[Amended by Ord. No. 3-1998]
A. Prior to the issuance of a permit for any development
other than for detached one- or two-dwelling-unit residential buildings,
and as a condition for the issuance of any such permit for development,
a site plan prepared by a L.S., P.E., R.A., or P.P. shall be submitted
to the Planning Board for its review and approval, except that the
resolution of the Board of Adjustment shall substitute for that of
the Planning Board whenever the Board of Adjustment has jurisdiction
over a site plan pursuant to N.J.S.A. 40:55D-76. This requirement
shall be applicable for any addition to or alteration of an existing
structure or of parking facilities related to any structure; to any
change in use of a structure other than those herein exempted, or
to removal of vegetation or disturbance of soil in an area of over
5,000 square feet except for agricultural purposes.
B. In the event that the change in use will not require
a building permit, nor any permit from Hunterdon County Soil Conservation
Service, nor an additional requirement for off-street parking, then
an applicant shall file an application for exemption from the other requirements set forth herein. The Planning Board shall review each request for exemption at a meeting and consider evidence, comments of its professionals and the public, and act upon the request to grant the exemption or reject the request and require the applicant to file the formal site plan as otherwise required herein. The fee for the exemption application is included in Chapter
205, Article
II, Fee Schedule. The application for exemption shall be on a form provided by the Planning Board.
[Amended 4-18-2007 by Ord. No. 2007-7]
[Amended by Ord. No. 2-1993]
A. Submission requirements for tentative approval. The
preliminary site plan and any engineering and architectural documents
required shall be in tentative form for discussion purposes for preliminary
approval. If the submission of the developer is found to be incomplete,
the developer shall be notified thereof within 45 days of the submission
of the application or it shall be deemed to be properly submitted.
B. Time for decision.
(1) Upon the submission to the secretary of a complete
application for preliminary site plan for 10 acres of land or less,
and 10 dwelling units or less, the Board shall grant or deny preliminary
approval within 45 days of the date of such submission or within such
further time as may be consented to by the applicant.
[Amended 4-18-2007 by Ord. No. 2007-7]
(2) Upon the submission of a complete application for
a preliminary site plan for more than 10 acres, or more than 10 dwelling
units, the Board shall grant or deny preliminary approval within 95
days of the date of such submission or within such further time as
may be consented to by the applicant.
[Amended 4-18-2007 by Ord. No. 2007-7]
(3) If not acted upon within the above time limits or
extension thereof, preliminary approval of the site plan shall be
deemed to have been granted.
C. Decisions.
(1) The Board shall grant preliminary site plan approval
if the proposed development complies with the requirements of this
section.
(2) If the site plan is denied, the reasons for denial
shall be stated upon the records of the Planning Board.
(3) The Board, when acting upon applications for preliminary
site plan approval, shall have the power to grant such exceptions
from the requirements for site plan approval as may be reasonable
and within the general purpose and intent of the provisions for site
plan review and approval in this section, if the literal enforcement
of one or more provisions of this section is impractical or will exact
undue hardship because of peculiar conditions pertaining to the land
in question, or relating to the proposed use. In any such case, the
Board shall, in its resolution, set forth its findings of fact and
conclusion of law. The Board shall also reserve the right to make
an adjustment of the fees in accordance with the schedules set forth
herein.
(4) If the Board acts favorably on the preliminary site
plan, the Chairman and Secretary shall affix their signatures to the
site plan.
Preliminary approval of a site plan shall confer
upon the applicant the following rights for a three-year period from
the date of preliminary approval:
A. The general terms and conditions on which preliminary
approval was granted shall not be changed.
B. The applicant may submit for final approval on or
before the expiration date of preliminary approval the whole or a
section or sections of the preliminary site plan.
C. The Board may grant extensions of such preliminary
approval for additional periods of at least one year but not to exceed
a total extension of two years, provided that if the design standards
have been revised by ordinance such revised standards shall govern.
D. The Board may grant all of the above rights for a
period of time longer than three years for a site plan with an area
of 50 acres or more. Such length of time shall take into consideration
the number of dwelling units, the economic conditions and the comprehensiveness
of the development among others. The Board may grant an extension
of preliminary approval for such additional periods of time as shall
be determined by the Planning Board and for the same reasons as stated
above. In granting any extensions, the Planning Board may attach reasonable
conditions to the extension, such as a required timetable of development.
