[CC 1976 §5-18; Ord. No. 1800 §2, 5-11-1981; Ord. No. 2469 §4, 1-23-1989; Ord. No. 92-59 §2, 11-9-1992; Ord. No. 99-73 §3, 9-14-1999]
It shall not be lawful to commence any construction, alteration,
removal or demolition of a building or structure without first filing
with the Building Commissioner an application in writing and obtaining
a formal building permit. Before a building permit is issued, a building
permit fee shall be paid to the City of Overland in accordance with
the following tables:
Building Valuation
|
Building Permit Fees
|
---|
The Building Commissioner may waive a permit fee and not require
the issuance of a building permit, where, in his/her judgment, no
inspection may be required and where, a homeowner is making a non-structural
change involving his/her own labor and a material cost of less than
five hundred dollars ($500.00)
|
|
Less than $1,000.00
|
$50.00
|
|
Plus $5.00 for each $1,000.00 or fraction thereof over the first
$1,000.00
|
|
Normal inspection fees are included in the above schedule of
building permit fees, however, where, in the judgment of the Building
Commissioner, additional inspections are required and/or where inspections
are called for by the contractor, but the work is found not ready
for inspection and/or where the work fails to pass inspection and
a re-inspection is required, then an additional ten dollars ($10.00)
per such inspection will be made and must be paid before an occupancy
permit is issued.
|
[CC 1976 §5-19; Ord. No. 1800 §3, 5-11-1981; Ord. No. 2469 §5, 1-23-1989; Ord. No. 99-73 §3, 9-14-1999]
A building permit is valid for one (1) year from the date of
issuance. Work must begin within six (6) months from issue date and
be completed within one (1) calendar year from the issue date, or
the permit is void. The cost of any renewal of a building permit will
be the same as the fee for an original building permit for the extent
of the work remaining to be done.
[CC 1976 §5-20; Ord. No. 1800 §4, 5-11-1981; Ord. No. 2469 §6, 1-23-1989; Ord. No. 99-73 §3, 9-14-1999]
A. It
shall not be lawful to construct or alter any sign without first filing
with the Building Commissioner an application in writing and obtaining
a formal sign permit. Before a sign permit is issued a sign permit
fee shall be paid to the City of Overland in accordance with the following
schedule:
Sign Permit Fees Required
|
---|
Twenty-five (25) square feet or less of exposed sign surface
|
$50.00
|
Each additional twenty-five (25) square feet or fraction thereof
(with the maximum fee not to exceed $500.00)
|
$10.00
|
Banners and other temporary signs
|
$10.00
|
B. No
sign permit will be required nor will any fee be charged for conventional
temporary political signs nor for conventional, temporary real estate
"For Sale" signs or "For Rent" signs which are properly located on
the private property which is for sale or for rent; however, the City
Council reserves the right to order the removal of any sign for which
no permit has been issued.
[CC 1976 §5-21; Ord. No. 1800 §5, 5-11-1981; Ord. No. 2469 §7, 1-23-1989; Ord. No. 99-73 §3, 9-14-1999]
It shall not be lawful to commence any use of land or building
within the City requiring a special permit or conditional permit without
first filing with the Building Commissioner an application in writing
therefor and obtaining a formal permit approved by the appropriate
agency of the City. A special permit and a conditional permit fee
shall be paid to the City in accordance with the following schedule:
Special permit fees and conditional permit fees
|
$5.00
|