No permit required under the Uniform Code accepted
by this chapter or other provisions of this Code relating to buildings
or structures shall be issued nor any application accepted until the
fee prescribed in this article shall be paid. In the event that a
lower or different fee is prescribed in any other code, law or resolution,
the fee prescribed in this article shall be paid.
For each addition, alteration, new building
or structure, fees shall be as set from time to time by the Board
of Trustees.
For the demolition of any building or structure
(except temporary buildings or structures), the fee shall be as set
from time to time by the Board of Trustees for each building to be
demolished.
For moving of a building or structure from one
lot to another, the fee shall be at the rate set from time to time
by the Board of Trustees.
For each installation of a sign, the permit
fee shall be as set from time to time by the Board of Trustees.
For each installation of an awning or marquee,
upon the Board's approval, the fee shall be as set from time to time
by the Board of Trustees.
For each installation of a fire escape, the
fee shall be set from time to time by the Board of Trustees.
For each heating system (not heating units),
standpipe, sprinkler, elevator, or refrigeration installation, including
hot-air heat and central air-conditioning systems, the installation
permit fee shall be as set from time to time by the Board of Trustees.
For each certificate of occupancy, the fees
shall be as set from time to time by the Board of Trustees.
Permit fees for electrical work shall be as
set from time to time by the Board of Trustees.
The fees for new construction or alterations
of heating work shall be as set from time to time by the Board of
Trustees.
The fees for new construction or alteration
of plumbing work shall be as set from time to time by the Board of
Trustees.
For each tie-in to the Village sewer main, regardless
of pipe size, a fee shall be charged as set from time to time by the
Board of Trustees.
Blasting permit fees shall be as set from time
to time by the Board of Trustees.
Codes and maps shall be made available upon
payment of fees set from time to time by resolution of the Village
Board of Trustees.
Fees for PRD approval shall be set from time
to time by resolution of the Village Board of Trustees.