The municipality may include all costs incurred in the review fee charged to an applicant.
A. 
The review fee may include, but not be limited to, costs for the following:
(1) 
Administrative/clerical processing;
(2) 
Review of the SWM site plan, agreements, covenants or restrictions required by the chapter by the municipality, the Municipal Engineer and other municipal consultants, including the Municipal Solicitor;
(3) 
Coordination and meetings with the applicant;
(4) 
The inspection of erosion and sediment control measures, BMPs, conveyances and other related improvements during construction;
(5) 
Review of project communications, reports, and additional supporting information;
(6) 
Other site inspections;
(7) 
The final inspection upon completion of the BMPs, conveyances, and other stormwater management facilities and related improvements presented in the SWM site plan; and
(8) 
Review of final as-built plan submission and revised calculations, and inspections as needed.
B. 
The applicant shall also reimburse all expenses incurred by the municipality for any additional work or municipal consultant fees required to enforce any permit provisions regulated by this chapter, correct violations, and ensure proper completion of remedial actions.
C. 
Exempt projects fee.
[Added 6-12-2023 by Ord. No. 2023-3]
(1) 
Applicants submitting projects that meet the requirements of § 188-14A are required to pay a fee of $1.00 per square foot of newly proposed impervious surface. Removal of any existing impervious areas shall not be considered in the calculation of this fee.
(2) 
Fee may be amended from time to time by resolution of Borough Council.
(3) 
Fee will be deposited into a designated stormwater fund managed by the Borough specifically for improvements to Borough-owned stormwater infrastructure and within the conveyance system.