Progress inspections will be performed by the Borough at predetermined
intervals or rates and specific to the type of work being performed.
Generally, inspections will be full-time inspections for the construction
of any roadways, sanitary sewers, storm sewers, or any other public
improvements.
Upon completion of the public and private improvements in a
plan, as-built plans of the improvements shall be filed with the Borough
by the developer within 10 days of the mailing of the notice of completion.
The as-built plans shall be delivered to the Borough prior to their
accepting any of the public improvements in both hard copy and a digital
format conforming to acceptable industry standards.
As a prerequisite to release of the performance security for
completion of public and private improvements pursuant to this chapter,
or as a condition to final plat approval, the developer shall provide
maintenance security guaranteeing the maintenance of the improvements
in the amount of 15% of the actual cost of installation of said improvements
for a term of 18 months from the date of acceptance of the improvements
by the Borough's Engineer, to secure both the structural integrity
and functioning of said improvements in accordance with the design
and specifications as depicted on the approval final plat. The security
must be in place prior to the final acceptance of any public improvements.
In the event that the public and private improvements required
to be installed by the provisions of this chapter are not installed
in accordance with the requirements of this chapter or the approval
final plat, Borough Council shall have the power to enforce the performance
security by appropriate legal and equitable remedies provided by the
laws of the Commonwealth of Pennsylvania. If proceeds from the performance
security are insufficient to pay the cost of installing or making
repairs or corrections to all the improvements guaranteed by such
performance security, Borough Council may, at its option, install
part of such improvements in all or part of the subdivision, consolidation
or land development and may institute appropriate legal or equitable
action to recover the moneys necessary to complete the remainder of
the improvements. All of the proceeds, whether resulting from the
performance security or from any legal or equitable action brought
against the developer, or both, shall be used solely for the installation
of the improvements guaranteed by such performance security and not
for any other municipal purpose.