The Secretary of the Board approving a preliminary
site plan shall certify two full sets, on each page, with an appropriate
stamp showing date of approval, file number, Chairman's signature
and Secretary's signature. One set shall be given to the applicant,
and one set shall be retained in the official files of the Board.
[Added 11-4-2009 by Ord. No. 2009-09]
Information required for minor site plan approval is as follows:
A. One original and 13 copies of the application form.
B. Fourteen copies of the plans, which need not be prepared by a professional
land surveyor, professional engineer or professional planner, provided
that the information is clearly shown, is drafted to scale upon a
previously prepared survey of the subject property, and is reproducible
for record keeping purposes.
C. Acreage of the property, north arrow and approval signature lines.
D. Existing block and lot numbers of the subject lots as they appear
on the Township Tax Map.
E. Photographs (14 sets) from perimeter of property into the subject
property, with a sketch indicating from where the photographs were
taken.
F. Photographs (14 sets) from perimeter of property into adjacent sites,
with a sketch indicating from where the photographs were taken.
G. The location of existing and proposed structures, parking areas and
driveways on the site.
H. The zoning district within which the property is located, including the schedule of applicable zoning requirements pursuant to Chapter
400, Schedule 1.
I. Existing vegetation on site and proposed landscaped areas.
J. Floor plans of existing and proposed buildings and structures on
site, with a clear delineation and square footage calculations.
K. Existing and proposed building and lot coverage of the property.
L. Proposed hours of operation.
M. Existing and proposed signage and lighting on the property.
N. An identification and description of all vehicles and pieces of equipment
(type and size) on the property at any time, with an identification
of which vehicles will be garaged on site and where such vehicles
will be garaged.
O. A brief narrative description of the use, indicating any delivery
or pickup services, equipment used, nature of activity, products and/or
clientele, the nature of sounds emitted from the site, and a description
of any equipment that may cause interference with radio or television
reception.
P. The names of all property owners within 200 feet as they appear on
the most recent tax list prepared by the Township Tax Assessor.
Q. Application and escrow fees.
R. Certificate from the Township Tax Collector that all taxes and assessments
are paid to date.
S. Affidavit of property ownership.
T. Name, address and telephone number of owner.
U. Name, title, address and license number of any professional who prepared
the plan.
An application for site plan review made in
conjunction with an application for a use variance shall be filed
simultaneously with the application to the Zoning Board of Adjustment
unless the applicant chooses to submit a separate application in accordance
with N.J.S.A. 40:55D-76b after the use variance has been approved.
[Amended by Ord. No. 2001-25]
Each site plan shall provide for the following:
A. The layout of the land development shall be consistent with Chapter
400, Zoning, except in those cases where application is being made to the Zoning Board of Adjustment for a variance from the terms and provisions of Chapter
400, Zoning.
B. Safe and efficient vehicular and pedestrian circulation.
C. Off-street parking and loading.
D. Adequate screening and landscaping.
F. Adequate water supply, drainage, percolation tests,
soil logs, sewage facilities and other utilities necessary for essential
service to visitors, residents and occupants.
G. Any area reserved for public use shall be of suitable
size, shape and location to serve its intended purposes.
H. No development shall take place in a delineated floodway
area, and shall be permitted in a delineated flood fringe area only
where it is determined by the Township Engineer that the first floor
elevation will be above the flood level, and that construction and
landfilling will not significantly increase flooding in other areas.
I. Adequate protection and conservation of soils through
the submission of an erosion and sedimentation control plan approved
by the appropriate authority for all site plans that will result in
disturbance of 5,000 square feet of land or more.
J. Standards for the grading, improvement and construction
of roads or driveways and for any required walkways, curbs, gutters,
lights, drainage, sewage facilities and other improvements found necessary
shall be provided by the Township Engineer. Where certain utilities
or improvements to be installed are under other governmental authority
or jurisdictions, the standards shall be provided by those jurisdictions
and shall be adhered to by the applicant. A letter approving the proposed
installations and a statement as to who will carry out the construction
shall be required.
