to charge or assess a portion of the cost of construction of certain sewers constituting part of the sewer system against certain of the properties benefited, improved or accommodated thereby according to the front-foot rule as provided in Section 4B(s) of the Municipality Authorities Act of 1945[1], and to charge or assess a portion of the cost of construction of such sewers against other properties benefited, improved or accommodated thereby to the extent of such benefits as provided in Section 4B(r) or said Act[2] in cases where the front-foot method of assessment is deemed not to be legally applicable or would result in an inequitable assessment, are hereby approved.
[1]
Editor's Note: Said statute, 53 P.S. § 306B(s), was repealed 6-19-2001 by P.L. 287, No. 22, § 3. See now 53 Pa.C.S.A. § 5607(d)(22).
[2]
Editor's Note: Said statute, 53 P.S. § 306B(r), was repealed 6-19-2001 by P.L. 287, No. 22, § 3. See now 53 Pa.C.S.A. § 5607(d)(21).