Chapter of Code/Type of Application, License,
Permit, Activity or Service
|
Fee
| ||||
---|---|---|---|---|---|
Chapter 3, Charges for Copies of Township Records
| |||||
1 to 10 pages
|
$0.75 per page
| ||||
11 to 20 pages
|
$0.50 per page
| ||||
Over 20 pages
|
$0.25 per page
| ||||
Chapter 5, Construction Permit Prior Approval Fee
| |||||
Prior approval certificate
|
$25
| ||||
Chapter 32, Police and Public Safety, Department of
| |||||
Police report fees
| |||||
Reports released at police headquarters:
| |||||
First 10 pages
|
$0.75 per page
| ||||
Next 10 pages
|
$0.50 per page
| ||||
Over 20 pages
|
$0.25 per page
| ||||
Reports mailed:
| |||||
Up to 5 pages
|
$10
| ||||
Each additional page
|
$0.50 per page
| ||||
Legal discoveries of case records, regardless of the number
of copies
|
Minimum prepayment of $15, which will be applied to the total
cost
| ||||
Photographs
| |||||
Reprints from negatives
|
$1 per print
| ||||
Copy of a print with no negative
|
$2.50 per print
| ||||
Copy of a print with negative
|
$5 per negative, plus $1 per print
| ||||
Videos and audio tapes
| |||||
Video copy
|
$50 each
| ||||
Audio tape copy
|
$20 each
| ||||
Typed statements
| |||||
Up to 5 pages
|
$10
| ||||
Each additional page
|
$0.50
| ||||
Storage of vehicles and large equipment
| |||||
Storage charge
|
$25 every 24 hours
| ||||
Outside jobs and/or road jobs
[Added 6-15-2021 by Ord. No. 2021-10] |
See § 32-13F
| ||||
Outside jobs for volunteer and nonprofit organizations, when
the activity is designed to benefit the Holland Township community
[Added 6-15-2021 by Ord. No. 2021-10] |
See § 32-13G
| ||||
Outside jobs or road jobs that entail the use of a police vehicle
[Added 6-15-2021 by Ord. No. 2021-10] |
See § 32-13H
| ||||
Chapter 43, Alcoholic Beverages
| |||||
Annual club license
|
$188
| ||||
Annual plenary retail distribution license
|
$2,500
| ||||
Aqnnual plenary retail consumption license
|
$2,500
| ||||
Chapter 68, Dogs and Other Animals
[Amended 11-7-2019 by Ord. No. 2019-20] | |||||
Article II, Dogs
| |||||
Annual license and registration
|
Sum of $12, including the following:
| ||||
License fee
|
$12
| ||||
Additional annual license and registration fee for any dog of
reproductive age which has not had its reproductive capacity permanently
altered through sterilization
|
$3
| ||||
Annual license fee for kennel
| |||||
10 or fewer dogs
|
$10
| ||||
More than 10 dogs
|
$25
| ||||
Annual license fee for pet shop
|
$0
| ||||
Annual license fee for shelter or pound
|
$0
| ||||
Additional fee for delinquent licenses
|
$10
| ||||
Maintenance fee for seized dog
|
$10
| ||||
Chapter 72, Driveways
[Amended 10-19-2010 by Ord. No. 2010-20] | |||||
Driveway permit
| |||||
Existing driveway modified solely by repaving an already paved
driveway with no change in driveway location or elevation
|
$25
| ||||
Existing driveway modified solely by paving the existing stone
or other surface of an existing driveway with no change in the driveway
location or elevation
|
$100
| ||||
New driveway construction or horizontal or vertical relocation
of an existing driveway
|
$300
| ||||
Reissuance fee: Where a previously issued driveway permit is
requested to be amended, changed, or modified at the owner's request,
a permit reissuance fee shall be paid
|
$100
| ||||
Deposit, also to be paid as required by § 72-3E
|
$500
| ||||
Chapter 76, Street Opening Permits
[Amended 12-6-2022 by Ord. No. 2022-21] | |||||
Application fees
| |||||
0 to 50 square feet of disturbance
|
$50
| ||||
51 to 300 square feet
|
$300
| ||||
Over 300 square feet
|
$500
| ||||
Inspection escrows
| |||||
0 to 50 square feet
|
$750 per day ($375 per half day)
| ||||
51 to 300 square feet
|
$750 per day ($375 per half day)
| ||||
Over 300 square feet
|
$750 per day ($375 per half day)
| ||||
Chapter 85, Fireworks
| |||||
Application fee
|
$50
| ||||
Chapter 100, Land Use
| |||||
Part 1, Zoning
| |||||
Industrial use permit special report fee
|
$250
| ||||
Wireless telecommunications towers and antennas variance or
conditional use permit fees
| |||||
If no new tower is proposed
|
$1,000 application charge, plus $2,000 escrow deposit
| ||||
If new tower is proposed
|
$5,000 application charge, plus $5,000 escrow deposit
| ||||
Flood Hazard District development permit
[Amended 12-19-2023 by Ord. No. 2023-19] |
$300 filing fee, plus $1,500 escrow deposit
| ||||
Zoning permit
|
$75
| ||||
Zoning permit solely for freestanding shed with floor area not
exceeding 150 square feet or aboveground swimming pool
|
$25
| ||||
Part 2, Development Regulations
[Amended 3-4-2014 by Ord. No. 2014-3; 5-2-2023 by Ord. No. 2023-07] | |||||
Land Use application fees
| |||||
Application
|
Application fee
|
Escrow deposit
| |||
Appeal of denial of zoning permit
|
$300
|
$1,000
| |||
Request for zoning interpretation
|
$300
|
$3,000
| |||
Bulk "C" Variance
|
$300
|
$3,000
| |||
Bulk "C" Variance —accessory building only
|
