[CC 1986 § 111.010; Ord. No. 424, 3-6-1996; Ord. No.
18-001, 5-8-2018; Ord. No. 18-010, 9-4-2019; Ord. No. 18-033, 6-1-2022; Ord. No. 18-038, 1-4-2023; Ord. No. 18-041, 6-7-2023]
A. The rate for water service to customers of the water works for the
City of Edgerton, Missouri, who reside within the City limits of that
City of Edgerton, Missouri, shall be as follows: a minimum monthly
charge of sixty-one dollars fifty cents ($61.50), which includes the
first one thousand (1,000) gallons of water, plus fifteen dollars
fifty cents ($15.50) for each one thousand (1,000) gallons of water
or each fraction thereafter.
1.
Solid waste collection and disposal: seventeen dollars ninety-six
cents ($17.96) for each residential customer.
B. The rate for water service to customers of the water works for the
City of Edgerton, Missouri, who reside outside the City limits of
that City of Edgerton, Missouri, shall be as follows: a minimum monthly
charge of forty-five dollars fifty cents ($45.50), which includes
the first one thousand (1,000) gallons of water, plus fifteen dollars
fifty cents ($15.50) for each one thousand (1,000) gallons of water
or each fraction thereafter.
1.
Solid waste collection and disposal: seventeen dollars ninety-six
cents ($17.96) for each residential customer.
C. The rates established herein shall be effective commencing with the
next full billing period to water customers following the adoption
and passage of this Section.
D. The Board of Aldermen shall review the rates set forth herein at
the regular Board of Aldermen meeting in November 2023, and thereafter
every six (6) months at the regular meeting of the Board of Aldermen.
[CC 1986 § 111.020; Ord. No. 18-030, 3-2-2022]
Water users signing water user agreements on or prior to December
31, 1979, shall not be required to pay a pre-installation connection
fee. Water users signing water user agreements on or after the effective
date of this ordinance, shall be required to pay a preinstallation
connection fee of one thousand dollars ($1,000.00). Water users shall
be required to pay the cost of making the connection from the meter
to the user's building. Failure of the user to make such connection
within forty-five (45) days of the installation of the meter connection
shall result in removal of the meter. In addition to the charges for
reconnection computed in accordance with the water regulations, there
shall be a reconnection fee of one thousand dollars ($1,000.00) paid
for such reconnection.