Plan Review Fee Schedule
| ||||
---|---|---|---|---|
Subdivision proposals involving street construction
|
$210 per lot
| |||
Land development proposals, including but not limited to residential,
planned development, commercial, business, and/or industrial major projects
|
$350 per acre1,2
| |||
Business properties - individual sites
|
$350 per acre1,2
| |||
Industrial properties - individual sites
|
$350 per acre1,2
| |||
Multifamily development projects
|
$350 per acre1,2
| |||
Planned development projects - multifamily properties
|
$350 per acre1,2
| |||
Planned development projects - single-family properties
|
$210 per unit or lot
| |||
Drainage projects
|
$1.60 per linear foot, plus $200 per structure (detention/retention
facilities)
| |||
Flood control and management projects
|
$350 per acre of project construction area
| |||
Street improvements to unimproved and/or substandard streets
|
$1.60 per linear foot
| |||
Water line installation design review
|
$0.10 per linear foot or minimum $50, whichever is greater
| |||
Sewer line installation design review
|
$50 per structure plus $0.10 per linear foot or minimum $50, whichever
is greater
| |||
Soil erosion and sedimentation control designs
| ||||
Applicability determination
|
$25
| |||
Permit review
| ||||
Residential use:
| ||||
Single lot
|
$50
| |||
Subdivision, multifamily land development project, and/or planned development
project
|
$300 base fee, plus $25 per acre for each acre over 10 acres
| |||
Nonresidential use:
| ||||
Less than 1/2 acre
|
$50
| |||
One-half acre to less than five acres
|
$300
| |||
Five acres or more and disturbance less than one acre
|
$500
| |||
Five acres or more and disturbance greater than or equal to one acre
|
$500, plus $100 per acre of disturbance
| |||
Landscaping construction design proposals
|
$100, plus $100 per acre of project construction area3
| |||
Retaining wall construction
|
$100, plus $2 per linear foot of proposed wall greater than four feet
in height
|
NOTES:
|
1Areas to be based on the limit of disturbance
as shown on plans.
|
2Amount is incorporated within Planning Board
fees for item and applicant will not be double-charged.
|
3This fee applicable only if a soil erosion
permit has been determined to be inapplicable or the review for the construction
project is included within another category (i.e., subdivision, land development
project, etc.).
|
Inspections Fee Schedule
| |
---|---|
Sanitary sewer main extension
|
$2 per linear foot plus $50 per manhole plus $50 per service lateral
or minimum $50, whichever is greater
|
Low-pressure grinder pumps
|
$50 per installation
|
Subdivision and land development projects - inspection of required improvements
|
$60 per hour
|
Inspection of required improvements for all other construction projects,
industrial, business, commercial, residential, governmental, highway/street,
soil erosion, and the like, that are not classified as a subdivision or land
development project
|
$60 per hour
|