The following improvements shall be installed by the subdivider. The
final plan shall not be approved until final detailed design of the improvements
is approved and the improvements are installed or security to the Borough
Council is provided.
Streets shall be brought to the grades and dimensions drawn on plans, profiles and cross-sections submitted by the subdivider and approved by the Borough Engineer. The subdivider must install the required utilities and provide, where necessary, adequate subsurface drainage for the streets. The streets shall be designed and constructed to the standards set forth in §§
183-23 and
183-24 of this chapter.
Curbs and sidewalks shall be provided in accordance with the standards set forth in §
183-25 of this chapter.
A storm drainage system shall be provided in accordance with the standards as set forth in §
183-26 of this chapter.
All improvements shall be installed according to a time schedule which
shall be approved by the Borough Council.
At the time each improvement is to be installed and upon its completion,
the subdivider shall notify the Borough Council so that adequate inspections
can be made. The inspection will be made by the Borough Engineer. All costs
of undertaking the inspection will be borne by the subdivider.
In the event that any improvements which may be required have not been
installed as provided in this chapter or in accord with the approved final
plat, the Borough Council is hereby granted the power to enforce any corporate
bond or other security by appropriate legal and equitable remedies. If the
proceeds of such bond or other security are insufficient to pay the cost of
installing or making repairs or corrections to all the improvements covered
by said security, the Borough Council may, at its option, install part of
such improvements in all or part of the subdivision or land development and
may institute appropriate legal or equitable action to recover the moneys
necessary to complete the remainder of the improvements. All of the proceeds,
whether resulting from the security or from any legal or equitable action
brought against the developer, or both, shall be used solely for the installation
of the improvements covered by such security and not for any other Borough
purpose.