Prior to final approval, the Planning Board
shall have received the following:
A. A letter from the applicant's engineer or surveyor
containing a list of all items to be covered by a performance guaranty,
cash or certified check, the quantities of each item, the cost of
each of them and the total amount of all items.
B. A letter from the Borough Engineer stating that the
required improvements have been installed to his satisfaction and
in accordance with applicable Borough specifications and that the
performance guaranty is adequate to cover the cost of remaining improvements.
C. A letter from the applicant's engineer stating that
the final plat conforms to the preliminary plat as submitted and approved.
Prior to granting of final approval, the subdivider shall have installed the following improvements, except as set forth in §
104-14 of this article:
A. Streets, except the wearing course.
D. Monuments, to be of the size and shape required by
N.J.S.A. 46:23-9.4 and to be placed in accordance with the statute.
E. Four-foot concrete sidewalks, with a minimum thickness
of four inches. Sidewalks over driveway areas shall be constructed
with a minimum thickness of six inches.
F. Sanitary sewers and sewage disposal facilities, dry-cap
sewer lines with appropriate taps, to be installed in accordance with
specifications of the State Department of Health and the plans and
specifications for which shall be approved by the Borough Engineer.
Necessary auxiliary facilities shall also be installed by the subdivider
where sewer lines are to be connected to an existing central sewer
system.
G. Connection of water service with that of the Borough
of Branchville if in the opinion of the Borough Engineer it is feasible
to use or connect with the water system of the Borough. All water
mains and pipes within the development shall be furnished at the expense
of the subdivider and constructed in accordance with plans to be first
approved by the Borough Engineer.
H. Culverts, inlets and storm sewers, to be installed
where necessary, in the opinion of the Borough Engineer, based on
conditions of topography and to adequately take care of the anticipated
runoff from such subdivision.