All materials used in the work shall conform
to the requirements of these specifications, unless the same are altered
by specific requirements under any itemized specification, or upon
the Town Planning Board's approval of modifying notes shown upon the
submitted plans. In the absence of specific references in these specifications
to other standards, the material to be incorporated into any project
and the work performed are to conform to the latest edition of the
New York State Department of Transportation's Standard Specifications,
as determined by the town's Engineer.
In order to assure the structural integrity
of the subgrade and foundation course, the following general rules
shall apply:
A. Underground utilities shall be constructed outside
the pavement area.
B. Where crossover trenches are required for utility
services, the trenches shall be backfilled with Item 203.07, Select
Granular Fill, compacted in accordance with Section 203-3.15 of the
Standard Specifications.
(1) Developers shall note that this requirement includes
crossovers for gas mains and other utilities and services.
(2) All utility crossings shall be installed prior to
the installation of any stone base.
(3) All utility lines crossing the roadway shall have
a minimum of twenty-four-inch cover from the finished grade to the
crown of the utility conduit; this includes service laterals, gas,
electric, and cable television.
C. After properly shaping and obtaining approval of the subgrade from the town inspector, the foundation course may be placed. Refer to §
183-36 (Inspection) of these specifications for further detail.
D. Foundation courses for permanent roads must not be
used for access roads in wet weather, or at such times when the subgrade
could become pumped into the foundation course.
E. Where pavements must be placed on an embankment, the
entire embankment must be constructed as required by the appropriate
provisions of Section 203 of the Standard Specifications. If required
by the Town Highway Superintendent or the town inspector, the developer
and/or contractor shall provide results of certified compaction tests
undertaken by a competent soils testing laboratory approved by the
town's Engineer.
All excavated or grubbed material shall be reused
or disposed of as provided for in Section 203 of the Standard Specifications
or the appropriate town ordinance.