No new street or streets shall be accepted or approved by the
Borough Council of the Borough of Parkside unless and until the owner
or owners of the land abutting thereon shall fully comply with the
following requirements of the Borough:
A. Sewers shall first be installed in the bed of said street or streets,
which said sewers shall be installed and constructed strictly in accordance
with the specifications and requirements of the Borough of Parkside and under the supervision of the Borough Engineer.
B. The roadway of said street or streets shall first be paved by said
owners as required by Borough Council and in strict accordance with
the Borough paving specifications and under the supervision of the
Borough Engineer.
C. Curbing on each side of the roadway shall be installed and constructed
by the owners in accordance with specifications and requirements of
Borough Council and under the supervision of the Borough Engineer.
D. Sidewalks shall be laid and constructed on both sides of the roadway
or street by the owners thereof in accordance with the specifications
for sidewalks as prescribed by Borough Council and shall be laid and
constructed under the supervision of the Borough Engineer.
No building permit shall be issued by the Building Inspector
of the Borough of Parkside for the erection or construction of any
dwelling or building whatsoever on any new street laid out in the
Borough unless and until all of the provisions of this article have
been complied with.
It shall be unlawful for any person, persons or corporations
to plan, lay out or open any street in violation of this article and
to sell lots on said street for the purpose of inducing any person
or persons to build thereon when, under the provisions of this article,
no building permit could be obtained for that purpose.
[Amended 12-21-1988 by Ord. No. 349]
Any person or persons violating the provisions of this article
shall, upon conviction before any District Justice, be required to
pay a fine of not less than $300 nor more than $600, together with
the costs of prosecution, and in default thereof, shall be committed
to the county prison for a period of not more than 30 days.