The applicant's engineer or qualified designee shall make inspections according to the submitted and approved inspection schedule. At the completion of the project, and as a prerequisite for the release of the guaranty as described in Article VIII of this chapter, the owner or his designee shall:
A. 
Provide a certificate of the completion from an engineer, architect or surveyor, or other qualified person, verifying that the inspections have been made and that all permanent facilities/controls have been constructed according to the plans and specifications and approved revisions thereto.
B. 
Submit any testing results such as the compaction of the earth berm for any detention basins if required by the governing body.
C. 
Any portion of the work which does not comply with the approved plans must be corrected by the permittee within that time period specified by the governing body or designee. No work may proceed on any subsequent phase of the drainage site plan, the subdivision or land development or building construction until the required corrections have been made.
D. 
If at any stage of the work, the governing body or its designee determines that the soil or other conditions are not as stated or shown in the approved application, the governing body may suspend or revoke existing permits until a revised plan is submitted and approved, as required by § 140-20 of this chapter.