Unless otherwise provided and as regulated by
the Subdivision Regulations of the Town of Concord, a site plan review
and a site plan approval shall be required for all uses, buildings
and structures that require a building permit or certificate of zoning
compliance under this chapter and for which an application therefor
has been made to the Town of Concord, except for a single-family dwelling
or a two-family dwelling and its permitted accessory uses, buildings
or structures, prior to the issuance of a building permit or certificate
of zoning compliance.
In addition to the required site plan and supporting data indicated in §
150-175, the Concord Town Planning Board may request of a property owner or his or her agent additional supporting data or plans the Concord Town Planning Board deems necessary and pertinent to carry out its responsibility for site plan review as provided in this chapter.
The property owner or his or her agent shall
submit at least six copies of a site plan and supporting data prepared
by and bearing the official seal and signature of a licensed architect,
landscape architect, civil engineer or land surveyor and may include
the following information, presented in drawn form, at a scale approved
by the Code Enforcement Officer of this chapter and accompanied by
a written text:
A. Survey of the property, showing existing topographic
features, including contours, large trees, buildings, structures,
streets/roads, property lines, utility easements, rights-of-way and
land use, and zoning and ownership of surrounding property. An appropriate
copy of the Concord Town Zoning Map pertaining to the property in
question, with the location of the premises of the site plan clearly
indicated on said Zoning Map, shall be required.
B. Site plan showing proposed lots, blocks, building
locations and land use areas.
C. Traffic circulation, parking and loading spaces and
pedestrian walks.
D. Landscaping plans, including site grading and landscape
design.
E. Preliminary engineering plans, including street/road
improvements, storm drainage system, public utility extensions, water
supply, sanitary sewer facilities and outdoor lighting.
F. Preliminary architectural drawings for buildings to
be constructed.
G. Construction sequence and time schedule for completion
of each phase for buildings, parking spaces and landscaped areas.
The Concord Town Board may require as a condition
of site plan approval that the property owner file a performance bond
in such amount as determined by the Town Attorney of the Town of Concord
to insure that the proposed development will be built in compliance
with accepted plans.
A property owner wishing to make any changes
in an approved site plan shall submit a revised site plan to the Concord
Town Planning Board for review and recommendation to the Concord Town
Board for approval.