No connection shall hereafter be made to the sanitary sewer collection system unless the proposed development satisfies any one of the following criteria:
A.
B.
The development will replace a building, at the same location, which was connected and actively discharging wastewater to the Borough's sanitary sewer collection system at the effective date of this article, and the replacement facility will create flow equal to or less than the former facility, calculated in accordance with either one of the following:
(1)
The projected flow of the proposed building is less than or equal to the projected flow of the existing building based on the criteria contained in N.J.A.C. 7:14A-23.3; or
(2)
The projected flow of the proposed building, based on N.J.A.C. 7:14A-23.3, is equal to or less than the actual flow of the existing building based upon water records for the most recent twelve-month period available.
C.
The owner/applicant of the project has obtained a building permit prior to the effective date of this article and is otherwise lawfully entitled to initiate construction in conformance with previously issued valid approvals.
D.
There exists a necessary immediate and sufficient public need for a proposed development such as for health, safety, food or shelter, there are no reasonable alternatives including alternate sites, and the project is publicly owned or operated.