City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
|
---|---|---|---|---|
General Fees, Fines
| ||||
Administrative fee, per certified mail letter/notice
|
$25
|
$0
|
$25
|
No
|
Animals Chapter violations
|
$100
|
$0
|
$100
|
No
|
Commercial property tax rate
|
$1.26/100 on 100%
|
$0
|
$1.26/100 on 100%
|
No
|
Copies, per page
|
$0.30
|
$0
|
$0.30
|
No
|
FOIA request
| ||||
Standard size copies/printout, black and white,
per page
|
$0.30
|
$0
|
$0.30
|
No
|
Standard size copies/printout, color, per page
|
$1
|
$0
|
$1
|
No
|
Labor, materials, and other costs charged at cost
|
At cost
|
$0
|
At cost
|
No
|
Notary services, per stamp, out of town
|
$5
|
$0
|
$5
|
No
|
Open burning violations
|
$50
|
$0
|
$50
|
No
|
Residential property tax rate
|
$1.06/$100 on 100%
|
$0
|
$1.06/$100 on 100%
|
No
|
Returned checks
|
$30
|
$0
|
$30
|
No
|
Tax relief for senior citizens
|
5%
|
$0
|
5%
|
No
|
Transfer tax
|
1.5%
|
$0
|
1.5%
|
No
|
Vacant buildings
| ||||
Vacant building inspection (yearly after first year)
|
$75
|
$0
|
$75
|
No
|
Vacant building registration
|
$75
|
$0
|
$75
|
No
|
Failure-to-register fine (monthly)
|
$50
|
$0
|
$50
|
No
|
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
| |
---|---|---|---|---|---|
Zoning & Building Fees**, Fines
| |||||
Annexation application plus professional fees
|
$500 + $50/acre
|
$0
|
$500 + $50/acre
|
Yes
| |
Board of Adjustment variances - commercial
|
$500 + $50 per variance
|
$0
|
$500+ $50 per variance
|
No
| |
Board of Adjustment variances - residential
|
$400
|
$0
|
$400
|
Yes
| |
Board of Adjustment appeals
|
$500
|
$0
|
$500
|
Yes
| |
Category A, Conceptual site plan review
|
$400
|
$0
|
$400
|
Yes
| |
Category A, Preliminary site plan review
|
$500 + $50/1,000 sq. ft. new gross floor area
|
$0
|
$500 + $50/1,000 sq. ft. new gross floor area
|
Yes
| |
Category A, Final site plan review
|
$750 + $50/1,000 sq. ft. new gross floor area
|
$0
|
$750 + $50/1,000 sq. ft. new gross floor area
|
Yes
| |
Category B, Administrative plan review, R-1 and R-2 residential
properties except in approved residential subdivisions
|
$350
|
$0
|
$350
|
Yes
| |
Category B, Administrative plan review, all others
|
$500
|
$0
|
$500
|
Yes
| |
Category B, Administrative plan review in approved subdivisions
|
$200
|
$0
|
$200
|
Yes
| |
Certificate of occupancy
|
$25
|
$0
|
$25
|
No
| |
Conditional use plus professional fees
|
$500
|
$0
|
$500
|
Yes
| |
Demolition permit
| |||||
Accessory structure
|
$40
|
$0
|
$40
|
No
| |
Residential
|
$85
|
$0
|
$85
|
No
| |
Commercial/institutional
|
$150
|
$0
|
$150
|
No
| |
Impact fees*
| |||||
Community impact fee - library
|
$200
|
$0
|
$200
|
No
| |
Community impact fee - parks and recreation
|
$200
|
$0
|
$200
|
No
| |
Community impact fee - fire
|
$300
|
$0
|
$300
|
No
| |
Community impact fee - police
|
$300
|
$0
|
$300
|
No
| |
Water impact fee, per EDU
|
$1,170* per chart
|
$0
|
$1,170* per chart
|
No
| |
Major subdivision, conceptual and lot line adjustment - commercial
|
$400
|
$0
|
$400
|
Yes
| |
Major subdivision, conceptual and lot line adjustment - residential
|
$200
|
$0
|
$200
|
Yes
| |
Major subdivision, preliminary
|
$600 + $10/lot or dwelling unit + professional fees
|
$0
|
$500 + $10/lot or dwelling unit + professional fees
|
Yes
| |
Major subdivision, final plat approval
|
$500 + $10/lot or dwelling unit + professional fees
|
$0
|
$500 + $10/lot or dwelling unit + professional fees
|
Yes
| |
Minor subdivision (up to 6 lots with existing infrastructure)
|
$400 + $10 per lot
|
$0
|
$400 + $10 per lot
