Cost of Project1
|
Fee
| |
---|---|---|
Less than $10,000
|
No fee
| |
$10,000 to $25,000
|
$40
| |
$25,001 to $50,000
|
$100
| |
$50,001 to $100,000
|
$175
| |
$100,001 to $200,000
|
$300
| |
$200,001 to $350,000
|
$400
| |
$350,001 to $500,000
|
$500
| |
More than $500,000
|
$750 minimum, plus $75/$100,0002 cost of project over $800,000
|
Notes:
1. Total value of work being permitted “cost
of project” is derived from and considered to be the value of
materials plus labor. Self-performed labor is considered to have value;
that implied value being included within this definition and being
used for permit cost determination.
2. The added cost per $1,000 refers to the additional
$1,000 (or part thereof) of total value of the work being permitted.
Fees shall not be interpolated.
|
Cost of Project1
|
Fee2
| |
---|---|---|
Up to $1,000
|
$60
| |
$1,001 to $100,000
|
$60, plus $16/$1,000
| |
$100,001 to $200,000
|
$1,650, plus $12/$1,000 after first $100,000
| |
$200,001 to $350,000
|
$2,950, plus $10/$1,000 after first $200,000
| |
$350,001 to $500,000
|
$4,450, plus $10/$1,000 after first $350,000
| |
$500,001 and up
|
$5,950, plus $6/$1,000 after first $500,000
|
Notes:
1. Total value of work being permitted “cost
of project” is derived from and considered to be the value of
materials plus labor. Self-performed labor is considered to have value;
that implied value being included within this definition and being
used for permit cost determination.
2. The added cost per $1,000 refers to the additional
$1,000 (or part thereof) of total value of the work being permitted.
Fees shall not be interpolated.
|
Cost of Project1
|
Fee
| |
---|---|---|
Up to $500
|
$45
| |
$501 to $1,000
|
$60
| |
$1,001 to $2,000
|
$74
| |
$2,001 to $3,000
|
$88
| |
$3,001 to $4,000
|
$102
| |
$4,001 to $5,000
|
$116
| |
$5,001 to $10,000
|
$140, plus $12/$1,0002
| |
$10,001 and up
|
$140, plus $11/$1,0002
|
Notes:
1. Total value of work being permitted “cost
of project” is derived from and considered to be the value of
materials plus labor. Self-performed labor is considered to have value;
that implied value being included within this definition and being
used for permit cost determination.
2. The added cost per $1,000 refers to the additional
$1,000 (or part thereof) of total value of the work being permitted.
Fees shall not be interpolated.
|
Category
|
Fee
| ||
---|---|---|---|
Billboards/Marquees
|
$350
| ||
Signs
|
$60/face
| ||
Pylon signs
|
See building schedule, plus $60/face
| ||
Aboveground pools
|
$35
| ||
Wood stoves
|
$65
| ||
Tents larger than 2,400 square feet
|
$75
| ||
Temporary electrical service
|
$50
| ||
Electrical (pools only)
|
$30
| ||
Road opening (private contractors)
|
$200, plus $1.50/linear foot
| ||
Demolition permit (residential)
| |||
Up to $50,000 of value
|
$50
| ||
$50,001 to $150,000 of value
|
$150
| ||
$150,001 of value and over
|
$250
| ||
Demolition permit (commercial)
|
$500
| ||
Inspection conducted at request of owner
|
$45
| ||
Business license inspection
|
$45
| ||
Reinspection fee (for prior failed inspection
or inaccessibility of structure for inspection)
|
$45
| ||
Late fee for work without permit
| |||
If permit is applied for within 3 days of notice
|
$75
| ||
If permit applied for within 4 to 7 days of
notice
|
$100
| ||
If permit applied for within 8 to 14 days of
notice
|
$150
| ||
If permit applied for after 14 days of notice
or if no action is taken to apply for required permit
|
Legal action taken by Town against violator
| ||
Certificate of use and occupancy (CO) (issued
to new construction)
|
$50
| ||
Letter of compliance (issued to existing buildings
and where construction has occurred for an existing structure; letter
may be requested only after all final inspections are completed)
|
$30
| ||
Letter of conformance (for lead inspections)
|