[Ord. No. 2017-05, 4-24-2017; Ord. No. 2020-09, 10-26-2020]
A. 
Permit fees for all of the permits to be issued pursuant to any of the technical codes adopted in Article I of this Chapter shall be based upon the cost of construction.
1. 
The fee schedule for residential construction shall be as follows:
$5.00 per $1,000.00 of construction cost from $1,000.00 to $5,000.00
plus
$3.00 per $1,000.00 of construction cost in excess of $5,000.00
2. 
The fee schedule for commercial/industrial construction shall be as follows:
$7.00 per $1,000.00 of construction cost from $1,000.00 to $5,000.00
plus
$4.00 per $1,000.00 of construction cost in excess of $5,000.00