[Adopted 12-23-1996 by Ord. No. 197-08]
A. 
Service tapping charge (replacement).
Tap Size
(inches)
Charge
3/4
$403
1
$537
1 1/2
$910
2
$1,021
B. 
Water Department service tapping charge (new building).
Tap Size
(inches)
Charge
3/4
$408
1
$537
C. 
All other sizes must be done by owner.
D. 
In the event any of the above services are performed by other than Water Department personnel, a fee of $25 shall be charged for inspection.
A. 
Minimum charges per quarter.
Meter Size
(inches)
Water Allowance
(cubic feet)
Minimum Charge
5/8
1,300
$22.28
5/8 x 3/4
1,300
$22.28
3/4
1,500
$24.75
1
3,100
$51.70
1 1/2
5,100
$84.70
2
8,500
$137.50
3
18,300
$300.30
4
29,500
$481.80
6
56,000
$915.20
8
91,200
$1,492.70
B. 
All water consumed in excess of water allowance shall be charged at the rate of $16.50 per 1,000 cubic feet.
A. 
Sprinklers with hose connections and hydrants.
Size of Line
(inches)
Charge
3
$349.80
4
$466.40
6
$734.80
8
$1,049.40
10
$1,282.60
(1) 
Water shall be turned on and admitted into the premises of the consumer when the supply shall have been cut off for any purpose other than for repairs not chargeable to the consumer for a fee of $25.
B. 
Sprinklers without hose connections and hydrants.
Size of Line
(inches)
Charge
3
$146.30
4
$204.60
6
$408.10
8
$583.00
10
$729.30
A. 
Residential.
Number of Units
Charge
1 to 3 units
$35.20 (flat fee)
4 or more units
$17.60 (per unit)
B. 
Commercial and industrial.
Size of Construction Area
(square feet)
Charge
To 10,000
$70.40
10,001 to 20,000
$105.60
20,001 to 30,000
$174.90
Over 30,000
$268.40