[Amended 7-23-1985 by Ord. No. 85-11]
All appeals from the decision of the enforcing
agency shall be heard by the Gloucester County Construction Board
of Appeals.
[Amended 7-26-1977 by Ord. No. 77-10; 4-24-1984 by Ord. No. 84-6; 12-26-1989 by Ord. No.
89-23; 11-27-1990 by Ord. No. 90-29; 2-11-1992 by Ord. No. 92-3; 7-14-1992 by Ord. No. 92-15; 8-23-1994 by Ord. No. 94-19; 1-23-1996 by Ord. No. 96-4; 12-26-2000 by Ord. No. 00-42; 2-13-2001 by Ord. No.
01-9; 2-12-2002 by Ord. No. 02-1; 3-25-2003 by Ord. No. 03-05; 6-27-2006 by Ord. No. 06-30; 5-13-2008 by Ord. No. 08-36; 3-10-2020 by Ord. No. 20-08]
A. General. Enforcing agency fees shall be as follows:
(1) The fee for plan review shall be 20% of the amount to be charged
for a construction permit.
(a)
The elevator device plan review fee shall be as in Subsections
A(6) and
(7) below.
(b)
The fee for plan review for statewide prototype plans released
by the Department or for other prototype plans where the prototype
did not include the foundation detail shall be 5% of the amount to
be charged for a construction permit.
(2) The basic construction permit fee shall be the sum of the parts computed
on the basis of the volume or cost of construction, the number of
plumbing fixtures and pieces of equipment, the number of electrical
fixtures and rating of electrical devices, the number of sprinklers,
standpipes and detectors (smoke and heat and carbon monoxide) at the
unit rates and/or the applicable flat fees as provided herein, plus
any special fees.
(a)
Building volume or cost. The fees for new construction or alteration
are as follows:
[1]
Fees for new construction shall be based upon the volume of
the structure. Volume shall be computed in accordance with N.J.A.C.
5:23-2.28. The new construction fee shall be in the amount of $0.038
per cubic foot of volume for buildings and structures of all use groups
and types of construction as classified and defined in Articles 3
and 4 of the Building Subcode; except that the fee shall be $0.025
per cubic foot of volume for Use Groups A-1, A-2, A-3, A-4, A-5, F-1,
F-2, S-1 and S-2, and the fee shall be $0.030 per cubic foot for structures
on farms, including commercial farm building under N.J.A.C. 5:23-3.2(d),
with the minimum fee of $150, except in the case of small sheds, one-
and two-car garages and other small accessory structures on residential
property, the minimum fee shall be $70.
[2]
Fees for renovations, alterations and repairs or site construction
associated with preengineered systems of commercial farm buildings,
premanufactured construction, and the external utility connection
for premanufactured construction shall be based upon the estimated
cost of work. The fee shall be in the amount of $32 per $1,000. From
$50,001 to and including $100,000, the additional fee shall be in
the amount of $24 per $1,000 of estimated cost above $100,000. For
the purpose of determining estimated cost, the applicant shall submit
to the Department such cost data as may be available produced by the
architect or engineer of record, or by a recognized estimating firm,
or by the contractor.
[3]
A bona fide contractor's bid, if available, shall be submitted.
The Department shall make the final decision regarding estimated cost.
[4]
Fees for additions shall be computed on the same basis as for
new construction for the added portion.
[5]
Fees for combination renovations and additions shall be computed as the sum of the fees computed separately in accordance with Subsection
A(2)(a)[2] and
[3] above.
[6]
The fee for tents in excess of 900 square feet or more than
30 feet in any dimension shall be $120.
[7]
The fee for roofing and siding work completed on structures
of Group R-3 or R-5 shall be $70.
[8]
The fee for an aboveground swimming pool shall be $110 for a
pool with a surface area greater than 550 square feet; the fee in
all other cases shall be $70. The fee for an in-ground swimming pool
shall be $300 for a pool with a surface area greater than 550 square
feet; the fee in all other cases shall be $200.
[9]
Fees for retaining walls shall be as follows:
[a] The fee for a retaining wall with a surface area
greater than 550 square feet that is associated with a Class 3 residential
structure shall be $150;
[b] The fee for a retaining wall with a surface area
of 550 square feet or less that is associated with a Class 3 residential
structure shall be $75;
[c] The fee for a newly constructed retaining wall
of any size at other than a Class 3 residential structure shall be
based on the cost of the construction;
[d] Minimum fee for Building Subcode shall be $70.
(b)
Plumbing fixtures and equipment. The fees shall be as follows:
[1]
The fee shall be in the amount of $15 per fixture, piece of equipment or appliance connected to the plumbing system, and for each appliance connected to the gas piping or oil piping system, except as indicated in Subsection
A(2)(b)[2] below.