|
Yes
| |
Municipal project reimbursement fee (reimbursement based on
linear footage to site)
|
Construction cost + 2%
|
$0
|
Construction cost + 2%
|
Yes
| |
Professional fees
|
Cost + 10%
|
$0
|
Cost + 10%
|
Yes
| |
Portable storage unit permit
| |||||
Initial permit
|
$25
|
$0
|
$25
|
No
| |
Permit renewal
|
$50
|
$0
|
$50
|
No
| |
Violation, first offense
|
$25
|
$0
|
$25
|
No
| |
Violation, second offense
|
$50
|
$0
|
$50
|
No
| |
Violation, third offense
|
$100
|
$0
|
$100
|
No
| |
Public open space contribution
|
$325/dwelling unit
|
$0
|
$325/dwelling unit
|
No
| |
Rezoning
|
$500 + $25/acre
|
$0
|
$500 + $25/acre
|
Yes
| |
Site inspection, per visit
|
$35
|
$0
|
$35
|
No
| |
Street opening permit
|
10% of project cost
|
$0
|
10% of project cost
|
No
| |
Temporary sign permit
|
$15
|
$0
|
$15
|
No
| |
Utility review
|
$150
|
$0
|
$150
|
Yes
| |
Zoning compliance certificate for lot line adjustment
|
$100
|
$0
|
$100
|
Yes
| |
Zoning compliance certificate, residential
| |||||
Project cost $5,000 and below
|
$25
|
$0
|
$25
|
Yes
| |
Project cost $5,001 and above
|
0.5% of total project cost
|
$0
|
0.5% of total project cost
|
Yes
| |
Zoning violations fines
| |||||
First offense
|
Not less than $100
|
$0
|
Not less than $100
|
No
| |
Second offense
|
$250
|
$0
|
$250
|
No
| |
Third offense
|
$500
|
$0
|
$500
|
No
| |
Fourth and subsequent offenses
|
$1,000
|
$0
|
$1,000
|
No
|
* See § 180-1E for the sewer impact fee step increase schedule. Applicants will also be billed for the current Kent County sewer impact fee.
|
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
|
---|---|---|---|---|
Utility & Public Works Fees, Fines
| ||||
Farmington capping fee
|
$400
|
$0
|
$400
|
No
|
Farmington sewer connection fee
| ||||
4-inch
|
$1,700
|
$0
|
$1,700
|
No
|
6-inch
|
$3,000
|
$0
|
$3,000
|
No
|
Fire service connection
| ||||
4-inch
|
$3,000 + actual cost to install
|
$0
|
$3,000 + actual cost to install
|
Yes
|
6-inch
|
$3,500 + actual cost to install
|
$0
|
$3,500 + actual cost to install
|
Yes
|
8-inch
|
$4,000 + actual cost to install
|
$0
|
$4,000 + actual cost to install
|
Yes
|
10-inch
|
$6,000 + actual cost to install
|
$0
|
$6,000 + actual cost to install
|
Yes
|
Food service facility FOG interceptor or trap
| ||||
Inspection, per trap
|
$100
|
$0
|
$100
|
No
|
Reinspection, per trap
|
$200
|
$0
|
$200
|
No
|
Prohibited discharges violation fine, least serious
offenses
|
$500 or more
|
$0
|
$500 or more
|
No
|
Prohibited discharges violation fine, moderately
serious offenses
|
$3,000-$5,000
|
$0
|
$3,000-$5,000
|
No
|
Prohibited discharges violation fine, most serious
offenses
|
$5,000-$10,000
|
$0
|
$5,000-$10,000
|
No
|
Food service facility FOG interceptor or trap, criminal penalties
| ||||
§ 330-13B(1) per violation, per day
|
Up to $5,000
|
$0
|
Up to $5,000
|
No
|
§ 330-13B(2)
|
At least $5,000
|
$0
|
At least $5,000
|
No
|
§ 330-13B(3) per violation, per day
|
Up to $5,000
|
$0
|
Up to $5,000
|
No
|
§ 330-13B(4) per violation, per day
|
Up to $10,000
|
$0
|
Up to $10,000
|
No
|
Infrastructure inspection fee
|
4% of project cost
|
$0
|
4% of project cost
|
Yes
|
Public works service fee
| ||||
Normal business hours (8:00 a.m.-4:00 p.m.), per
hour
|
$50
|
$0
|
$50
|
No
|
After hours and weekends, per hour
|
$150
|
$0
|
$150
|
No
|
Service fee for disconnection/reconnection for nonpayment,
normal business hours
|
$50
|
$0
|
$50
|
No
|
Service fee for disconnection/reconnection for nonpayment,
after hours and weekends
|
$150
|
$0
|
$150
|
No
|
Tampering with meter, fine
