The applicant/owner shall provide a financial
guarantee to the Township of Falls for the timely installation and
proper construction of all stormwater management facilities as required
by this chapter equal to 110% of the full construction cost of the
required facilities.
[Amended 12-18-2018 by Ord. No. 2018-11]
A. Stormwater management facilities shall be inspected by the applicant
or owner or responsible entity (including the Township Engineer for
dedicated facilities) in accordance with the Township's stormwater
management operations and maintenance agreement.