[2]
The fee shall be $90 per special device for the following: grease
traps, oil separators, refrigeration units, utility service connections,
backflow preventers equipped with test ports (double-check valve assembly,
reduced pressure zone and pressure vacuum breaker backflow preventers),
steam boilers, hot water boilers (excluding those for domestic water
heating), active solar systems, sewer pumps and interceptors. There
shall be no inspection fee charged for gas service entrances.
[3]
Minimum fee for plumbing subcode shall be $70.
(c)
Electrical fixtures and devices. The fee shall be as follows:
[1]
For the first block consisting of one to 50 receptacles, fixtures
or devices, the fee shall be $50; for each additional block consisting
of up to 25 receptacles, fixtures or devices, the fee shall be $10.
For the purpose of computing this fee, receptacles, fixtures or devices
shall include lighting fixtures, wall switches, convenience receptacles,
sensors, dimmers, alarm devices, smoke and heat detectors, communications
outlets, light standards eight feet or less in height, including luminaires,
emergency lights, electric signs, exit lights or similar electric
fixtures and devices rated 20 amperes or less including motors or
equipment rated less than one horsepower (hp) or one kilowatt (kw).
[2]
For each motor or electrical device rated from one hp or one
kw to 10 hp or 10 kw; for each transformer or generator rated from
one kw or one kva to 10 kw or 10 kva; for each replacement of wiring
involving one branch circuit or part thereof; for each storable pool
or hydromassage bathtub; for each underwater lighting fixture; for
household electric cooking equipment rated up to 16 kw; for each fire,
security or burglar alarm control unit; for each receptacle rated
from 30 amperes to 50 amperes; for each light standard greater than
eight feet in height, including luminaires; and for each communications
closet, the fee shall be $15.
[3]
For each motor or electrical device rated from greater than
10 hp or 10 kw to 50 hp or 50 kw; for each service equipment, panelboard,
switchboard, switchgear, motor control center, or disconnecting means
rated 225 amperes or less; for each transformer or generator rated
from greater than 10 kw or 10 kva to 45 kw or 45 kva; for each electric
sign rated from greater than 20 amperes to 225 amperes including associated
disconnecting means; for each receptacle rated greater than 50 amperes;
and for each utility load management device, the fee shall be $65.
[4]
For each motor or electrical device rated from greater than
50 hp or 50 kw to 100 hp or 100 kw; for each service equipment, panelboard,
switchboard, switchgear, motor control center or disconnecting means
rated from greater than 225 amperes to 1,000 amperes; and for each
transformer or generator rated from greater than 45 kw or 45 kva to
112.5 kw or 112.5 kva, the fee shall be $129.
[5]
For each motor or electrical device rated greater than 100 hp
or 100 kw; for each service equipment, panelboard, switchboard, switchgear,
motor control center or disconnecting means rated greater than 1,000
amperes; and for each transformer or generator rated greater than
112.5 kw or 112.5 kva, the fee shall be $640.
[6]
The fee charged for electrical work for each permanently installed private swimming pool as defined in the Building Subcode, spa, hot tub or fountain shall be a flat fee of $77, which shall include any required bonding, and associated equipment such as filter pumps, motors, disconnecting means, switches, required receptacles, and heaters, etc., excepting panelboards and underwater lighting fixtures. For public swimming pools, the fee shall be charged on the basis of number of electrical fixtures and rating of electrical devices involved in accordance with Subsection
A(2)(c)[1] through
[5] above.
[7]
The fee charged for the installation of single- and multiple-station smoke or heat detectors, carbon monoxide detectors and fire, burglar or security alarm systems in any one- or two-family dwelling shall be a flat fee of $70 per dwelling unit. For fire, burglar and security alarm systems and detectors in buildings other than one- or two-family dwellings, the fee shall be charged in accordance with Subsection
A(2)(c)[3],
[4] or
[5] above.
[8]
For installations consisting of multimeter stacks, the fee shall be based on the ampere rating of the main bus and not upon the number of meters or rating of disconnects on the meter stack. Individual load-side panelboards shall be charged in accordance with Subsection
A(2)(c)[3],
[4] or
[5] above. There shall be no additional fee charged for the concurrent installation of individual feeder conductors.
[9]
For motors or similar devices requiring concurrent installation
of individual controls, relays and switches, the fee shall be based
only upon the rating of the motor or device. There shall be no additional
fee charged for the concurrent installation of individual circuit
components, for example, controllers, starters, and disconnecting
means.
