The Clementon Mayor and Borough Council establishes
the Camden County Board of Appeals to hear all appeals from decisions
of the enforcing agency.
[Last amended 12-30-2002 by Ord. No. 2002-27]
A. The fee for a construction permit shall be the sum
of the subcode fees listed below and shall be paid before the permit
is issued.
(1) The building subcode fee shall be:
[Amended 10-18-2011 by Ord. No. 2011-18]
(a)
For new residential construction: $0.040 per cubic foot of building
or structure volume.
(b)
For new commercial construction: $0.030 for Use Groups A-4,
F-1, F-2, S-1, and S-2; all other commercial construction: $0.040
per cubic foot of building or structure.
(c)
For renovations, alterations, minor construction and repairs:
[1]
Estimated cost up to and including $50,000: $35 per thousand
or fraction thereof.
[2]
Estimated cost of $50,001 up to and including $100,000: $32
per thousand or fraction thereof.
[3]
Estimated cost above $100,001: $29 per thousand or fraction
thereof.
[4]
The minimum fee shall be $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
(d)
For demolition or removal:
[1]
Structures of less than 5,000 square feet and less than 30 feet
in height, one- and two-family residences and structures on farms:
$82.
[2]
All other use groups: $151.
(e)
For signs:
[1]
The fee for a permit to construct a sign shall be $3 per square
foot of surface area of the sign.
[2]
The minimum fee shall be $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
(f)
For pools:
[1]
In-ground and aboveground pools: $150.
(g)
For fences:
[1]
The fee for fences over six feet high shall be based on the cost of the project pursuant to §
105-3A(1)(c) with a minimum fee of $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
[2]
Zoning approval is required for fences.
(h)
Roofing and siding:
[Amended 3-3-2020 by Ord. No. 2020-05]
[1]
The fee for Use Groups R-3 and R-4 shall be $75.
[2]
The fee for all other use groups shall be based on the cost of the project pursuant to §
105-3A(1)(c) with a minimum fee of $75.
(2) The plumbing subcode fee shall be:
(a)
The fee shall be in the amount of $18 per fixture
or stack as listed below:
[Amended 10-4-2011 by Ord. No. 2011-17; 3-3-2020 by Ord. No. 2020-05]
[17] Gas piping/gas service entrances.
(b)
The fee shall be in the amount of $92 per special
device as listed below:
[Amended 10-4-2011 by Ord. No. 2011-17; 3-3-2020 by Ord. No. 2020-05]
[6]
Water-cooled air conditioners.
[8]
Water utility connections.
[9]
Sewer utility connections.
(c) Required annual reinspection of backflow preventers: $75 for each
device.
[Added 10-18-2011 by Ord. No. 2011-18; amended 3-3-2020 by Ord. No. 2020-05]
(d)
The minimum fee shall be $75.
