[HISTORY: Adopted by the Town Meeting of the Town of Middlefield as indicated in article histories. Amendments noted where applicable.]
[Adopted 3-1-1989; amended in its entirety 9-22-2003 (Ch. 11, Art. I, § 11-4, of the 1990 Code)]
Pursuant to § 8-1c of the Connecticut General Statutes, there is established a schedule of fees for the processing of land use applications.
For the purpose of this article, the following definitions shall apply:
PUBLIC IMPROVEMENTS
Public improvements include, but are not limited to, the construction of new roads to standards approved by the Planning and Zoning Commission, whether such roads are to be privately owned or conveyed to the Town; improvements to existing roads, storm drainage facilities, water and sewer lines, the planting of trees or other landscaping; and the installation of retaining walls or other structures, common driveways, or any other facilities that are required to meet Town specifications or the conditions of a Town board, and which need to be inspected during construction.
Commissions shall charge fixed application fees for the processing of land use applications in accordance with the following schedule:
Planning and Zoning Commission
Subdivision plans
$200/lot
+ $1.50/lineal foot of road
+ $1/lineal foot of common driveway
+ 5% of costs of public improvements (this 5% to be collected after approval but prior to the issuance of the endorsements of Mylars)
First divide lot
$100
Subdivision regulations amendment
$250
Zone map change
$250
Zone regulation change
$250
Special permit
$200
+ $0.35/square foot of gross building floor area and improved land area up to 4,000 square feet; thereafter at $0.10/square foot
Site plan
Same as special permit
Certificate of zoning compliance, per C.G.S. § 8-3f, as amended:
a.
Single-family residential
$100
b.
Multifamily
$200/dwelling unit (DU)
+5% of public improvements
+ $1.50/lineal foot of road
+$1 lineal foot of common driveway
Miscellaneous permits
a.
Home occupation (non-special permit)
$75
b.
Excavating/filling
$100 minimum or $40/1,000 yards of material, whichever is greater
c.
Renewal of an approval application
$150
d.
Additional charge for any application issued after construction has begun
$150, first offense
+$150 for each additional offense thereafter
e.
Driveway permit
$50
f.
Zoning status opinion
$75
g.
Revisions to septic plan
$25
Zoning Board of Appeals
Variances/zoning enforcement officer appeals/other applications
$200
All boards and agencies of the Town of Middlefield, including the use of fire company properties for fire protection purposes, shall be exempt from the payment of fees established pursuant to this article, at the discretion of the commission where the application will be pending.
All fees shall be paid by cash, check or money order made payable to the Town of Middlefield. Fees shall be paid at the time of application submission. Failure to comply with this section shall be grounds for denial of any application without prejudice or revocation of any permit previously issued. The payment of fees is in addition to any type of bonding required to ensure the successful completion of all work required.