|
$100
|
$0
|
$100
|
No
|
Backhoe, per hour
|
$100
|
$0
|
$100
|
No
|
Dump truck, per hour
|
$100
|
$0
|
$100
|
No
|
Vac truck, per hour
|
$150
|
$0
|
$150
|
No
|
Public Works rate, per hour
|
$50
|
$0
|
$50
|
No
|
Sewer connection fee
| ||||
4-inch service
|
$1,700
|
$0
|
$1,700
|
Yes
|
6-inch service
|
$2,600
|
$0
|
$2,600
|
Yes
|
Road restoration/additional pipe, beyond 20 feet
|
Cost + 15%
|
$0
|
Cost + 15%
|
Yes
|
Water connection fee
| ||||
1-inch service
|
$1,250
|
$0
|
$1,250
|
Yes
|
2-inch service
|
$3,600
|
$0
|
$3,600
|
Yes
|
Road restoration/additional pipe, beyond 20 feet
|
Cost + 15%
|
$0
|
Cost + 15%
|
Yes
|
Water meter
| ||||
5/8 inch
|
Cost + 15%
|
$0
|
Cost + 15%
|
No
|
1 inch or larger
|
Cost + 15%
|
$0
|
Cost + 15%
|
Yes
|
Water meter pit and lid
|
Cost + 15%
|
$0
|
Cost + 15%
|
No
|
Irrigation water meter permit
|
$200 + cost
|
$0
|
$200 + cost
|
No
|
Water meter antenna replacement
|
$125 + cost
|
$0
|
$125 + cost
|
No
|
Water meter calibration
|
$75
|
$0
|
$75
|
No
|
Data logger (after first request)
|
$75
|
$0
|
$75
|
No
|
Utility final read (after first request)
|
$35
|
$0
|
$35
|
No
|
Utility rate, in-City users, quarterly
| ||||
Sewer base fee, per EDU
|
$80
|
$0
|
$80
|
No
|
Sewer usage fee, per 1,000 gallons*
|
$5.76
|
$0
|
$5.76
|
No
|
Trash
|
Per contract
|
$0
|
Per contract
|
No
|
Water base fee, per EDU
|
$35
|
$0
|
$35
|
No
|
Water usage fee, per 1,000 gallons
|
$3.25
|
$0
|
$3.25
|
No
|
Sprinklers (as fire suppression), 2-inch
|
$125
|
$0
|
$125
|
No
|
Sprinklers (as fire suppression), 4-inch
|
$200
|
$0
|
$200
|
No
|
Sprinklers (as fire suppression), 6-inch
|
$250
|
$0
|
$250
|
No
|
Sprinklers (as fire suppression), 8-inch
|
$300
|
$0
|
$300
|
No
|
Utility rate, out-of-City users, quarterly
| ||||
Sewer base fee, per EDU
|
$106.40
|
$0
|
$106.40
|
No
|
Sewer usage fee, per 1,000 gallons*
|
$7.66
|
$0
|
$7.66
|
No
|
Water base fee, per EDU
|
$46.55
|
$0
|
$46.55
|
No
|
Water usage fee, per 1,000 gallons
|
$4.32
|
$0
|
$4.32
|
No
|
Utility late payment fee, per month
|
2%
|
$0
|
2%
|
No
|
* In addition to the sewer usage fee, users will be billed for
a Kent County treatment fee per published Kent County rate.
|
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
|
---|---|---|---|---|
Licensing Fees, Fines
| ||||
Business license
| ||||
All other trades, businesses or occupations, 1-9
employees
|
$100
|
$0
|
$100
|
No
|
All other trades, businesses or occupations, 10
or more employees
|
$150
|
$0
|
$150
|
No
|
Distributors and manufacturers, 1-49 employees
|
$250
|
$0
|
$350
|
No
|
Distributors and manufacturers, 50 or more employees
|
$500
|
$0
|
$500
|
No
|
Gas, light, power, cable, TV, telephone, satellite
companies
|
$825
|
$0
|
$825
|
No
|
Hotels and motels, bed-and-breakfasts, rooming houses,
treatment centers, per room
|
$15
|
$0
|
$15
|
No
|
Hotels and motels, bed-and-breakfasts, rooming houses,
treatment centers, per suite
|
$20
|
$0
|
$20
|
No
|
Mobile home park, per space
|
$25
|
$0
|
$25
|
No
|
Railroads
|
$825
|
$0
|
$825
|
No
|
Contractor license
|
$100
|
$0
|
$100
|
No
|
Failure to obtain license fine
| ||||
Per month
|
$200
|
$0
|
$200
|
No
|
Failure to obtain a rental inspection fine
| ||||
Per month
|
$100
|
$0
|
$100
|
No
|
Manufactured home annual license
|
$225
|
$0
|
$225
|
No
|
Manufactured home license, fine for failure to renew, per month
|
10%
|
$0
|
10%
|
No
|
Manufactured home park operator fines
| ||||
Allowing placement of manufactured home without
registration sticker, doubled if not paid within 10 days
|