K. Any off-tract water, sewer, drainage or street improvements required as a result of land development shall be paid for by the developer on a pro rata basis as determined by the Board. The costs shall be determined by proportioning the benefit to the site in relation to the benefit of the entire area being served, as specified in the standards set forth in the Chapter
330, Subdivision of Land.
L. All taxes and assessments against the site shall be
paid prior to the Board considering any application for preliminary
approval.
M. Any improvements required by §
330-35, Improvements, of Chapter
330, Subdivision of Land, that apply to a site plan.
N. Stormwater management standards for site plans are contained in §
330-49.
[Added 5-3-2006 by Ord. No. 2006-06]
[Amended by Ord. No. 11-1983; Ord. No. 16-2000; Ord. No. 2001-32]
A. Site plan details are primarily for the use of the
Board to establish criteria required to make decisions and recommendations.
The following documents shall be provided for a preliminary site plan
review. In some circumstances, additional information beyond these
may be required of the applicant. Surveys, the general plan, grading
and utility plans, landscaping plans, architectural plans, and elevations
may be indicated on separate drawings and documents. The scale shall
not be smaller than one inch equals 20 feet or on sheets exceeding
24 inches by 36 inches. The following details shall be indicated:
(1) Title, key map location of development, the name and
address of record owner and/or development applicant, and person preparing
the site development plan.
(2) Proposed use or uses of the land and buildings.
(5) Survey of the property prepared by a licensed surveyor
showing boundaries of properties, line of all existing streets and
roads, easements, rights-of-way and areas dedicated to public use
within 200 feet of the property.
(6) Existing and proposed buildings with dimensions showing,
with first floor elevation, present and finished grade elevations
at all corners and entrances. Present buildings and structures to
be removed should be indicated.
(7) Topographic map to delineate existing contours at
two-foot intervals, up to 10 feet beyond property lines, as well as
proposed grading and contours, wooded areas, trees (where six inches
or greater in diameter), floodplains, ponds, streams and drainage
ditches, etc.
(8) Location of all existing and proposed structures;
i.e., walls, fences, culverts, bridges, roadways, etc., with grade
elevations for each structure.
(9) Existing zoning district and of any different district
within 200 feet of the property.
(10)
Distance of the property line (measured along
the center line of existing streets abutting the property) to the
nearest intersection.
(11)
Building and setback lines.
(12)
Locations of all existing and proposed utility
structures and lines, including stormwater drainage, both on site
and to closest receiving stream and all soil logs and percolation
tests including those that fail to meet state standards.
(13)
Location and size of the entire lot or lots
in question, square feet of contiguous lots owned by the applicant
or owner of record, or in which the applicant or owner of record has
a direct or indirect interest, even though only a portion of the entire
property is involved in site plan development. Provide on a key map,
if necessary.
(14)
All proposed easements and public and community
areas.
(15)
Indicate means of vehicular ingress to and egress
from the site onto public roads, showing the size and location of
driveways, curb cuts and curbing, sight lines, and radii.
(16)
Location and design of off-street parking areas,
showing size, internal circulation, traffic patterns, parking space,
aisles, driveways, curbing, barriers and wearing surface finished
and construction.
(17)
Location, arrangement and dimensions of truck
loading and unloading platforms and docks.
(18)
Provisions for refuse and garbage disposal.
(19)
Provisions for screening.
(20)
Existing or proposed exterior lighting (freestanding
and/or on building) for size, nature of construction, lumens, heights,
area and direction of illumination, footcandles produced, as well
as time controls proposed for outdoor lighting and display.
(21)
Existing and proposed signs and their sizes,
construction and location, height and orientation, including all identification
signs, traffic directional signs and arrows, freestanding and facade
signs and time control for sign lighting, if any.
(22)
Location, dimensions and construction of off-site
walks and on-site exits, walks and sidewalks, with provision for pedestrian
safety, accessways and, where necessary, a bicycle system and racking.
(23)
Proposed screening, green areas, landscaping
and fencing as part of a planting plan and schedule (sizes, types,
number) prepared by a qualified landscape architect or landscape designer.
(24)
Improvements to adjoining roads, traffic control
devices necessary in roads or highways, acceleration and deceleration
lanes, paving and land dedication.
(25)
Copies of covenants, deed restrictions, and
easements intended to cover any of the development site.
