Where a combined cut and fill slope exceeds
twenty-five (25) feet in height, the required drainage bench shall
be placed at the top of the cut slope. The effect of surcharge of
the fill material on the cut sections shall be investigated by a soils
engineer and a report shall be submitted to the City Engineer with
the application.