Fee Schedule
| |||
---|---|---|---|
Type
|
Fee
| ||
Residential 1- and 2-family
|
$0.15 per square foot
| ||
Residential additions
|
$0.15 per square foot
| ||
Accessory buildings 144 square feet or less
|
$20
| ||
Accessory buildings greater than 144 square feet
|
$50
| ||
Porch/deck 100 square feet or less
|
$20
| ||
Porch/deck greater than 100 square feet
|
$0.10 per square foot (minimum $20)
| ||
Porch/deck for ADA compliance for accessible ramps
|
$0
| ||
Swimming pools
|
$50
| ||
Wood stove/chimney
|
$50
| ||
Multiple dwellings
|
$0.15 per square foot
| ||
Demolition permit
|
$50
| ||
Mobile home installation
|
$0.15 per square foot
| ||
Commercial construction
|
$0.15 per square foot
| ||
Mobile home park development and existing park expansion
|
$10 per lot
| ||
Ordinance Office Plaza reoccupancy application review fee
|
$75
| ||
Planning Board site plan review - reoccupancy
|
$100 + $20 per required parking space
| ||
Planning Board site plan review - new commercial development
|
$75 + $45 per required parking space
| ||
Planning Board subdivision review
|
$200 + $50 per lot
| ||
Zoning Board of Appeals use or area variance
|
$90
| ||
Zoning Board of Appeals special use permit
|
$90
| ||
Letters of zoning compliance
|
$50
| ||
Planning Board and Zoning Board of Appeals special meeting
|
$500
| ||
Town Board rezoning request
|
$250
| ||
Sign permit fee
|
$50 per sign
| ||
Dog license fees
| |||
Spayed or neutered dog license
|
$15
| ||
Unspayed or unneutered dog license
|
$25
| ||
15-day late fee
|
$5
| ||
Unlicensed enumeration dog license surcharge
|
$25
| ||
Replacement identification tag surcharge
|
$3
| ||
Guide, hearing, service, war, working search, detection, police
work or therapy dogs
|
Exempt
| ||
Environmental Quality Review Fees
| |||
Residential projects
|
Not to exceed 2% of total project cost
| ||
Nonresidential projects
|
Not to exceed 1/2 of 1% of total project cost
| ||
Public assemblies; mass gatherings permit fee
|
$500
| ||
Public records copying fee
|
$0.25 per page
| ||
Peddling, vending and soliciting fee
|
$250 for 1 week per calendar year
| ||
Stormwater Management and Erosion and Sediment Control
| |||
Full SWPPP review
|
$2,500
| ||
Basic review
|
$500
| ||
Site inspection fees
|
2% of the total estimated cost of all improvements, including
all temporary and permanent stormwater erosion control measures as
determined by Chenango Town personnel or Town consultants
| ||
New Wireless Telecommunications
| |||
New wireless telecommunications tower
|
$5,000
| ||
Collocate on wireless telecommunications tower
|
$2,000
| ||
Recertify wireless telecommunications tower
|
No fee
| ||
Recertify modified wireless telecommunications tower
|
Fees as per above
| ||
Water and Sewer Connection Fees
| |||
3/4-inch water main tap
|
$350
| ||
Greater than 3/4-inch water main tap
|
Market price
| ||
5/8-inch water meter
|
$205
| ||
Sewer connection
|
No fee
| ||
Hydrant use permit
|
$1,000 deposit
| ||
Water cost
|
$25 per 100 cubic feet (748 gallons), 100 cubic feet minimum
| ||
Meter rental fee
|
$75 per month
| ||
Meter charge
|
$300
| ||
Solar - Commercial Solar Energy System
| |||
Site plan review application fee
|
$600
| ||
Stormwater pollution protection plan
|
$2,000
| ||
Building permit application fee
|
$500
| ||
Building permit renewal fee
|
50% of original fee
| ||
Solar - Residential Solar Energy System
| |||
Building permit application fee
|
$75
| ||
Electric vehicle charging station
|
$100 per charging stall
|