(26)
Elevations, sketches, renderings, or pictures
of any new buildings or structures.
(27)
Preliminary architectural floor plans and elevations.
(28)
Appropriate places for signatures and date of
approval of the Chairman and Secretary of the Board.
(29)
Total floor area and proposed use of entire
structure and floor area.
(30)
An environmental inventory plan in accordance with §
330-30.
(31)
A hydrogeologic report in accordance with §
330-31.
A. Submission of final site plan.
(1) A final site plan and supporting drawings and documentation
constitute the complete development of the site plan proposal and
become the basis for the construction of the plan and inspection by
the Township.
(2) The site plan and any engineering and architectural
documents required shall be in final form and accurate for final approval
and construction.
(3) The applicant may, at his option, submit a final site
plan in stages to include only a portion of the original preliminary
site plan. Approval of the final site plan for a section shall not
extend the time limit of preliminary approval for the remaining sections.
(4) The Board shall insure that any improvements required
for the site plan as a whole, which might have an adverse effect on
an approved section if the remaining sections were not complete, shall
be installed as a condition of approval for any section. This shall
include but not be limited to roads, open space, recreation, soil
and erosion control and similar improvements.
The Board shall grant final approval of the
detailed drawings, specifications, and estimates if the application
for final approval conforms to the standards established by this chapter
for final approval and the conditions of the preliminary approval
within 45 days after submission of a complete application to the Secretary
of the Board or within such further time as may be consented to by
the applicant. Failure of the Board to act shall be issued on request
of the applicant, and it shall be sufficient in lieu of the written
endorsement or other evidence of approval.
A. Final approval of a site plan shall confer upon the
applicant the following rights for a two-year period after the date
of final approval:
(1) The zoning requirements applicable to the preliminary
approval first granted shall apply.
(2) All other rights conferred upon the applicant pursuant
to preliminary approval whether conditional or otherwise shall not
be changed.
B. The Board may extend such period of protection for
good cause by extensions of one year but not to exceed three extensions.
C. Notwithstanding any other provisions of this chapter,
the granting of final approval terminates the time period of preliminary
approval for the section granted final approval.
D. In the case of a site plan for 50 acres or more the
Board may grant extensions of time longer than two years as shall
be determined by the Board to be reasonable, taking into consideration
the number of dwelling units and nonresidential floor area permissible,
economic conditions and the comprehensiveness of the development among
others. In granting such extension, the Planning Board may attach
reasonable conditions to the extension, such as a required timetable
of development.
Final site plan details are primarily a refinement
of the preliminary details by providing final engineering and architectural
information which will be classified as site plan construction details.
The final data shall include all the data, changes and conditions
required on the preliminary site plan. Any changes from the preliminary
site plan shall be shown on an approved preliminary site plan map.
A. Prior to final site plan approval and as a condition
thereof, the developer shall:
(1) Furnish a performance guarantee in favor of the Township
in an amount not to exceed 120% of the cost of installation for improvements
it may deem necessary or appropriate as shown on the final site plan.
(2) Provide for a maintenance guarantee to be posted with
the Township Committee for a period not to exceed two years after
final acceptance of the improvement in an amount not to exceed 15%
of the cost of the improvement. In the event that other governmental
agencies or public utilities automatically will own the utilities
to be installed or the improvements are covered by a performance or
maintenance guarantee to another governmental agency, no performance
or maintenance guarantee, as the case may be, shall be required by
the Township for such utilities or improvements.
B. The amount of any performance guarantee may be reduced
by the Township Committee, by resolution, when portions of the improvements
have been certified by the Township Engineer to have been completed.
The time allowed for installation of the improvements for which the
performance guarantee has been provided may be extended by the Township
Committee by resolution.
C. If the required improvements are not completed or
corrected in accordance with the performance guarantee, the obligor
and surety, if any, shall be liable thereon to the Township for the
reasonable cost of the improvements not completed or corrected and
the Township may either prior to or after the receipt of the proceeds
thereof complete such improvements.
D. When all of the required improvements have been completed,
the obligor shall notify the Township Committee in writing, by certified
mail addressed in care of the Township Clerk, of the completion of
the improvements and shall send a copy thereof to the Township Engineer.