$100
|
$1,000
| |||
Use "D" Variance
|
$750
|
$5,000
| |||
Conditional use
|
$750
|
$5,000
| |||
Informal conceptual review/discussion
|
$300
|
N/A
| |||
Minor subdivision
|
$750
|
$5,000
| |||
Major subdivision
|
$1,000
|
$5,000
| |||
Minor site plan
|
$500
|
$5,000
| |||
Major site plan
|
$500
|
$5,000
| |||
Stormwater plan reviews
|
$300
|
$1,500
| |||
Initial inspection deposit (based on total cost of improvements)
| |||||
Less than $10,000
|
7%
| ||||
$10,000 to $50,000
|
$700, plus 6% of the excess over $10,000
| ||||
$50,000 to $100,000
|
$3,100, plus 5% of the excess over $50,000
| ||||
$100,000 to $200,000
|
$5,600, plus 4.5% of the excess over $100,000
| ||||
More than $200,000
|
$10,000, plus 4% of the excess over $200,000
| ||||
Witnessing fee for percolation tests
|
$250 per lot, plus an additional fee of $250 per day where observation
of percolation tests on any lot exceeds one day's time
| ||||
Special meeting fee
|
$100, in addition the administrative officer may require an
additional escrow deposit of up to $1,000 for each special meeting
| ||||
Construction inspection fee deposit (based on estimated cost
of improvements)
| |||||
Less than $5,000
|
$350
| ||||
$5,000 but less than $10,000
|
$350, plus 5% of excess over $5,000
| ||||
$10,000 but less than $50,000
|
$600, plus 4% of excess over $10,000
| ||||
$50,000 and over
|
$2,200, plus 3% of excess over $50,000
| ||||
Part 3, Stormwater Management
[Amended 8-21-2018 by Ord. No. 2018-09; 12-19-2023 by Ord. No. 2023-19] | |||||
Stormwater plan review
|
$300
| ||||
Development inspection escrow
|
$1,500
| ||||
Chapter 115, Occupancy, Certificates of
| |||||
First inspection fee
|
$75
| ||||
Reinspection fee
|
$75
| ||||
Chapter 120, Peddling and Soliciting
[Amended 12-6-2016 by Ord. No. 2016-6] | |||||
License fee
| |||||
Bond
|
$1,000
| ||||
Chapter 135, Sewers
| |||||
Observation of sewer tests subsequent to initial test
|
$5
| ||||
Surcharges for excess constituents
| |||||
Biochemical oxygen demand (BOD)
|
$0.25 per pound
| ||||
Suspended solids
|
$0.20 per pound
| ||||
Chlorine demand
|
$0.20 per pound
| ||||
Connection or hookup fee
|
$4,000 times the number of flat rate sewer rental units chargeable
to all components of the connection unit to be served
| ||||
Sanitary sewer rental
[Amended 2-15-2011 by Ord. No. 2011-2[1]] |
$530 per year
| ||||
Garbage grinder flat-rate sewer rental charge
|
$3 per quarter per garbage grinder
| ||||
Fee to restore service
|
$50
| ||||
Chapter 140, Soil Removal
| |||||
Review fees
| |||||
Applications for less than 500 cubic yards not involving any
site work other than the excavation and removal of the material
|
$100
| ||||
Applications for less than 500 cubic yards which will involve
site work other than the excavation and removal of the material
|
$100, plus 1% of the cost of additional site work
| ||||
Applications for 500 cubic yards or more not involving any site
work other than the excavation and removal of the material
|
$300, plus $10 for every additional 500 cubic yards, or portion
thereof, of material to be excavated or removed over the first $500
| ||||
Applications for 500 cubic yards or more involving site work
other than the excavation and removal of the material
|
$300, plus $10 for every additional 500 cubic yards, or portion
thereof, of material to be excavated or removed, over the first 500,
plus 1% of the cost of the additional site work
| ||||
Inspection fees
| |||||
Applications for less than 500 cubic yards not involving any
site work other than the excavation and removal of the material
|
$100
| ||||
Applications for less than 500 cubic yards which will involve
site work other than the excavation and removal of the material
|
$100, plus 2% of the cost of the additional site work
| ||||
Applications for 500 cubic yards or more not involving any site
work other than the excavation and removal of the material
|
$100, plus $10 for every additional 500 cubic yards, or portion
thereof, of material to be excavated or removed, over the first 500
| ||||
Applications for 500 cubic yards or more involving site work
other than the excavation and removal of the material
|
$100, plus $10 for every additional 500 cubic yards, or portion
thereof, of material to be excavated or removed over the first 500,
plus 2% of the cost of the additional site work
| ||||
Chapter 145, Stormwater Quality
[Added 6-5-2024 by Ord. No. 2024-09] | |||||
Article X, Tree Removal and Replacement
| |||||
Application Fees
| |||||
Category
|
Tree Removed
(DBH in inches)
|
Application Fee
| |||
1
|
2.5 (for street trees) or 6 (for non-street trees) to 12.99
|
$10 per tree
| |||
2
|
13 to 22.99
|
$20 per tree
| |||
3
|
23 to 32.99
|
$40 per tree
| |||
4
|
33 or greater
|
$50 per tree
| |||
Non-Replacement Fees
| |||||
Chapter 161, Trailers and Trailer Parks
| |||||
License fees
|
$200 yearly, plus the sum of $2 per calendar week or fraction
thereof per trailer
|