[Amended 10-18-2011 by Ord. No. 2011-18; 3-3-2020 by Ord. No. 2020-05]
(3) Electrical subcode fees shall be as follows:
[Amended 10-18-2011 by Ord. No. 2011-18]
(a)
All switches, receptacles and lighting outlets:
[Amended 10-18-2011 by Ord. No. 2011-18; 3-3-2020 by Ord. No. 2020-05]
|
Number
|
Fee
|
---|
|
1 to 50
|
$60.00
|
|
Each additional 25 or fraction
|
$15.00
|
(b)
Motors:
[Amended 10-18-2011 by Ord. No. 2011-18]
|
Size
(horsepower)
|
Fee
|
---|
|
Over 1 to 10
|
$15.00
|
|
Over 10 to 50
|
$60.00
|
|
Over 50 to 100
|
$120.00
|
|
Over 100
|
$576.00
|
(c)
Electrical devices/generators/transformers:
[Amended 10-18-2011 by Ord. No. 2011-18; 3-3-2020 by Ord. No. 2020-05]
|
Size
(kilowatts)
|
Fee
|
|
Over 1 to 50
|
$75.00
|
|
Over 10 to 50
|
$116.00
|
|
Over 50 to 100 plus
|
$576.00
|
(d)
Electrical items:
[Amended 3-3-2020 by Ord. No. 2020-05]
|
Item
|
Fee
|
---|
|
Ranges/ovens/surface units (1 to
10 kilowatts)
|
$15.00 each
|
|
Ranges (over 10 kilowatts)
|
$46.00
|
|
Dishwashers
|
$15.00
|
|
Garbage disposals
|
Include in fixture total
|
|
Dryers
|
$15.00
|
|
Air-conditioner units
|
$15.00
|
|
Burglar alarm/intercom systems
|
$43.00
|
|
Smoke detectors
|
Include in fixture total
|
|
Whirlpools/spas
|
$15.00
|
|
Water heaters
|
$15.00
|
|
Central heat
|
$15.00
|
|
Baseboard heat
|
$15.00
|
|
Thermostats
|
Include in fixture total
|
|
Heat pumps
|
By horsepower size
|
|
Motor control centers/subpanels
|
By ampere size
|
|
Signs
|
$15.00
|
|
Light standards
|
$15.00
|
|
Motors (fractional horsepower)
|
Include in fixture total
|
|
Motors (all others)
|
$15.00
|
|
Pool bonding
|
|
Per SE
|
No charge
|
|
Charge for GFI
|
$15.00
|
|
Pool filter motor (over 1 horsepower)
|
$15.00
|
|
(Subpanel for pools, if listed)
|
By size
|
(e)
Service panels/service entrance/subpanels:
[Amended 10-18-2011 by Ord. No. 2011-18; 3-3-2020 by Ord. No. 2020-05]
|
Size
(amperes)
|
Fee
|
---|
|
0 to 225
|
$82.00
|
|
Over 225 to 1,000
|
$135.00
|
|
Over 1,000
|
$576.00
|
(f)
Annual public pool inspection:
[Amended 10-18-2011 by Ord. No. 2011-18; 3-3-2020 by Ord. No. 2020-05]
[1]
Pool, spa, or hot tub: $75 each.
(g)
The minimum fee for electrical inspections shall
be $75.
[Amended 10-18-2011 by Ord. No. 2011-18; 3-3-2020 by Ord. No. 2020-05]
(4) Fire subcode fees shall be as follows:
[Amended 10-18-2011 by Ord. No. 2011-18]
(a)
Sprinkler heads:
|
Number
|
Fee
|
---|
|
1 to 20
|
$82.00
|
|
21 to 100
|
$151.00
|
|
101 to 200
|
$289.00
|
|
201 to 400
|
$748.00
|
|
401 to 1,000
|
$1,036.00
|
|
Over 1,000
|
$1,323.00
|
(b)
Heat/smoke detectors:
|
Number
|
Fee
|
---|
|
1 to 20
|
$75.00
|
|
Over 100
|
$130.00 per hundred
|
(d)
Independent pre-engineered: $116 each system.
(e)
Gas- or oil-fired appliance which is not connected to the plumbing
system: $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
(f)
Kitchen exhaust system: $75 each.
[Amended 3-3-2020 by Ord. No. 2020-05]
(g)
Incinerator/crematorium: $460 each.
(i) Solar fee: $75.
[Added 9-7-2021 by Ord. No. 2021-10]
(j)
The minimum fee shall be $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
(k)
Installation of an elevator.
[1]
Fees for witnessing acceptance tests and performing inspections
on new and altered elevator devices shall be as follows:
[a]
The basic fees for elevator devices in structures not in Use
Group R-3 or R-4, or in an exempted R-2 structure, shall be as follows:
[i] Traction and winding drum elevators:
|
1 to 10 floors
|
$306
|
|
Over 10 floors
|
$510
|
[ii] Hydraulic elevators: $272.
[iii] Roped hydraulic elevators: $306.
[iv] Escalators, moving walks: $272.