Thereupon the Township Engineer shall inspect all of the improvements
and shall file a detailed report, in writing, with the Township Committee,
indicating either approval, partial approval or rejection of the improvements
with a statement of reasons for any rejection. If partial approval
is indicated, the cost of the improvements rejected shall be set forth.
E. The Township Committee shall either approve, partially
approve or reject the improvements, on the basis of the report of
the Township Engineer, and shall notify the obligor in writing, by
certified mail, of the contents of the report and action of the Board
with relation thereto, not later than 65 days after receipt of the
notice from the obligor of the completion of the improvements. Where
partial approval is granted, the obligor shall be released from all
liability pursuant to its performance guarantee except for that portion
adequately sufficient to secure provision of the improvements not
yet approved. Failure of the Township Committee to send or provide
such notification to the obligor within 65 days shall be deemed to
constitute approval of the improvements and the obligor and surety,
if any, shall be released from all liability pursuant to such performance
guarantee.
F. If any portion of the required improvements are rejected,
the Board may require the obligor to complete such improvements, and
upon completion, the same procedure of notification as set forth in
this section shall be allowed.
G. The obligor shall reimburse the Township for all reasonable
inspection fees paid to the Township Engineer for the foregoing inspection
of improvements.
The regulations and standards set forth in this
article are for the protection of the public health, safety and welfare
of the citizens of the Township. However, if an applicant can demonstrate
that because of peculiar conditions relating to the application or
to the land it would be unreasonable or impossible to enforce one
or more of the regulations or requirements set forth herein, or that
it would exact undue hardship upon said applicant, the Boards may
permit such exceptions as may be reasonable and within the general
purpose and intent of the rules, regulations, and standards herein
established. The Board shall in its resolution set forth its findings
of fact and legal conclusions supporting said action.
Nothing in this article precludes a developer
from submitting his preliminary and final site plan as one submission,
providing all requirements of the final site plan shall be adhered
to.
The developer shall undertake construction in substantial conformance with the approved final site plan. If there are changes of conditions beyond the control of the developer since the date of final approval, and the dedication would not substantially alter the character of the development or substantially impair the intent and purpose of the Master Plan or Chapter
400, Zoning, the Planning Board may approve new deviations from the final site plan.
The Secretary of the Board approving the final
site plan shall certify three full sets, on each page, with an appropriate
stamp showing date approved, file number, Chairman's signature and
Secretary's signature. One set shall be given to the applicant, one
to the Zoning Enforcement Officer for his use and one set shall be
retained in the official files of the Board.
There shall be submitted with each site plan application in order to defray the cost of review of the site plan the fees set forth in Article
VII.
Failure to comply with any of the conditions
of site plan approval subsequent to the receipt of a building permit,
zoning permit or certificate of occupancy, as the case may be, shall
be grounds for the revocation of any building permit, zoning permit
or certificate of occupancy, as the case may be. A written notice
of revocation sent by certified mail by the Zoning Officer or Construction
Official, as the case may be, shall specify the conditions of site
plan approval which have been violated, and such revocation shall
effectively terminate the validity of any building permit, zoning
permit or certificate of occupancy theretofore issued.
In the event of the revocation of any building
permit, zoning permit, or certificate of occupancy, the applicant
shall agree to correct the deficiencies which led to the revocation.
Such correction of deficiencies shall include, but not be limited
to:
A. Agree to any necessary land or structural modifications.
B. Obtain Planning Board approval that such applications
are satisfactory.
C. Obtain new permits or certificates from the Zoning
Officer.
D. Post any necessary bonds or performance guarantees
as may be required by the Planning Board to insure compliance with
the correction of deficiencies.
[Added 5-18-2005 by Ord. No. 2005-07]
A. Definitions. As used in this section, the following
terms shall have the meanings indicated:
OUTDOOR LIGHT FIXTURE
An electrically powered illuminating device for nonresidential
uses containing a total light source of more than 1,800 initial lumens
per fixture (this is greater than a single one-hundred-watt incandescent,
or two seventy-five-watt reflectorized incandescent bulbs), which
is permanently installed outdoors, including, but not limited to,
devices used to illuminate any site, architectural structure or sign.
