All applications for proposed temporary uses shall be comprised
of all of the following:
A. A written description of the proposed temporary use describing the
type and duration of proposed activities and any structures, materials
or equipment that will be associated with the temporary use.
B. A site plan of the subject property indicating existing structures,
parking and drive areas, and the location(s) of the proposed use and
any structures, materials or equipment associated with the proposed
use. Said site plan shall by drawn to a consistent scale and include
sufficient detail to enable appropriate review by the Zoning Administrator.
C. Additional information as may be required by the Plan Commission,
Village Engineer, Zoning Administrator and Building Inspector.
D. Any required fee as set by Village Board.
Action on a temporary use permit application shall be taken
by the Zoning Administrator within five days of a complete application,
as verified by the Zoning Administrator. Such action may include approval,
conditional approval to meet the requirements of this chapter, denial
if compliance with this chapter cannot be achieved, or referral to
the next Plan Commission meeting if the Zoning Administrator elects
to request a recommendation from Plan Commission before approving
or denying the permit.