[Ord. No. 14.201 §1, 3-19-1979; Ord. No. 14.204 §1, 2-4-1985; Ord. No. 2004-036 §1, 2-2-2004; Ord. No. 2005-002 §1, 4-5-2004; Ord. No. 2006-2005 §1, 3-22-2005; Ord. No. 14.525 §1, 1-2-2007]
There is on file in the office of the City Clerk and incorporated herein a Schedule (Chart), labeled City of California Electric Rates Effective 2007. Effective January 2, 2007, for the usage and billing cycle immediately following, said rates shall be in full force and effect for all electrical power customers of the City at the scheduled rate noted.
[R.O. 2006-2005 §1, 3-22-05]
The Schedule (Chart) titled Demand Charge is effective April 1, 2005, for the cycle immediately following, includes rates which shall be in full force and effect for certain large power and industrial electrical power customers of the City, specifically those customers with a load in excess of twenty-five (25) kW, at the scheduled rate noted.
Demand Charge Schedule
Large Power With Demand Billing
Demand Charge
All kW:
$5.50/kW
Energy Charge
All kWh:
$0.057/kWh
Industrial With Demand Billing
Demand Charge
All kW:
$5.50/kW
Energy Charge
All kWh:
$0.051/kWh