SHIELDED LIGHT FIXTURE
A light fixture with cutoff optics for nonresidential uses
that allows no direct light emissions above a vertical cutoff angle
of 90 degrees above nadir (straight down at perfect vertical), through
the light fixture's lowest light emitting part. Any structural part
of the light fixture providing this cutoff angle must be permanently
affixed.
B. Purpose and intent. The purpose and intent of this
section is to preserve the rural and historic character of Lebanon
Township; to prevent misdirected or excessive artificial light, caused
by inappropriate or misaligned light fixtures that produce glare,
light trespass (nuisance light) and/or unnecessary sky glow from nonresidential
uses; to discourage the waste of electricity and to improve or maintain
nighttime public safety, utility and security. This section applies
to all outdoor light fixtures for nonresidential uses outputting 1,800
lumens or greater.
C. Outdoor lighting. All outdoor light fixtures for nonresidential
uses shall be installed and maintained to comply with the following
requirements:
(1) Where used for security purposes or to illuminate
walkways, roadways and parking lots, only shielded light fixtures
shall be used.
(2) Light fixtures for nonresidential uses used to illuminate
flags, statues, or any other objects mounted on a pole, pedestal,
or platform shall only use a narrow cone beam of light that will not
extend beyond the illuminated object.
(3) All externally illuminated building identification,
other signs, or advertisements for nonresidential uses shall use shielded
top-mounted light fixtures whenever feasible. When top-mounted light
fixtures are not feasible, illumination from other positioned light
fixtures shall be restricted to the target area. Visors or other directional
control devices shall be used to keep spill light to an absolute minimum.
(4) Other upward directed architectural, landscape or
decorative direct light emissions for nonresidential uses shall have
at least 90% of their total distribution pattern within the profile
of the illuminated structure.
(5) All floodlight-type fixtures for nonresidential uses,
once properly installed, shall be permanently affixed in the proper
position.
(6) All externally illuminated building identification,
other signs, advertisements and parking lot lighting for nonresidential
uses shall be designed so that they turn off no later than 1/2 hour
after closing.
(7) Recreational and sports facility lighting shall be shielded whenever possible. Such lighting shall have directional and glare control devices, when necessary, to comply with Subsection
C(3).
D. Light trespass.
(1) Lighting shall not project off the property of a nonresidential
use. At the property line of a nonresidential use, illumination from
light fixtures shall not exceed 0.1 footcandle in a vertical plane,
measured at five feet above the property line.
(2) Outdoor light fixtures for nonresidential uses shall
be installed and maintained so that there will be no objectionable
direct light emissions.
E. Prohibited lighting source types for nonresidential
uses. Exterior light globes, unshielded sources, mercury vapor lights,
off-site lighting of outdoor advertisements, laser source lights,
searchlights, arc lights, pulsed or flashing lights shall be prohibited.
F. Streetlighting. For roadways over which Lebanon Township
has authority, the following standards shall apply:
(1) Roadway lighting may be installed at the discretion
of the designated municipal entity.
(2) All new and replacement streetlights, including decorative
streetlights, shall be cutoff luminaires.
(3) Average IES illuminance recommendations shall not
be exceeded.
G. Parking lots. Parking lot lighting for nonresidential
uses shall meet the requirements of this section with illumination
levels as shown in Schedule A.
H. Plans required. Plans shall include the following:
(1) Description of outdoor light fixtures including specifications
such as lamps, reflectors, optics, angle of cutoff, supports, poles
and include manufacturer's catalog cuts.
(2) Location and description of every outdoor light fixture
and the hours of operation.
(3) Location and description of motion detectors for security
lighting and the light fixtures controlled by the unit.
(4) Maintained horizontal illuminance shown as footcandles
(after depreciation), including the following:
(c)
Average during operating and nonoperating hours.
(d)
Maximum to minimum ratio.
(e)
Average to minimum ratio.
(5) Photometric grid showing average footcandles every
10 feet or less.
(6) Foundation details of light poles.
(7) Height of mounting of light fixture.
I. Nighttime lighting test. A nighttime lighting test/inspection
shall be required prior to the issuance of a certificate of occupancy
for any project requiring site plan approval. The Planning Board or
Board of Adjustment, as the case may be, shall retain jurisdiction
for one year from the date of the issuance of the certificate of occupancy.