Fees have been established by the Municipality to defray plan review and construction inspection costs incurred by the Municipality. All fees shall be paid by the applicant at the time of SWM site plan submission. The Council shall establish a review and inspection fee schedule by resolution from time to time based on the size of the regulated activity and based on the Municipality's costs for reviewing SWM site plans and conducting inspections pursuant to Section 1054.31. The Municipality shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
The fees required by this chapter shall at a minimum cover:
(a) 
Administrative costs.
(b) 
The review of the SWM site plan by the Municipality and the municipal Engineer.
(c) 
The site inspections.
(d) 
The inspection of stormwater management facilities and drainage improvements during construction.
(e) 
Attendance at meeting.
(f) 
The final inspection upon completion of the stormwater management facilities and drainage improvements presented in the SWM site plan.
(g) 
Any additional work required to enforce any permit provisions regulated by this chapter, correct violations, and assure proper completion of stipulated remedial actions.