Applicants are encouraged to schedule a pre-application meeting
to review the overall stormwater management concept with the Department
of Public Works. The pre-application meeting is not mandatory and
shall not constitute formal filing of a plan with the City of Lancaster.
Topics discussed may include the following:
A. Available geological maps, plans and other available data.
B. Findings of the site analysis including identification of any environmentally
sensitive areas, wellhead protection areas, riparian corridors, hydrologic
soil groups, existing natural drainageways, karst features, areas
conducive to infiltration to be utilized for volume control, etc.
C. Results of infiltration tests.
D. Applicable City Subdivision and Land Development and/or Zoning Ordinance provisions.
E. The conceptual project layout, including proposed structural and
nonstructural BMPs.
Approval of an SWM site plan shall be valid for a period not to exceed five years. This time period shall commence on the date that the City of Lancaster approves the SWM site plan. If a certificate of completion as required by §
260-508 of this chapter has not been submitted within the specified time period, then the City of Lancaster may consider the SWM site plan disapproved and may revoke any and all permits issued by the City of Lancaster. SWM site plans that are considered disapproved by the City of Lancaster may be resubmitted in accordance with §
260-504 of this chapter.