Description
|
Fee
|
---|---|
Minimum fee
|
$70
|
New building, cubic feet
|
$35/1,000
|
New addition, cubic feet
|
$35/1,000
|
Rehabilitation
|
$50/1,000
|
Alteration
|
$50/1,000
|
Renovation
|
$50/1,000
|
Reconstruction
|
$50/1,000
|
Residential roof/siding
|
$125
|
Commercial roof/siding
|
$225
|
Deck
|
$50/1,000
|
Fence
|
$50/1,000
|
Sign and wall signs
| |
100 sq. ft.
|
$1.25 per sq. ft.
|
101 to 400 sq. ft.
|
$0.75 per sq. ft.
|
Over 401 sq. ft.
|
$0.50 per sq. ft.
|
Pools
|
$50/1,000
|
Retaining wall
| |
Under 550 sq. ft.
|
$125
|
Over 501 sq. ft.
|
$225
|
Asbestos abatement
|
$65
|
Lead abatement
|
$140
|
Radon
|
$50/1,000
|
Demolition
|
$65
|
Temporary structures
|
$125
|
Towers
|
$50/1,000
|
Underground tanks
| |
550 gal
|
$65
|
1,000 gal
|
$95
|
2,000 gal
|
$125
|
Plan review
|
$20/hour
|
Sheds
|
$50/1,000
|
Solar
| |
Residential
|
$145
|
Commercial
| |
1 to 100
|
$150
|
101 to 250
|
$375
|
251 to 500
|
$700
|
Over 500
|
$700 plus $1 per panel
|
Other
|
$70
|
Adjustment
| |
$1 to $50,000
|
$50/1,000
|
$50,001 to $100,00
|
$25/1,000
|
Over $100,000
|
$15/1,000
|
Description
|
Fee
|
---|---|
Minimum fee
|
$70
|
Devices
| |
1 to 50
|
$50
|
Each 25 over
|
$15
|
Lighting fixtures
| |
Receptacles
| |
Switches
| |
Detectors
| |
Light poles
| |
Motors-fraction hp
| |
Emergency exit lights
| |
Communications pts
| |
Alarm Devices
| |
Pools
|
$70
|
Spa
|
$70
|
Hydromassage
|
$70
|
Appliances
| |
1 to 10kw
|
$15
|
11 to 50kw
|
$60
|
51 to 100kw
|
$120
|
Over 100kw
|
$560
|
Electrical range
| |
Oven
| |
Water heater
| |
Dryer
| |
Garbage
| |
Garbage disposal
| |
Central A/C
| |
Space heater/air handler
| |
Baseboard heat
| |
Motors HP
| |
Transformers/Generators
| |
1 to 10kw
|
$15
|
11 to 50kw
|
$60
|
51 to 100kw
|
$120
|
Over 100kw
|
$560
|
Service/subpanel/motor control
| |
1 to 200 amps
|
$50
|
201 to 400 amps
|
$120
|
401 to 1,000 amps
|
$340
|
Over 1,000 amps
|
$560
|
Signs
| |
1 to 10kw
|
$15
|
11 to 50kw
|
$60
|
51 to 100kw
|
$120
|
Over 100kw
|
$560
|
Electric vehicle charger
| |
Residential
|
$95
|
Commercial
|
$145
|
Other
|
$70
|
Description
|
Fee
|
---|---|
Minimum fee
|
$70
|
Devices
| |
Water closet
|
$15
|
Urinal/bidet
|
$15
|
Bathtub
|
$15
|
Lavatory
|
$15
|
Shower
|
$15
|
Floor drain
|
$15
|
Dishwasher
|
$15
|
Drinking fountain
|
$15
|
Washing machine
|
$15
|
Hose bibb
|
$15
|
Water heater
|
$15
|
Fuel oil piping
|
$15
|
Gas piping
|
$15
|
LP gas tank
|
$65
|
Steam boiler
|
$65
|
Hot water boiler
|
$65
|
Sewer pump
|
$65
|
Interceptor/separator
|
$65
|
Backflow preventer
|
$65
|
Grease trap
|
$65
|
Sewer connection
|
$65
|
Water service connections
|
$65
|
Stacks
|
$65
|
Water-cooled Air Condition
|
$65
|
Refrigeration units
|
$65
|
Active solar system
|
$65
|
Replacement furnace/boiler
|
$145
|
Other
|
$70
|
Description
|
Fee
|
---|---|
Minimum fee
|
$70
|
Alarm - Smoke
|
$50
|
Kitchen hood
|
$50
|
Gas-fired appliances
|
$50
|
Oil-fired appliances
|
$50
|
Chimney
|
$50
|
CO-2 suppression
|
$92
|
Foam suppression
|
$92
|
FM200 suppression
|
$92
|
Pre-engineered system
|
$92
|
Incinerator
|
$365
|
Crematorium
|
$365
|
Other
|
$50
|
Description
|
Fee
|
---|---|
Minimum fee
|
$70
|
Water heater
|
$50
|
Fuel oil piping
|
$50
|
Gas piping
|
$50
|
Oil tank
|
$50
|
LPG tank
|
$50
|
Fireplace
|
$50
|
Generator
|
$50
|
Steam boiler
|
$145
|
Water boiler
|
$145
|
Hot air furnace
|
$145
|
Other
|
$50
|
Description
|
Fee
|
---|---|
Certificate of occupancy
|
$50
|
Change of use certificate
|
$50
|
Certificate of continued occupancy
| |
Residential
|
$75
|
Commercial
|
$125
|
Variation Class I
|
$550
|
Variation Class II and III
|
$120
|
Annual permit
|
$140
|
Appeal to Construction Board
|
$100
|
Annual pool
|
$70
|
Annual storable pool
|
$25
|
Temporary certificate of occupancy
| |
Initial 6 months with new construction
|
$0
|
Per day, min. of 90 days
|
$1
|
Surcharge for email permits
|
$5
|