[Adopted 4-9-2007 by Ord. No. 2007-11; amended in its entirety 12-20-2023 by Ord. No. 2023-23]
Description
Fee
Minimum fee
$70
New building, cubic feet
$35/1,000
New addition, cubic feet
$35/1,000
Rehabilitation
$50/1,000
Alteration
$50/1,000
Renovation
$50/1,000
Reconstruction
$50/1,000
Residential roof/siding
$125
Commercial roof/siding
$225
Deck
$50/1,000
Fence
$50/1,000
Sign and wall signs
100 sq. ft.
$1.25 per sq. ft.
101 to 400 sq. ft.
$0.75 per sq. ft.
Over 401 sq. ft.
$0.50 per sq. ft.
Pools
$50/1,000
Retaining wall
Under 550 sq. ft.
$125
Over 501 sq. ft.
$225
Asbestos abatement
$65
Lead abatement
$140
Radon
$50/1,000
Demolition
$65
Temporary structures
$125
Towers
$50/1,000
Underground tanks
550 gal
$65
1,000 gal
$95
2,000 gal
$125
Plan review
$20/hour
Sheds
$50/1,000
Solar
Residential
$145
Commercial
1 to 100
$150
101 to 250
$375
251 to 500
$700
Over 500
$700 plus $1 per panel
Other
$70
Adjustment
$1 to $50,000
$50/1,000
$50,001 to $100,00
$25/1,000
Over $100,000
$15/1,000
Description
Fee
Minimum fee
$70
Devices
1 to 50
$50
Each 25 over
$15
Lighting fixtures
Receptacles
Switches
Detectors
Light poles
Motors-fraction hp
Emergency exit lights
Communications pts
Alarm Devices
Pools
$70
Spa
$70
Hydromassage
$70
Appliances
1 to 10kw
$15
11 to 50kw
$60
51 to 100kw
$120
Over 100kw
$560
Electrical range
Oven
Water heater
Dryer
Garbage
Garbage disposal
Central A/C
Space heater/air handler
Baseboard heat
Motors HP
Transformers/Generators
1 to 10kw
$15
11 to 50kw
$60
51 to 100kw
$120
Over 100kw
$560
Service/subpanel/motor control
1 to 200 amps
$50
201 to 400 amps
$120
401 to 1,000 amps
$340
Over 1,000 amps
$560
Signs
1 to 10kw
$15
11 to 50kw
$60
51 to 100kw
$120
Over 100kw
$560
Electric vehicle charger
Residential
$95
Commercial
$145
Other
$70
Description
Fee
Minimum fee
$70
Devices
Water closet
$15
Urinal/bidet
$15
Bathtub
$15
Lavatory
$15
Shower
$15
Floor drain
$15
Dishwasher
$15
Drinking fountain
$15
Washing machine
$15
Hose bibb
$15
Water heater
$15
Fuel oil piping
$15
Gas piping
$15
LP gas tank
$65
Steam boiler
$65
Hot water boiler
$65
Sewer pump
$65
Interceptor/separator
$65
Backflow preventer
$65
Grease trap
$65
Sewer connection
$65
Water service connections
$65
Stacks
$65
Water-cooled Air Condition
$65
Refrigeration units
$65
Active solar system
$65
Replacement furnace/boiler
$145
Other
$70
Description
Fee
Minimum fee
$70
Alarm - Smoke
$50
Kitchen hood
$50
Gas-fired appliances
$50
Oil-fired appliances
$50
Chimney
$50
CO-2 suppression
$92
Foam suppression
$92
FM200 suppression
$92
Pre-engineered system
$92
Incinerator
$365
Crematorium
$365
Other
$50
Description
Fee
Minimum fee
$70
Water heater
$50
Fuel oil piping
$50
Gas piping
$50
Oil tank
$50
LPG tank
$50
Fireplace
$50
Generator
$50
Steam boiler
$145
Water boiler
$145
Hot air furnace
$145
Other
$50
Description
Fee
Certificate of occupancy
$50
Change of use certificate
$50
Certificate of continued occupancy
Residential
$75
Commercial
$125
Variation Class I
$550
Variation Class II and III
$120
Annual permit
$140
Appeal to Construction Board
$100
Annual pool
$70
Annual storable pool
$25
Temporary certificate of occupancy
Initial 6 months with new construction
$0
Per day, min. of 90 days
$1
Surcharge for email permits
$5