A. 
The use and operation of heavy commercial vehicles having a carrying capacity of more than 2.5 tons are hereby restricted on the following named streets or parts thereof and in the marked outlines in the times set forth:
Location
Mill Street
Champney Street
B. 
Loading or unloading construction vehicles on the right-of-way. There will be no unprotected loading or unloading of heavy construction equipment, tracked or with rubber tires, along the public right-of-way, to access a construction site. If it is not possible to do so, it will be done as close to the construction site as possible and the operator will be responsible for providing protection to the surface of the road. This may be done by using wood, tires, etc., as long it protects the surface of the road from being damaged. If, in the opinion of the DPW Director, damage has occurred to the road, then the operator or company who unloaded the equipment on the right-of-way will be responsible to repair the damage.