[Added 3-14-2016 by L.L. No. 1-2016[1]]
It is the intent of the PUD (Planned Unit Development District) to provide greater flexibility and opportunity for the development of mixed uses in specific areas of the Town. Innovative design and creative mixes of uses are encouraged to offer the potential for a sustainable development that can provide economic opportunities, residential housing and jobs and service bases consistent with the objectives of the Hamburg Comprehensive Plan. There are no prescribed combinations of uses or specific quantities of elements that are required. It will require the applicant to demonstrate to the Town of Hamburg how their proposed project meets the objectives of the Hamburg Comprehensive Plan and the needs of the citizens and businesses of the community without harming the character of the area.
[1]
Editor’s Note: This local law also redesignated former § 240-144 as § 240-144.1.
Uses and structures permitted in the PUD District are as follows:
A. 
Principal uses and structures:
[Amended 1-11-1993 by L.L. No. 1-1993; 1-26-1998 by L.L. No. 1-1998; 1-14-2013 by L.L. No. 1-2013; 3-14-2016 by L.L. No. 1-2016]
(1) 
Principal uses and structures permitted in all Hamburg zoning districts, except that uses first allowed in the M-3 District shall be prohibited.
(2) 
Permitted uses shall be mixed to provide for a variety of use types and services that are coordinated within a designated area, subject to approved concept and development plans for the entire site. If approved, the concept/development plan and any conditions placed on the approval shall act as the zoning of the site.
(3) 
Special uses as regulated in the Town's zoning districts.
B. 
Accessory uses and structures:
(1) 
Accessory uses and structures permitted and as regulated in the R-4, NC, HC and M-2 Districts.
[Amended 1-26-1998 by L.L. No. 1-1998]
A. 
The minimum size of residential lots in the PUD District shall be as specified in the cluster development laws in this Zoning Code. Minimum lot sizes for any other nonresidential uses or multifamily residential uses shall be determined on recommendation by the Planning Board.
[Amended 1-26-1998 by L.L. No. 1-1998; 1-14-2013 by L.L. No. 1-2013]
(1) 
The minimum designated area for a PUD shall not be less than 10 acres.
(2) 
The clustering and grouping of permitted uses are encouraged along with flexibility of lot size requirements to provide innovations of design and uses for the protection of open space or recreation features or the creation of community features that will enhance both public and private development.
A. 
Maximum. Unless otherwise provided, the maximum height of principal buildings shall be 65 feet.
B. 
Accessory buildings: one story, not to exceed 18 feet.
[Amended 12-18-2017 by L.L. No. 3-2018]
There shall be no minimum required yards, subject to approved concept and development plans for the entire PUD area and consistent with any adjoining R, C, or M District. Side yards shall typically not be less than 10 feet, unless a specific waiver is received from the Town Building Department.
[1]
Editor’s Note: Former § 280-148, Off-street parking, § 240-149, Signs, and § 240-150, Supplemental regulations, were repealed 3-14-2016 by L. L. No. 1-2016.
[Added 3-14-2016 by L.L. No. 1-2016]
A. 
Creation of a PUD shall follow the same procedures and processes for a rezoning of a site as outlined in Article XLVIII.
B. 
The rezoning application must include a concept/development plan which, if approved, will represent the zoning of the site. Any conditions placed on the rezoning shall also be incorporated into the PUD plan and enforced in any future approvals by the Planning Board.
C. 
Any amendments to an approved PUD shall follow the same procedures and processes as a new PUD zoning designation.
D. 
Upon approval of the PUD zoning designation by the Town Board, the project will need to proceed to site plan and, if necessary, subdivision approvals with the Town Planning Board, prior to any construction or building permits being issued.
[Added 11-7-2022 by L.L. No. 5-2022]
A. 
Large PUD projects including multiphases will have time frames set at the time of approvals.
B. 
If the time frames set for the construction of these phases are exceeded, the applicant/owner need to return to the Town Board to update the PUD.