The Engineer's Report shall contain the following minimum data
and shall conform to NJDEP regulations and format as listed below:
A detailed estimate of the total construction cost shall include
materials, installation and any other costs associated with the construction,
both the complete potable waters and sanitary sewer systems for the
project.