On inspection and approval, the building permit
shall be endorsed and dated and the installer shall provide an as-built
plan detailing layout and design of septic system.
The Franklin Board of Health accepts any and
all provisions of Title V of the State Environmental Code (310 CMR
15.00), regarding the location, design and construction of subsurface
sewage disposal systems, in the entirety.