A. 
The applicant shall provide a financial guarantee to the Township for the timely installation and proper construction of all stormwater management controls as required by the approved SWM site plan and this chapter, equal to 110% of the full construction cost of the required controls in accordance with the Municipalities Planning Code.
B. 
At the completion of the project and as a prerequisite for the release of the financial guarantee, the applicant shall:
(1) 
Provide a certification of completion from an engineer, architect, surveyor or other qualified person, verifying that all permanent facilities have been constructed according to the SWM site plan and report and approved revisions thereto.
(2) 
Provide a set of record drawings.
(3) 
Request a final inspection from the Township to certify compliance with this chapter, after receipt of the certification of completion and record drawings by the Township.
A. 
When stormwater management facilities or other required improvements in the development have been completed in accordance with the final approved plan, such improvements shall be deemed private until such time as they have been offered for dedication to Fairview Township and accepted by separate ordinance or resolution or until they have been condemned for use as a public facility.
B. 
Prior to acceptance of any improvements or facilities, the Municipal Engineer shall inspect them to ensure that they are constructed in accordance with the approved plan and are functioning properly. In the case of any stormwater control facility, it must be free of sediment and debris.
C. 
The owner and/or developer shall submit as-built plans for all facilities proposed for dedication.
D. 
Prior to acceptance of any improvements or facilities, the applicant shall provide financial security to secure the structural integrity and functioning of the improvements. The security shall:
(1) 
Be in the form of a bond, cash, certified check or other negotiable securities acceptable to Fairview Township;
(2) 
Be for a term of 36 months; and
(3) 
Be in an amount equal to 10% of the actual cost of the improvements and actual cost of installation and facilities so dedicated.