[Added 6-7-2016 by L.L.
No. 2-2016]
A stormwater pollution prevention plan consistent with the requirements of Chapter
308 shall be required for site plan approval. The SWPPP shall meet the performance and design criteria and standards in Chapter
308. The approved site plan shall be consistent with the provisions of Chapter
308.