[R.O. 2004 §500.040; Ord. No. 826 §1, 11-7-1995; Ord. No. 1156 §1, 11-19-2007; Ord. No. 1173 §§1 — 2, 8-4-2008; Ord. No. 1274 §1, 12-5-2011; Ord. No. 1495, 9-23-2019]
A. Building Permit Fees. The fee for issuance of a building permit for
all new buildings and additions shall be set by the following formula:
(type of construction) times (square footage) times (fee multiplier
of three thousandths (0.003)). When two hundred fifty thousand dollars
($250,000.00) in construction costs is reached, the fee multiplier
for all additional costs will drop to fifteen tenth hundredths (0.0015).
The fee for issuance of a remodeling permit shall be set by the following
formulas. For residential: (type of construction) times (square footage)
times fifteen tenths hundredths (0.0015). For commercial: (type of
construction) times (square footage) times seventy-five hundred thousandths
(0.00075). Cost per square foot will be taken from the current International
Code Council Building Valuation Data Report.
B. Fee For Moving Home. The permit fee for moving a home from one (1)
lot to another or to a new location on the same lot shall be one hundred
dollars ($100.00).
[Ord. No. 1531, 12-21-2020]
C. Fee For Demolition Of Structures. The permit fee for the demolition
of a building or structure shall be the rate of fifty dollars ($50.00)
for each five-hundred-square-foot section of area of the building
or structure. For example, if the structure is two thousand (2,000)
square feet, the demolition permit fee shall be two hundred dollars
($200.00).
D. Permit Fees. The fee for issuance of the permits listed below are
as follows:
[Ord. No. 1522, 8-17-2020]
Type of Permit
|
Fee
|
---|
Deck
|
$50.00
|
Swimming pool (aboveground)
|
$50.00
|
Swimming pool (in-ground)
|
$100.00
|
Shed
|
$40.00
|
Billboard
|
$150.00
|
Blasting
|
$75.00
|
Occupancy
|
$35.00
|
Driveway
|
$50.00
|
Sewer repair (residential)
|
$75.00
|
Sewer repair (commercial)
|
$100.00
|
Accessory building relocate
|
$50.00
|
Electric service
|
$40.00
|
Land disturbance
|
$75.00
|
Retaining wall
|
$40.00
|
Carport
|
$40.00
|
Sign (price per sign)
|
$45.00
|
Solar panels
|
$50.00
|
Fence
|
$40.00
|
E. Additional Fees. The following tasks will require the listed fee:
Task
|
Fee
|
---|
Reinspection
|
$20.00
|
Plan review ($30,000.00 or less)
|
$10.00
|
Plan review (over $30,000.00)
|
$60.00
|
Permit renewal or extension 1
|
$25.00
|
Permit renewal or extension 2
|
$100.00
|
Street cut (half width of street)
|
$250.00
|
Street cut (full width of street)
|
$500.00
|
NOTE: Permit renewal or extension 1 will apply to all permits,
excluding new homes and remodels. Permit renewal or extension 2 will
apply to all new homes and remodels unless the permit fee is less
than one hundred dollars ($100.00) in which case permit renewal or
extension 1 will apply.
|
F. Permit Deposits.
[Ord. No. 1522, 8-17-2020]
1.
All permits within the City of Pevely shall be accompanied by
a permit deposit. The deposit will be refunded in full after all inspections
have been completed to the satisfaction of the Building Official or
his or her designee. The deposit expires at the same time the permit
expires. If the permit is renewed within ten (10) days of expiration,
the deposit will carry over to the renewal. Failure to renew the permit
within ten (10) days of expiration will result in the deposit expiring
and a new deposit will be required.
2.
The permit deposit amounts are as follows:
Type of Permit
|
Deposit
|
---|
Deck
|
$50.00
|
Swimming pool
|
$50.00
|
Shed
|
$50.00
|
Billboard
|
$100.00
|
Blasting
|
$100.00
|
Demolition
|
$100.00
|
Driveway
|
$70.00
|
Sewer repair (residential)
|
$60.00
|
Sewer repair (commercial)
|
$100.00
|
Accessory building relocate
|
$60.00
|
Remodel
|
$150.00
|
New home
|
$500.00
|
Electric service
|
$40.00
|
Land disturbance
|
$50.00
|
Retaining wall
|
$40.00
|
Carport
|
$40.00
|
Sign
|
$45.00
|
Home relocate
|
$75.00
|
Solar panels
|
$500.00
|
Fence
|
$50.00
|
G. Building Permit Fees Based On Cost Of Construction. The cost for
a building permit is based on the total cost of material and labor
and shall be at the following rate: eleven dollars ($11.00) for the
first five hundred dollars ($500.00) of cost or any part thereof,
plus two dollars and fifty cents ($2.50) for each additional five
hundred dollars ($500.00) of cost or any part thereof up to two hundred
thousand dollars ($200,000.00), then one dollar and fifty cents ($1.50)
per one thousand dollars ($1,000.00) or part thereof up to eight hundred
thousand dollars ($800,000.00), then one dollar and eighty cents ($1.80)
per one thousand dollars ($1,000.00) of cost or any part thereof with
a minimum fee of fifty dollars ($50.00).
H. Penalty For Failure To Acquire Permit. Any party who fails to acquire
a permit to perform work within the City as described herein may be
issued a stop-work order without notice and may be required to pay
a permit fee equal to two hundred percent (200%) of the original permit
fee amount.