Where, in the opinion of the Engineer, it is
considered necessary to save the walk from damage by frost action,
drains of four-inch tile shall be laid to the lines and grades given
by the Engineer.
Expansion joints shall be extended from the
surface to the subgrade and be truly at right angles to the sidewalk
surface. They shall be placed as follows:
A. At or near all places where the sidewalk line intersects
a curbline or other sidewalk, a one-inch expansion joint shall be
made at right angles to the center line of the walk.
B. A one-half-inch expansion joint shall be made across
the walk at approximately fifty-foot intervals.
The base shall be deposited on the subgrade
and thoroughly compacted by tamping. It shall then be struck off by
a template which shall leave it nowhere less than 3/4 of an inch below
the finished surface.
Before the initial set of the bottom course
has taken place, it shall be covered by the mortar for the top coat.