[10]
For electrical work requiring replacement of service entrance conductors or feeder conductors only, the fee shall be in accordance with Subsection
A(2)(c)[2] through
[5] above, based on the designated ampere rating of the overcurrent device of the service or feeder.
[11]
The fee charged for process equipment shall be based on ampere
rating of the overcurrent device protecting the conductor feeding
the process equipment or the cutoff device.
[12]
For the purpose of computing these fees, all electrical and
communications devices, utilization equipment and motors which are
part of premises wiring, except those which are portable plug-in type,
shall be counted.
(d)
For fire protection and hazardous equipment, sprinklers, standpipes,
detectors (smoke and heat), preengineered suppression systems, gas-
and oil-fired appliances not connected to the plumbing system, kitchen
exhaust systems, incinerators and crematoriums, the fee shall be as
follows:
[1]
The fee for 20 or fewer heads shall be $91; for 21 to and including
100 heads, the fee shall be $168; for 101 to and including 200 heads,
the fee shall be $321; for 201 to and including 400 heads, the fee
shall be $831; for 401 to and including 1,000 heads, the fee shall
be $1,150; for over 1,000 heads, the fee shall be $1,469.
[2]
The fee for one to 12 detectors shall be $50; for each 25 detectors
in addition to this, the fee shall be in the amount of $17.
[3]
The fee for each standpipe shall be $321.
[4]
The fee for each independent preengineered system shall be $129.
[5]
The fee for each gas- or oil-fired appliance that is not connected
to the plumbing system shall be $60.
[6]
The fee for each kitchen exhaust system shall be $60.
[7]
The fee for each incinerator shall be $365.
[8]
The fee for each crematorium shall be $365.
[9]
For single- and multiple-station smoke or heat detectors and carbon monoxide and fire alarm systems in any one- or two-family dwellings, there shall be a flat fee of $70 per dwelling unit. For detectors and fire alarm systems in buildings other than one- or two-family dwellings, the fee shall be charged in accordance with Subsection
A(2)(d)[2] above.
[10]
The fee for smoke control systems shall be $150.
[11]
The fee for fireplace venting and chimneys shall be $70.
[12]
The fee for flammable/combustible tanks shall be $150.
[13]
The fee for a fire pump shall be $180.
[14]
The fee for dry pipe/preaction systems shall be $100.
[15]
The fee for private fire service main/thrust block shall be
$300.
(e)
Mechanical Subcode fees: as follows: the replacement only of
heating equipment, cooling equipment or water heaters in Group R-3,
R-4 and R-5 structures (except electrical):
[2]
Fuel oil and gas piping connections: $15.
[3]
Steam and hot water boilers: $90.
[8]
Condensate drain pumps: $15.
(3) Fees for certificates and other permits are as follows:
(a)
The fee for a demolition or removal permit shall be $100 for
a structure of less than 5,000 square feet in area and less than 30
feet in height, for one- or two-family dwellings (Group R-3 or R-5
of the Building Subcode), structures on farms, including commercial
farm buildings under N.J.A.C. 5:23-3.2(d), and $200 for all other
groups. Tank removals: $150.
(b)
The fee for a permit to construct a sign shall be as follows:
[1]
Fees for pylon signs shall be $4 per square foot for the first
100 square feet, $3 per square foot for the next 400 square feet and
$2 per square foot thereafter;
[2]
Fees for ground signs or wall signs shall be $2 per square foot
for the first 100 square feet, $1.50 per square foot for the next
400 square feet and $1 per square foot thereafter;
[3]
The minimum fee shall be $70.
(c)
The fee for a certificate of occupancy shall be $200.
(d)
The fee for a certificate of occupancy granted pursuant to a
change of use group shall be $250.
(e)
The fee for a certificate of continued occupancy issued under
N.J.A.C. 5:23-2.23(c) shall be $250.
(f)
The fee for the first issuance and the renewal of a temporary
certificate of occupancy shall be $30.
[1]
Exception: There shall be no fee for the first issuance of the
temporary certificate of occupancy provided the certificate of occupancy
fee is paid at that time.
[2]
Exception: Where a written request for a temporary certificate
of occupancy is made for reasons other than uncompleted work covered
by the permit (such as uncompleted work required by prior approvals
from state or municipal agencies), no renewal fee shall be charged.
(g)
The fee for plan review of a building for compliance under the
alternate systems and nondepletable energy source provisions of the
energy subcode shall be $285 for one- and two-family dwellings (Group
R-3 or R-5 of the Building Subcode), and for light commercial structures
having the indoor temperature controlled from a single point, and
$1,369 for all other structures. The fee for an application for variation
in accordance with N.J.A.C. 5:23-2.10 shall be $600 for Class I structures
and $120 for Class II and Class III structures. The fee for resubmission
of an application for a variation shall be $250 for Class I structures
and $70 for Class II and Class III structures. The fee for a permit
for lead hazard abatement work shall be $140. The fee for a lead abatement
clearance certificate shall be $28.
