[Amended 8-17-2004 by Ord. No. 2004-15; 9-4-2007 by Ord. No. 2007-17; 3-4-2014 by Ord. No. 2014-4; 5-1-2018 by Ord. No. 2018-03]
Every application for development shall be accompanied by a
check payable to the Township of Stillwater in accordance with the
following schedule. For purposes of this section, the term "area being
disturbed" means any area whereupon any activity involving the clearing,
excavation, storing, grading, filling or transporting of soil will
occur, or whereupon any other activity will occur which causes soil
to be exposed to the danger or erosion, including the detachment or
movement of soil or rock by water, wind, ice and/or gravity.
A. Subdivisions.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. I)]
Subdivision
|
Application Charge
|
Review Escrow
|
---|
Minor subdivision
|
$250
|
$2,000 (Replenish at $1,000)
|
Preliminary major subdivision
|
$500
|
$750 per lot
|
|
|
$3,500 Maximum (Replenish at $1,500)
|
|
|
$20,000 Maximum initial deposit
|
Final major subdivision
|
$350
|
$250 per lot
|
|
|
$3,500/Maximum (Replenish at $1,500)
|
|
|
$10,000 Maximum initial deposit
|
Concept plan*
|
|
|
|
Minor subdivision
|
$150
|
$1,000 (Replenish at $500)
|
|
Major subdivision
|
$250
|
$2,000 (Replenish at $1,000)
|
Amended minor, preliminary, major or final major
|
$200
|
$300 per lot
|
|
|
$2,000 Maximum (Replenish at $1,000)
|
|
|
$10,000 Maximum initial deposit
|
Minor subdivision: lot line adjustment
|
$200
|
$1,500
|
B. Site plans.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. I)]
Site Plan
|
Application Charge
|
Review Escrow
|
---|
Minor site plan
|
$250
|
$2,000 (Replenish at $1,000)
|
Preliminary major site plan
|
$250
|
$2,000 per acre of disturbance
|
|
|
$3,500 Minimum (Replenish at $1,500)
|
|
|
$10,000 Maximum initial deposit
|
Final major site plan
|
$250
|
$1,000 per acre of disturbance
|
|
|
$2,500 Minimum (Replenish at $1,500)
|
|
|
$10,000 Maximum initial deposit
|
Concept plan*
|
|
|
|
Minor site plan
|
$125
|
$1,000
|
|
Major site plan
|
$125
|
$2,000
|
House occupation
|
$150
|
$300
|
Amended minor, preliminary, major or final major
|
$200
|
$2,000 Minimum (Replenish $1,500)
|
Site plan waiver
|
$100
|
$600
|
*
|
Fee and escrows paid in connection with concept applications
shall be credited toward the fee and escrows required for minor and
major subdivision and minor and major site plan applications once
submitted within one year of the Board's review of the concept plan.
|
C. Variances.
Variances
|
Application Charge
|
Review Escrow
|
---|
Appeals (40:55D-70a)
|
$100 Residential
|
$1,000 each
|
|
$200 Commercial/industrial
|
|
Interpretation (40:55D-70c)
|
$100 Residential
|
$1,000 each
|
|
$200 Commercial/industrial
|
|
Bulk (40:55D-70c)
|
$100 Residential
|
$1,000 each
|
|
$200 Commercial/industrial
|
|
Use (40:55D-70d)
|
$200 Residential
|
$2,000
|
|
$500 Commercial/industrial
|
|
Permit (40:50D-34 and 35)
|
$100 Residential
|
$1,000
|
|
$200 Commercial/industrial
|
|
Unimproved Street (40:55D-36)
|
$100 Residential
|
$1,000
|
|
$200 Commercial/industrial
|
|
D. Variances pursuant to N.J.S.A. 40:55D-70c(1) or (2) included in §
240-90C above.
E. Variances pursuant to N.J.S.A. 40:55D-70d included in §
240-90C above.
F. Variances pursuant to N.J.S.A. 40:55D-36 included in §
240-90C above.
G. Conditional use application and escrow review fees included in §
240-90C above.
H. Transcription fees. One-hundred-percent estimated costs at $4.50
per page. If estimated fees are insufficient, the person ordering
the transcript shall pay the full actual cost to the Township.
I. Revision fees for applications previously approved included in §
240-90A and
B above.
J. For items not covered: $300.
K. Special meeting fees: $1,000, or the actual cost to the Township
of Stillwater, whichever is greater. The applicant shall deposit the
sum of $1,000, with the Township at least five days in advance of
the special meeting. Any balance owed shall be paid within seven days
after the conclusion of the meeting.
L. Zoning permits.
Zoning Permit Value
|
Fee
|
Late Fee
|
---|
Residential additions and accessory structures
|
|
|
Construction
|
|
|
|
Up to $20,000
|
$30
|
$20
|
|
Greater than $20,000 but less than $50,000
|
$40
|
$25
|
|
Greater than $50,000
|
$50
|
$30
|
New home
|
$75
|
$30
|
Home occupation
|
$40
|
$20
|
Commercial minor alterations, signs and accessory structures
|
|
|
|
Up to $10,000
|
$40
|
$20
|
|
Greater than $10,000 but less than $100,000
|
$75
|
$20
|
|
Greater than $100,000
|
$100
|
$50
|
Letters of certifications or approvals
|
$30
|
|
M. Informal concept review N.J.S.A. 40:55D-10.1 (presentation limited
to 45 minutes). Whenever the Planning Board shall grant informal review
of concept plan for a development, the fee for such information review
shall be a credit towards fees for review of the application for development
in accordance with the provisions of N.J.S.A. 40:55D-10. An applicant
desiring to have a concept plan or plat informally reviewed shall
so notify the Planning Board Secretary, who shall place the matter
on the agenda at the most convenient time for the Board.
N. Annexation. For hearing on a petition for annexation:
$1,000.
O. Farmland preservation. To review a petition for inclusion
of a parcel in a municipally approved farmland preservation program:
$500.
P. Waiver of fees. When an application is made by a nonprofit
charitable corporation, by a fire company which is part of the Township
Fire Department, a first aid and rescue squad receiving appropriations
from the Township, or a governmental agency, Township, state or federal,
the municipal agency having jurisdiction of the application may in
its discretion, waive all or part of any filing fee hereinabove provided
for.
Q. GIS update
fees on certain development applications.
(1) Subdivision: minor, amended minor: $150
(2) Subdivision: preliminary major, amended preliminary or amended final
major: $150, plus $50 per lot.
(3) Subdivision: final plat: $200.
(4) Site plan: minor, amended minor: $150.
(5) Site plan: residential preliminary major, amended preliminary or
amended final major: $150 plus $50 per unit.
(6) Site plan: nonresidential preliminary major, amended preliminary
or amended final major: $150 plus $50 up to 5,000 square feet; $150
for up to 20,000 square feet; and $300 for over 20,000 square feet.
(7) Site plan: final major: 25% of the preliminary site plan GIS update
fee if filed separately; $0 if filed with the preliminary.
(8) Planned development: preliminary plat, amended preliminary or amended
final: $150 plus $50 per additional unit.
(9) Planned development: final plat: 35% of the preliminary plat GIS
update fee if filed separately; $0 if filed with the preliminary.
(11)
Dimensional or "C" variance: $50 for each variance in conjunction
with site plan or subdivision; $25 for each variance without site
plan or subdivision.
(12)
Use or "D: variance: residential: $150.
(13)
Use or "D" variance: nonresidential: $150.