[CC 1986 § 111.010; Ord. No. 424, 3-6-1996; Ord. No.
18-001, 5-8-2018; Ord. No. 18-010, 9-4-2019]
A.
The rate for water service to customers of the water works for the
City of Edgerton, Missouri, who reside within the City limits of that
City of Edgerton, Missouri, shall be as follows: a minimum monthly
charge of sixty-one dollars ($61.00), which includes the first one
thousand (1,000) gallons of water, plus fifteen dollars ($15.00) for
each one thousand (1,000) gallons of water or each fraction thereof.
1.
Solid Waste Collection And Disposal: thirteen dollars ($13.00)
for each residential customer.
B.
The rate for water service to customers of the water works for the
City of Edgerton, Missouri, who reside outside the City limits of
that City of Edgerton, Missouri, shall be as follows: a minimum monthly
charge of forty-five dollars ($45.00), which includes the first one
thousand (1,000) gallons of water, plus fifteen dollars ($15.00) for
each one thousand (1,000) gallons of water or each fraction thereof.
1.
Solid Waste Collection and Disposal: thirteen dollars ($13.00)
for each residential customer.
C.
The rates established herein shall be effective commencing with the
next full billing period to water customers next following the adoption
and passage of this Section.
D.
The Board of Aldermen shall review the rates set forth herein at
the regular Board of Aldermen meetings in October 2019, January 2020,
April 2020, and thereafter at the regular meeting of the Board of
Aldermen in January of each year.
[CC 1986 § 111.020]
Water users signing water user agreements on or prior to December
31, 1979, shall not be required to pay a pre-installation connection
fee. Water users signing water user agreements on or after January
1, 1980, shall be required to pay a pre-installation connection fee
of the estimated cost of setting the water meter well, making the
tap and all necessary connections. Water users shall be required to
pay the cost of making the connection from the meter to the user's
building. Failure of the user to make such connection within forty-five
(45) days of the installation of the meter connection shall result
in removal of the meter. In addition to the charges for reconnection
computed in accordance with the water regulations, there shall be
a reconnection fee of one hundred dollars ($100.00) paid for such
reconnection.