[vi] Stairway chairlifts, inclined and vertical wheelchair
lifts and manlifts: $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
[b]
Additional charges for devices equipped with the following features
shall be as follows:
[i] Oil buffers (charge per oil buffer): $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
[ii] Counterweight governor and safeties: $136.
[iii] Auxiliary power generator: $102.
[c]
The Department fee for elevator devices in structures in Use
Group R-3 or R-4, or otherwise exempt devices in R-2 structures, shall
be $204. This fee shall be waived when signed statements and supportive
inspection and acceptance test reports are filed by an approved qualified
agent or agency in accordance with N.J.A.C. 5:23-2.19 and 5:23-2.20.
[d] The fee for performing inspections of minor work shall be $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
[e] The fee for plan review for elevator devices in structures in Use
Groups R-3 and R-4, and for elevator devices wholly within dwelling
units in R-2 structures, shall be $75 for each device.
[Amended 3-3-2020 by Ord. No. 2020-05]
[f] The fee for plan review for elevator devices in structures in use
groups other than R-3 and R-4, and otherwise exempt devices in R-2
structures, shall be $260 for each device.
B. The fees for certificates of occupancy shall be as
follows:
(1) Other-than-residential fee shall be $120.
(2) One- and two-family residences less than 5,000 square
feet in area and less than 30 feet in height shall be $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
(3) The fee for a certificate of occupancy granted to
change the use shall be $174.
(4) The fee for a certificate of occupancy for residential
shall be $75.
[Amended 3-3-2020 by Ord. No. 2020-05]
(5) The fee for all other use groups shall be $120.
(6) The
fee for a certificate of continued occupancy: $151.
[Added 10-18-2011 by Ord. No. 2011-18]
(7) The
fee for renewal of a temporary certificate of occupancy: $65.
[Added 10-18-2011 by Ord. No. 2011-18; amended 3-3-2020 by Ord. No. 2020-05]
C. The Department of Community Affairs training fees
shall be as follows:
(1) As required by the Uniform Construction Code Act, a surcharge of $0.0034 per cubic foot of volume of the
new construction.
[Amended 3-3-2020 by Ord. No. 2020-05]
(2) A surcharge of $0.00190 for permits, other than new
construction, based on the estimated cost of the work over $625.
[Amended 3-3-2020 by Ord. No. 2020-05]
(3) The surcharge is to be remitted to the Bureau of Housing
Inspection, Department of Community Affairs, on a quarterly basis.
D. Asbestos abatement; fees:
(1) The administrative fee for each construction permit
for asbestos abatement shall be $125.
[Amended 10-18-2011 by Ord. No. 2011-18; 3-3-2020 by Ord. No. 2020-05]
(2) The administrative fee for each certificate of occupancy
after the successful completion of an asbestos hazard abatement project
shall be $35.
[Amended 10-18-2011 by Ord. No. 2011-18; 3-3-2020 by Ord. No. 2020-05]
(3) The authorization and reauthorization fees for the
asbestos safety control monitor shall be as set forth in N.J.A.C.
5:23-8.18.
(4) The application fee for certification as an asbestos
safety technician shall be as set forth in N.J.A.C. 5:3-8.19.
E. Lead abatement fees:
[Amended 10-18-2011 by Ord. No. 2011-18]
(1) The administrative fee for lead hazard abatement work
shall be $176.
(2) The fee for a lead abatement clearance certificate
shall be $50.
[Amended 3-3-2020 by Ord. No. 2020-05]
F. Plan review fee. The plan review fee shall be 40%
of each listed fee. Where the Construction Department performs plan
review only, the plan review fee shall be in the amount of 25% of
the new construction permit fee.
G. Application for a variation fee. In accordance with
N.J.A.C. 5:23-2.10, an application for a variation fee shall be $748
for Class I structures and $151 for Class II and Class III structures.
The fee for resubmission of an application for a variation shall be
$289 for Class I structures and $82 for Class II and Class III structures.
[Amended 10-18-2011 by Ord. No. 2011-18]