(4) For cross connections and backflow preventers that are subject to
testing, requiring reinspection annually, the fee shall be $70 for
each device when they are tested.
(5) Annual permit requirements are as follows:
(a)
The fee to be charged for an annual construction permit shall
be charged annually. This fee shall be a flat fee based upon the number
of maintenance workers who are employed by the facility, and who are
primarily engaged in work that is governed by a subcode. Managers,
engineers and electricians shall not be considered maintenance workers
for the purpose of establishing the annual construction permit fee.
Annual permits may be issued for building/fire protection, electrical
and plumbing.
(b)
Fees for annual permits shall be as follows:
[1]
One to 25 workers (including foremen), $667/worker; each additional
worker over 25, $232/worker.
[2]
Prior to the issuance of the annual permit, a training registration
fee of $140 per subcode and a list of not more than three individuals
to be trained per subcode shall be submitted by the applicant to the
Department of Community Affairs, Bureau of Code Services, Education
Unit, along with a copy of the construction permit (Form F170). Checks
shall be made payable to "Treasurer, State of New Jersey." The Department
shall register these individuals and notify them of the courses being
offered.
(6) The fee for plan review for elevator devices in structures of Group
R-3, R-4, or R-5 and for elevator devices wholly within dwelling units
in structures of Group R-2 shall be $100 for each device.
(7) The fee for plan review for elevator devices in structures of groups other than R-3, R-4, or R-5 and devices in structures of Group R-2 exempted by Subsection
A(6) above shall be $260 for each device.
(8) The fees for elevator device inspections and tests shall be as set
forth in N.J.A.C. 5:23-12.
(9) The fee for a mechanical inspection in a structure of Group R-3 or
R-5 by a mechanical inspector shall be $60 for the first device and
$10 for each additional device. No separate fee shall be charged for
gas, fuel oil, or water piping connections associated with the mechanical
equipment inspected.
(10)
The fee for the annual electrical inspection of swimming pools,
spas or hot tubs shall be $100.
(a)
The fee for an application by a manufacturer, distributor, owner
or any other person for approval of any fixture, appurtenance, material
or method, pursuant to N.J.A.C. 5:23-3.8, shall be an amount equal
to the cost incurred, or to be incurred, by the Department for such
tests as the Department may require, plus an administrative surcharge
in the amount of 10% of such cost.
(b)
Hourly charges and fees for development-wide inspection of homes
after issuance of a certificate of occupancy shall be in such amount
as may be reasonable and necessary in order to ascertain whether a
violation exists or to verify that any work performed has abated the
violation.
[1]
The hourly charge shall be the same as the hourly charge set
forth at N.J.A.C. 5:23-4.20(b)4 times the number of hours spent by
the code official in determining whether a violation exists or verifying
that any work performed has abated the violations.
[2]
Any appeal of a charge levied by the Department pursuant to
this subsection shall be made in accordance with N.J.A.C. 5:23-2.38.
(11)
Photovoltaic solar panel systems:
(a)
Electrical flat fee, each: $200 for under 10kw; over 10kw: $300;
over 20kw to 30kw: $400.
(b)
Building flat fee, each: $200.
(c)
System greater than 100 kilowatts, building flat fee: $400.
(d)
System greater than 100 kilowatts, electrical flat fee: $400.
(e)
Solar farms priced as per fixtures.
(12)
Minimum fees. There shall be a minimum fee of $70 per technical
section.
(13)
State of New Jersey training fee.
(a)
In order to provide for the training and certification and technical
support programs required by the Act an enforcing agency shall collect a surcharge fee to be
based upon the volume of new construction within the municipality.
Said fee shall be accounted for and forwarded to the Bureau of Housing
Inspection in the manner herein provided.
(b)
Amount. This fee shall be in the amount of $0.00371 per cubic
foot volume of new construction. Volume shall be computed in accordance
with N.J.A.C. 5:23-2.28; the fee for all other construction shall
be $1.90 per $1,000 of value of construction. The municipality shall,
in addition to the fees described in Subsection A(12)(a) above, collect
the above fees as part of its usual responsibilities.
[Amended 3-14-2023 by Ord. No. 23-02]
(c)
Remitting and reporting. The municipality shall remit fees to
the Bureau on a quarterly basis, in conjunction with Report Number
R-840A State Training Fee Report in accordance with N.J.A.C. 5:23-4.5(d).
Fees remitted shall be for the quarter. Checks shall be made payable
to "Treasurer, State of New Jersey."