$100
|
$0
|
$100
|
No
|
Allowing manufactured home to remain in park without
license, doubled if not paid within 10 days
|
$100
|
$0
|
$100
|
No
|
Removal of manufactured home without notifying the
City
|
$100
|
$0
|
$100
|
No
|
Peddler/solicitor license
|
$50
|
$0
|
$50
|
No
|
Rental license
|
$125
|
$0
|
$125
|
No
|
Rental license reinspection fee
|
$25
|
$0
|
$25
|
No
|
City of Harrington Fee Categories
|
Base Fee
|
Escrow Account Amount
|
Total Owed
|
Subject to Professional Fees
|
---|---|---|---|---|
Property Maintenance Fees, Fines
| ||||
Administrative fee, prohibited weed growth violations
|
$100
|
$0
|
$100
|
No
|
Alley closing
|
$300 per property owner + professional fees
|
$0
|
$300 per property owner + professional fees
|
Yes
|
Property maintenance violations
| ||||
First offense
|
$25
|
$0
|
$25
|
No
|
Second offense
|
$50
|
$0
|
$50
|
No
|
Third offense
|
$100
|
$0
|
$100
|
No
|
Abatement of property maintenance violations
|
Contractor service fee + 10% ($25 total minimum)
|
$0
|
Contractor service fee + 10% ($25 total minimum)
|
Yes
|
Property maintenance ticket
| ||||
Property maintenance ticket
|
$50
|
$0
|
$50
|
No
|
Formal appeal to City Manager
|
$200
|
$0
|
$200
|
No
|
Formal appeal to City Council
|
$500
|
$0
|
$500
|
No
|
Show-cause hearing
|
$100
|
$0
|
$100
|
No
|
Street and sidewalk violations
| ||||
First offense
|
$25
|
$0
|
$25
|
No
|
Second offense
|
$50
|
$0
|
$50
|
No
|
Third offense
|
$100
|
$0
|
$100
|
No
|
Abatement of street and sidewalk violations
|
Contractor service fee + 10% ($25 total minimum)
|
$0
|
Contractor service fee + 10% ($25 total minimum)
|
Yes
|
Sewer Impact Fee Step Increase Schedule
| |
---|---|
Fiscal Year
|
Sewer Impact Fee per EDU
|
2023
|
$2,595
|
2024
|
$3,059
|
2025
|
$3,166
|
2026
|
$3,277
|
2027
|
$3,392
|
2028
|
$3,511
|
2029
|
$3,634
|
2030
|
$3,761
|
2031
|
$3,893
|
2032
|
$4,029
|
2033
|
$4,170
|
Water Impact Fee Step Increase Schedule
| |
---|---|
Fiscal Year
|
Water Impact Fee per EDU
|
2024
|
$1,500
|
2025
|
$1,800
|
2026
|
$2,100
|
2027
|
$2,400
|
2028
|
$2,700
|
2029
|
$3,000
|
2030
|
$3,300
|
2031
|
$3,600
|
2032
|
$3,900
|
2033
|
$4,200
|
Type of Dwelling
|
Fee
|
---|---|
Single-family, maximum 200 amp service*
|
$110
|
Single-family, over 200 amp service*
|
$125
|
Modular dwelling, service and final only
|
$100
|
Modular dwelling, with additions
|
$120
|
Manufactured (mobile homes), service only
|
$85
|
*
|
Includes rough-in with service equipment and final inspection
(one trip each, two trips total).
|
Type of Service
|
Fee
|
---|---|
Alterations/additions, maximum of 30 devices
|
$85
|
Alterations/additions, more than 30 devices
|
$100
|
Services/feeder equipment, up to 400 amp
|
$75
|
Temporary construction service
|
$75
|
Swimming pools/hot tubs, 1 trip
|
$75
|
Swimming pools/hot tubs, 2 trips
|
$120
|
Alternate power sources, maximum 25 KVA
|
$120
|
Generators, maximum 30 KVA
|
$75
|
Reintroduction of power/survey
|
$100
|
Type of Equipment
|
Fee
|
---|---|
Rough wiring
| |
1 to 50 devices/outlets
|
$55
|
Each additional 25 devices/outlets
|
$15
|
Finals
| |
1 to 50 devices/outlets
|
$55
|
Each additional 25 devices/outlets
|
$15
|
Equipment
| |
First outlet of maximum 30 KW
|
$55
|
Each additional outlet
|
$15
|
Heat pumps
|
$55
|
Service equipment
| |
Maximum 400 amp
|
$75
|
Over 400 amp to 1,000 amp
|
$100
|
Over 1,000 amp
|
Quote
|
BVD value based on Occupancy Classification and Construction
Type
| |
X Square footage of occupancy/structure
| |
X Locality multiplier (standard
0.001)
| |
Inspection fee
|