A disposal works permit must be obtained before a building permit
will be issued in unsewered areas. Percolation tests must be made
for new or repair work. All work must be performed by a licensed installer.
Permits are not necessary when having a sanitary system pumped, but
such work must be done by a licensed firm.
All food establishments, including catering, must be inspected
by the Board of Health before obtaining a common victualer license.