(11.1)
|
Bid packages: $5 per bid package unless a higher
amount established by the Township Purchasing Officer as set forth
in the notice to bidders.
[Added 5-13-1992 by Ord. No. 0-92-11] |
(11.2)
|
Copy of a tape, CD, or DVD from a board or committee
meeting: $10 per tape.
[Added 9-13-1994 by Ord. No. 0-94-13; amended 10-11-2006 by Ord. No. 0-06-23] |
Type
|
Application
Fee
|
Escrow To Be Deposited
| |
---|---|---|---|
Minor subdivision
|
$400
|
$600 per lot
| |
Preliminary plat
|
$500
| ||
Up to 20 lots
|
$200 per lot
| ||
20 or more lots
|
$150 per lot
| ||
Final plat
|
$500
|
$100 per lot
| |
Subdivision certificate of approval
|
$100
|
None required
| |
Time extension
|
$100
|
Utilize existing escrow
|
Type
|
Application
Fee
|
Escrow To Be Deposited
|
---|---|---|
Residential concept plan
|
$400
|
A minimum of $1,000 shall be deposited, $50
per unit for the first 200 units and $10 per unit for the remaining
units.
|
Nonresidential concept plan
|
$400
|
A minimum of $1,000 shall be deposited, $0.05
per sq. ft. for the first 200,000 sq. ft. and $0.025 for the remaining
sq. ft.
|
Minor site plan
|
$400
|
$1,000
|
Preliminary plan
|
$500
|
A minimum of $750 shall be deposited. Calculation
of escrow fee shall be as follows: $75 per acre or part thereof. In
addition, for residential: $5 per dwelling; for commercial: $0.10
per sq. ft. or part thereof of total proposed building area up to
and including 20,000 sq. ft., and $0.07 per sq. ft. for every additional
sq. ft. or part thereof over 20,000 sq. ft.
|
Final plan
|
$500
|
A minimum of $375 shall be deposited. Calculation
of escrow fee shall be as follows: $35 per acre or part thereof. In
addition, for residential; $3 per dwelling; for commercial: $0.05
per sq. ft. or part thereof of total proposed building area up to
and including 20,000 sq. ft. and $0.03 per sq. ft. for every additional
sq. ft. or part thereof over 20,000 sq. ft.
|
Time extension
|
$100
|
Utilize existing escrow
|
Type
|
Application
Fee
|
Escrow To Be Deposited
| |
---|---|---|---|
General development plan
|
$500
|
Same as preliminary plans
| |
All other conditional use approvals
|
$250
|
$2,500
| |
Appeals under N.J.S.A. 40:55D-70a
|
$200
|
$500
| |
Interpretation or special questions under N.J.S.A.
40:55D-70b
|
$200
|
$500
| |
Bulk variances under N.J.S.A. 40:55D-70c
| |||
Residential
|
$100
|
$500
| |
Nonresidential
|
$250
|
$2,000
| |
Use variances under N.J.S.A. 40:55D-70d
|
$250
|
$2,500 for each variance
|
Withdrawal From Program
|
Refund per child
|
---|---|
30 plus days prior to first day of program
|
75%
|
15 to 29 days prior to first day of program
|
50%
|
6 to 14 days prior to first day of program
|
25%
|
5 to 0 days prior to first day of program
|
No refund
|