A. 
No water mains or extensions shall be laid within any subdivision in the Town of Poestenkill except after final subdivision approval therefor has been granted by the Planning Board of the Town of Poestenkill pursuant to Chapter 195, Subdivision of Land, of the Code of the Town of Poestenkill.
B. 
No water mains or extensions thereof shall be laid within any water district in the Town of Poestenkill except in strict conformity with Article 12 or Article 12-A of the Town Law.
C. 
No water mains or extensions thereof shall be conveyed to or accepted by the Town of Poestenkill or any water improvement district therein without:
(1) 
Formal application having been made to the Town of Poestenkill and all fees paid.
(2) 
Approval of plans and inspection of facilities as required by the Rensselaer County Health Department and the Town of Poestenkill.
(3) 
Periodic inspection during construction by the Town Engineer.
(4) 
Written certification by the Town Engineer that the facilities have been installed in accordance with said approved plans.
(5) 
Filing by the contractor of adequate proof that there are no unpaid subcontractors or materialmen and that there are no related unpaid liens therefor.
(6) 
Filing by the contractor of as-built plans for the entire installation.
(7) 
The filing of a maintenance bond by the contractor guaranteeing the performance and function of the system without defects or deficiencies for a period of two years.
(8) 
Execution by the contractor of a bill of sale in form and content approved by the Town Attorney conveying the system as built to the Town of Poestenkill or to a water district therein.
(9) 
The adoption by the Town Board of a resolution accepting the system "as built" for future operation and maintenance by the Town and/or said water district.