Fee
First $1,000 of estimated cost of construction
$20
Each additional $1,000 or part thereof
$12
Sewer rehab fee additional, per $1,000, except single-family homes
$10
Change of occupancy
$60
Demolition, swimming pools, paving
$12 per $1,000 of estimated cost
Signs
$60 minimum
Starting work without a permit
Fee x 2
Zoning Board of Appeals petition
See Zoning Board of Appeals Rules and Regulations
Zoning Board of Appeals legal ad
$100
Building Board of Appeals petition
$75
Paving license
$50
Builders' licenses
$100
1-year renewal
$30
Renewal after expiration (2 years maximum)
$35
Upgrade examination
$30 per category
Copies
Fees as described by Office of Documents, Secretary of State
Public safety inspection fees
See chart on file in the office of the Director of Inspectional Services
Fee
Gas
Minimum permit fee
$30
Furnaces and boilers
$25
Conversion burners
$25
Rooftop units
$25
Unit heaters
$20
Pool heaters
$20
Hot water heaters – plumbing and gas combination
$60
Electric/in-direct/storage tank
$20
All other appliances/fixtures
$10
Reinspection fee
$30
Plumbing
Minimum permit fee
$30
Reduced pressure backflow preventor
$25
Hot water heaters – plumbing and gas combination
$60
All other fixtures
$10
Sewer connections
$25
Starting job before securing permit
Double fee
Fee
Residential
Initial fee
$40
New dwelling structures – single-family complete service, rough and finish, fire alarm, attached garage, and all appliances on initial permit
$250
Each additional dwelling unit over a single family
$100
Residential service change
Up to a 200 amp with 1 meter
$50
Each additional 100 amp
$25
Each additional meter
$20
Subpanels (each)
$10
Other Residential Work
Any major appliance which requires a separate branch circuit
$10
Central air conditioning
$25
Electric vehicle charger
$10
Energy saving lighting program
1 to 10 luminaires
$10
11 or more (each)
$0.50
Fire alarm, burglar alarm, and CCTV per system up to 20 devices
$25
Each additional device
$1
Generators (per KW)
$2
Hot tub
$50
Hydro massage tubs (each)
$10
Non-metallic siding re-securing of electrical equipment
$10
Oil or gas burner
$10
Outlets, switches, receptacles, luminaires, 120 volt smokes, tel-data
1 to 10
$10
11 or more (each)
$1
Photovoltaic system
$50
Subpanels (each)
$10
Swimming pools
Above ground
$50
In ground
$90
Temporary repairs after a fire
$25
Temporary service
$25
Temporary wiring
$25
Commercial/Industrial
Initial fee
$50
New service up to 1,000 amps (per amp)
$0.40
Each amp over 1,000 (per amp)
$0.30
Subpanels (each)
$10
Service change
Up to a 200 amp with 1 meter
$50
Each additional 100 amp
$25
Each additional meter
$20
Other Commercial/Industrial Work
Air conditioner with blower unit (per)
$40
Any major appliance which requires a separate branch circuit
$20
Carnival
$100
Cellular antenna (new or replacement)
$200
Electric heat per branch circuit
$10
Electric vehicle charger
$20
Emergency lights (each)
$2
Energy saving lighting program
1 to 10 luminaires
$10
11 or more (each)
$0.50
Fire alarm, burglar alarm, and CCTV per system up to 20 devices
$50
Each additional device
$1
Gas pumps (per dispenser)
$25
Generators (per KW)
$2
Maintenance fee
$200
Motors
First
$10
Each additional
$5
Office cubicle (per circuit)
$10
Outlets, switches, receptacles, luminaires, tel-data
1 to 10
$20
11 or more (each)
$1
Parking lot lighting (per pole)
$10
Photovoltaic system
Up to 5 KVA
$75
Over 5 KVA, each additional KVA
$1
Temporary service
$50
Temporary wiring
$50
Transformers
Up to 5 KVA
$20
Over 5 KVA, each additional KVA
$1
Uninterruptible power systems (per KVA)
$1
Wire sign (per)
$25
A. 
Miscellaneous.
(1) 
A fee equal to double the cost of the permit will be charged on the 6th day after work commences for which there is no permit.
(2) 
An additional fee of $50 shall be paid by the electrician for each additional inspection necessitated by defective work, by the use of improper materials, incorrect address, inability to gain access at the scheduled time, or other inaccurate information.
(3) 
For all items not specifically itemized, the fee will be determined.
Fee
Balance and scales (pounds)
Over 10,000
$150
5,000 to 10,000
$100
1,000 to 5,000
$75
100 to 1,000
$50
0 to 100
$35
Weights
Avoirdupois (each)
$3
Metric (each)
$3
Apothecary
$3
Troy
$3
Capacity Measures
Vehicle tank each indicator
$20
Each 100 gallons or fraction thereof
$20
Liquid
1 gallon or less
$5
More than 1 gallon
$10
Liquid measuring meters
Inlet 1/2 inch or less
Water vending
$25
Oil, grease
$25
Inlet more than 1/2 inch to 1 inch
Gasoline
$30
Blended grades
$15
Inlet more than 1 inch
Vehicle tank pump (in town)
$75
Vehicle tank pump (out of town)
$85
Vehicle tank gravity
$75
Bulk storage
$100
Company supplies prover
$75
Pumps
Each stop on pump
$10
Other devices
Taximeters
$40
Odometer — hubodometer
$40
Leather measure (semiannual)
$25
Fabric measuring
$25
Wire – rope – cordage
$25
Scanner accuracy (number of scanners)
1 to 3
$75
4 to 10
$150
11+
$250
Linear measures
Yardsticks
$10
Tapes
$10
Miscellaneous
Milk jars (per gross)
$15
Dry measures
$5
Bottle returns
$25
Adjusting - repairs - special facilities
1/2 sealing fee