[HISTORY: Adopted by the Board of Health of the Borough of
Raritan 11-10-1965 (Ch.
55, Art. I, of the 1966 Code). Amendments noted where applicable.]
GENERAL REFERENCES
Uniform construction codes — See Ch.
123.
Housing standards — See Ch.
195.
[Amended 7-10-1974]
In connection with the provisions of this chapter and the code
hereby adopted as a part hereof, the following fees shall be charged
and received:
A. In general:
(1) For the examination of any applicant for a license as a master plumber:
$75.
(2) For the issuance and annual renewal of a license as a master plumber:
$10.
(3) For the filing of each plan for proposed plumbing or heating work:
$2.
(4) For each reinspection of plumbing or heating work caused by the failure
of the licensee to comply with the provisions of the code or permit
issued: $10.
B. As to commercial or industrial work: for the issuance of a permit
for a proposed plumbing or heating construction or alteration, including
inspection thereof, $50; provided, however, that the following fees
shall be charged and received:
(1) For each fixture above five: $3 per fixture.
(3) For each indirect heater: $10.
(4) For each water supply from curb to building:
|
Supply Pipe
(inches)
|
Fee
|
---|
|
3/4
|
$10
|
|
1
|
$20
|
|
1 1/4
|
$30
|
|
1 1/2
|
$40
|
|
2 and up
|
$50
|
(5) For each unit heater: $5.
(6) For each dishwashing machine: $10.
(7) For each clothes-washing machine: $10.
(8) For each clothes dryer: $5.
(9) For each refrigeration unit: $5.
(10)
For each water conditioner: $10.
(11)
For each temporary construction unit: $25.
(12)
For each boiler, furnace, air conditioner or combination thereof,
including rooftop units (based upon BTU, input or bonnet capacity):
|
BTU Capacity
|
Fee Per Unit
|
---|
|
Up to 200,000
|
$20
|
|
200,001 to 500,000
|
$30
|
|
500,001 to 750,000
|
$40
|
|
750,001 and up
|
$50
|
(13)
For the inspection of any cross-connections between an approved
and an unapproved water supply: $25 per valve unit.
C. As to residential work:
(1) For the issuance of a permit for a proposed new plumbing system,
including inspection thereof, $15; and for the renovation, alteration
or modification of an existing plumbing system, $10; provided, however,
that the following fees shall be charged and received:
(a)
For each fixture above five: $2 per fixture.
(c)
For each water softener: $5.
(d)
For each clothes-washing machine: $5.
(e)
For each water cooler: $5.
(g)
For each disposal unit: $5.
(j)
For a fuel oil tank: $10.
(k)
For a coal-, gas- or oil-fired heating system, including oil
tank: $10.
(l)
For an automatic, gas hot-water heater: $3.
(2) For the inspection of any portion of any system between the outer
wall of a building and the curb or septic tank, including but not
limited to storm sewer, sanitary sewer, waterline and the like: $10.
(3) For inspection of the capping of each building sewer at the curb
of a building scheduled for demolition: $10.